The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.357-363
/
2011
Mediation has long been praised as one of effective dispute resolution methods in the area of construction law. Article 85-1 of the Taiwan Government Procurement Act was amended and promulgated by presidential decree on July 4, 2007. The second paragraph of the Article elaborates explicitly, "In the event that the application for mediation referred to in the preceding paragraph is made by the supplier, the agency may not object to such application." Beyond that, if an unsuccessful mediation of a construction dispute is due to the agency's disagreeing with the proposal or resolution for mediation proposed by the Complaint Review Board for Government Procurement ("CRBGP"), the agency may not object to the arbitration filed by the supplier. It undoubtedly reinforces the importance of the mediation-arbitration procedure. Accordingly, this paper elaborates on the mediation mechanism in Taiwan in the framework of construction disputes first. After that, dispute resolution of a local public work case is provided to demonstrate the practice of construction mediation in Taiwan. Lastly, this study proposes suggestions on applying mediation to ease similar subsequent cases.
In this study, we analyzed 82 dust damage dispute mediation cases over the past 5 years and evaluated cases where the probability of damage was verified through dust concentration measurement, modeling prediction, and chemical composition analysis. The cause of dust damage was a construction site, which accounted for most of the damage (97%), and was closely related to the distance from the construction site, total floor area of the construction site, and construction duration. Compensation was decided in only 33% of dust damage cases, and in only 6% (five cases) were damages determined using scientific techniques such as dust measurement, and forecasting. The main criteria for determining compensation were whether administrative measures were taken and evidence of damage in the form of videos and photos. In the future, measuring or model for the amount of dust damage is necessary to determine whether the limit has been exceeded and to revise the standard for calculating compensation through various lines of evidence of dust damage.
Recently people have come to demand more pleasant environments as the quality and right of life have been improved. Along with industrial development, the tendency is causing a growing number of disputes concerning environmental damages. Of many kind of environmental damages, noise and vibration pollution rising at construction fields are particularly the most common subjects of public grievance. Thus the government launched the Environments Dispute Mediation Committee in 1991, purposing to utilize fully the promptness and expertise of administrative institutes and to resolve environmental damage disputes promptly and fairly by interfering in them actively. With the prompt and fair dispute mediations of the committee, people came to be able to get fair and prompt remedies for damages in their health and fortune by environmental pollution. Therefore, by analyzing dispute mediation cases on construction noise and vibration damages, we will suggests basic material on which efficient actions can be takes for public grievances happening in the future.
건설사업의 기획단계부터 설계단계에 미처 반영되지 못해 문제가 잠재되거나, 공사계약이행단계에서 다양한 변경요인이 있음에도 제대로 대처하지 못할 경우 건설계약과 관련하여 문제가 발생하게 된다. 그러므로 건설공사계약에는 반드시 분쟁의 해결절차를 명시하고 있다. 건설분쟁은 공공공사와 같이 대규모 건설현장 뿐만 아니라 소규모 민간건설현장에서도 발생되고 있다. 지금까지 우리나라에서는 건설분쟁의 해결절차개선과 관련하여 다수의 논의가 있었으나 건설분쟁해결절차와 관련된 문제가 근본적으로 해결되지 못하였다. 따라서 본 연구에서는 다음과 같은 사항을 제시하였다. 첫째, 가칭 건설분쟁조정법률을 제정하여 건설계약분쟁을 다룰 수 있는 가칭 건설분쟁조정중재원의 설립근거를 마련하고, 조정, 중재 등의 업무를 다루도록 해야 한다. 둘째, 민간 및 공공부문의 건설계약분쟁을 담당할 수 있도록 가칭 건설분쟁조정중재원의 업무는 현장협의체지원, 조정, 중재 등의 업무로 한정해야 한다. 셋째, 건설계약분쟁해결을 위해 계약체결시 조정이나 중재중 선택하도록 하고, 계약이행중에는 현장협의체를 운용하도록 해야 한다. 넷째, 분쟁처리기구는 상설기구로 하고, 전국 각지에 지부를 운영해야 한다. 다섯째, 다양한 영역의 건설전문가들을 위원으로 참여시켜 신속하게 건설계약분쟁이 처리될 수 있도록 해야 한다. 마지막으로, 건설계약분쟁처리기구의 단일화와 함께 건설분쟁처리절차를 명시하고 있는 관련법령을 개정해야 한다.
Recently people have come to demand more pleasant environments as the quality and right of life have been improved. Along with industrial development, the tendency is causing a growing number of disputes concerning environmental damages. Of many kinds of environmental damages, noise and vibration pollution rising at construction fields are particularly the most common subjects of public grievance. Thus the government launched the Environmental Dispute Mediation Committee in 1991, purposing to utilize fully the promptness and expertise of administrative institutes and to resolve environmental damage disputes promptly and fairly by interfering in them actively. With the prompt and fair dispute mediations of the committee, people came to be able to get fair and prompt remedies for damages in their health and fortune by environmental pollution. Therefore, by analyzing dispute mediation cases on construction noise and vibration damages, we will suggest basic material on which efficient actions can be taken for public grievances happening in the future.
This paper deals with the effects of teamwork competence on problem solving ability through the mediating effect of creative personality for the engineering students. For this purpose, a regression-based statistical mediation analysis has been performed for a simple mediation model in which teamwork competence and problem solving ability were treated as independent and dependent variables respectively, and creative personality was included as a mediation variable. The analysis results showed that the teamwork competence has direct effect on the problem solving ability as well as indirect effect through the creative personality. This result implies that the problem solving ability can be improved directly by improving the teamwork competence, and moreover, it can be further improved indirectly or through the mediation effect by improving the creative personality. Thus, in order to develop excellent problem solving ability, it is necessary to form team members in a balanced way between teamwork competence and creative personality in the team-based learning.
The construction noise and vibration is a serious social problem in the downtown. This results in many expenses and delays of construction process because of the satisfactory settlement of popular complaints. In this study, we analyze the dispute mediation cases on the damages of construction noise and vibration and the noise and vibration condition in construction sites by using questionnaire surveys.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.350-356
/
2011
Early neutral evaluation (ENE) is a fairly recent form of alternative dispute resolution procedure used in the construction industry. In the UK, ENE is usually carried out on an entirely without prejudice basis, however the parties may agree that any or part of it may be referred to at trial or any subsequent hearing. The early neutral evaluation consists of a preliminary assessment of the issues in dispute for use as a basis for negotiations which may result in a settlement of the dispute. An independent person is appointed by the parties who reviews the case and provides an opinion, in written form and in some detail, with reasons on the merits of the matters in dispute. The opinion is non-binding but provides the parties with what in the opinion of the independent person a formal tribunal may decide whether a court or an arbitrator, if the dispute is not resolved. However, ENE has yet to take off in the construction industry in the UK. This paper will explain this procedure and explore the use of it in the UK and internationally, considering the benefits and drawbacks of its use. It will consider whether or not it is more effective than other early resolution forms such as mediation and adjudication. It will argue and conclude that it is a very useful cost effective procedure, particularly in the resolution of complex disputes, whether local or international.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.