• 제목/요약/키워드: Construction Method

검색결과 13,867건 처리시간 0.036초

철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구 (Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit)

  • 황영호;손정철;백종명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

BTL 적용 교육시설의 최적 건축공법 평가에 관한 연구 (A Study on Evaluation of Optimal Construction Method of BTL Projects - Focused on Educational Facilities -)

  • 박유영;조봉호;김기현;이춘경;박태근
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.22-31
    • /
    • 2009
  • BTL사업 형태로 발주되는 교육시설의 공사에서는 소요 공기 최소화와 임시교사 설치로 인한 별도의 비용 소모, 그리고 학기 중에 학교 사용자들이 겪는 불편사항으로 주무관청, 민간사업자 그리고 학교사용자의 갈등이 깊어지는 문제가 발생하고 있다. 본 연구에서는 이러한 당면 과제를 공법적인 측면에서 해결하고자, 기존 학교 공사에 일반적으로 적용되는 RC공법과 최근 몇 년 사이에 교육시설의 대안공법으로 주목받고 있는 모듈러 공법을 포함한 몇 개의 대안을 설정하고 교육시설의 BTL사업에 적합한 건축공법을 제안하였으며 각 대안에 소요되는 공사비를 산출하고 공사기간을 분석하여 이를 평가하였다.

건축공법 내부 리스크 분석에 관한 연구 (A Study on the Risk Analysis of Construction Method)

  • 윤여완;양극영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.117-121
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

건축공법 내부 리스크 분석에 관한 연구 (A Study on the Risk Analysis of Construction Method)

  • 윤여완;양극영
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.131-135
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

철도지하횡단공사시 현장계측을 통한 지반거동 분석 (The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using Field Measurement)

  • 엄기영;신민호;김지훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.546-551
    • /
    • 2001
  • We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.

  • PDF

단독주택의 구조체 공사에 있어 Tilt-up 공법의 현장적용 (Application of Tilt-Up Construction Method for Building Single-Family house)

  • 전세미;김명길;안연수;소광호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.136-137
    • /
    • 2015
  • Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.

  • PDF

평창 동계올림픽 슬라이딩센터의 곡면콘크리트 트랙 시공을 위한 기술제안 (Technology Proposal for Curved Concrete Tracks Construction of 2018 Winter Olympic Sliding Center in Pyeongchang)

  • 박영미;김혜원;박기홍;조성준;김성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2014
  • For the curved concrete track construction of 2018 winter Olympic sliding center in Pyeongchang, in this study proposed the digital fabrication technology using CNC. This method can control the 3D geometries of the curved concrete structure based on the digital design. Conventional method generates the construction errors because this method fabricates many temporary zig bar using 1:1 full size drawing for install frozen pipes and sets up each zig bars at the construction site. Propose method is effective to ensure the precise fabrication and construction of zig bars. Also this method can eliminate errors of the frozen pipes position and curved concrete construction.

  • PDF

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

DATA ACQUISITION METHOD USING A SMARTPHONE ON CONSTRUCTION SITE

  • Ahra Jo;Teahoon Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.231-234
    • /
    • 2013
  • According to the recent development of USN technology, it has been applied in various fields of construction management. In particular, the concrete curing management using the wireless measurement system is actively being conducted. However, the existing method has limitations such as the reinstallation of temperature sensors and repositioning of repeaters. It is also not easy to acquire the measured data. Thus, this study focuses on the concrete curing management. This study proposes data acquisition method using the smartphone on construction site and tests applicability of the data measuring device and the smartphone. The test allows us to suggest the actual communication distance on construction site and to determine the correction value that is applied to the measured temperature. The data acquisition method proposed in this study is intended to enable appropriate management on construction site and will be able to be applied effectively to a variable construction site. It can also be used in all fields of construction management.

  • PDF