• 제목/요약/키워드: Construction Project Control System

검색결과 258건 처리시간 0.032초

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Earned Value 기반 프로젝트 관리체계 및 사례연구 (Earned Value based Construction Project Control System)

  • 이유섭;조창연;오규환;김정훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.123-130
    • /
    • 2002
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획${\cdot}$관리함에 있어서 일정, 비용, 성과측정, 현금흐름(cash flow)예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리한 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

  • PDF

EV기반 공사관리시스템 기능의 비교분석 연구 (Earned Value based Construction Project Control System)

  • 이유섭
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.168-174
    • /
    • 2004
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획$\cdot$관리함에 있어서 일정, 비용, 성과측정, 현금흐름 예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리할 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

지열발전 시추공 구축 프로젝트관리시스템 개발 (Development of Project Management System for Geothermal Well Construction)

  • 김광염;이승수
    • 신재생에너지
    • /
    • 제8권3호
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

4CM기반의 건설사업관리 시스템 개발 및 구현 (The Design and Implementation of Project Management Information System based on 4CM)

  • 최성연;김재수
    • 디지털산업정보학회논문지
    • /
    • 제7권2호
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템 (ICT-BIM based Quality Nonconformity Control Method for Construction Project)

  • 손상혁;이형국;배상희;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

AUTOMATED PROJECT CONTROL SYSTEM FOR STEEL PROJECTS

  • Reza Azimi;SangHyun Lee;Simaan M. AbouRizk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-486
    • /
    • 2009
  • This paper presents an integrated real-time monitoring and control framework that facilitates decision making by enabling project managers to take corrective actions right after any deviation happens and mitigate the damage to the ongoing steel projects. The proposed framework employs the High Level Architecture (HLA) as its infrastructure. It is composed of several individual monitoring and control components called "Federates," which cooperate and interact with each other through the Real-time Infrastructure (RTI). Reusability, interoperability and extendibility of federates in the proposed project control system make this a unique system.

  • PDF