• Title/Summary/Keyword: Construction Material

Search Result 4,989, Processing Time 0.036 seconds

Construction Example on the Interior and Exterior of Building utilizing UHPC for Premix Type Room Temperature Curing (프리믹스형 상온양생용 UHPC를 활용한 건축물 내·외장 시공 사례)

  • Choi, Byung-Keol;Yoon, Ju-Yong;Ko, Hyo-Jin;Park, Yong-Kyu;Yoon, Gi-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.143-144
    • /
    • 2019
  • This study introduces the production and construction of building interior and exterior materials using UHPC for premix type room temperature curing developed through advance research and development.

  • PDF

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

Characteristics of Periodical Changes on Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Korea (우리나라 조경공사 표준품셈의 시대적 변천 특성)

  • Lee, Kwan-Hee;Yun, Ju-Cheul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.131-138
    • /
    • 2009
  • This research was carried out to keep a sharp look-out on changes of estimated unit power and material in landscape architectural construction in Korea from 1962 to 2007 and to suggest basic information for its desirable direction in the near future. The research results are as follows. At first, work classification of estimated unit power and material landscape architectural construction was included under the earth work and in 1974 it had the name which was called landscape architectural process with earth works, and in 1984 the estimated unit power and material of landscape architectural construction was separated from the earth work but it was still under name of estimated unit manpower and material of the engineering construction. In 1972 the estimated unit power and material began with a 'planting' and a 'pruning' and still consists of 7 work classification total: 'sodding and herbaceous sowing', 'digging out', 'planting', 'digging round the root', 'keeping and management', 'rubble masonry' and 'planting for protection of rocks split section'. The processes consist of 29 sub-processes in total. The lawn construction was mainly established in the 1960s, the planting construction in the 1970s, the keeping and management in the 1980s, split section protection in the 1990s along with new technology with keeping management in the 2000s. On the basis of these research results, the process to be added in the near future could be related to new material and new technology and the process might be much more subdivided.

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

Determination of structural behavior of Bosporus suspension bridge considering construction stages and different soil conditions

  • Gunaydin, Murat;Adanur, Suleyman;Altunisik, Ahmet Can;Sevim, Baris;Turker, Emel
    • Steel and Composite Structures
    • /
    • v.17 no.4
    • /
    • pp.405-429
    • /
    • 2014
  • In this paper, it is aimed to determine the structural behavior of suspension bridges considering construction stages and different soil conditions. Bosporus Suspension Bridge connecting the Europe and Asia in Istanbul is selected as an example. Finite element model of the bridge is constituted using SAP2000 program considering existing drawings. Geometric nonlinearities are taken into consideration in the analysis using P-Delta large displacement criterion. The time dependent material strength of steel and concrete and geometric variations is included in the analysis. Time dependent material properties are considered as compressive strength, aging, shrinkage and creep for concrete, and relaxation for steel. To emphases the soil condition effect on the structural behavior of suspension bridges, each of hard, medium and soft soils are considered in the analysis. The structural behavior of the bridge at different construction stages and different soil conditions has been examined. Two different finite element analyses with and without construction stages are carried out and results are compared with each other. At the end of the analyses, variation of the displacement and internal forces such as bending moment, axial forces and shear forces for bridge deck and towers are given in detail. Also, displacement and stresses for bridge foundation are given with detail. It can be seen from the analyses that there are some differences between both analyses (with and without construction stages) and the results obtained from the construction stages are bigger. It can be stated that the analysis without construction stages cannot give the reliable solutions. In addition, soil condition have effect on the structural behavior of the bridge. So, it is thought that construction stage analysis using time dependent material properties, geometric nonlinearity and soil conditions effects should be considered in order to obtain more realistic structural behavior of suspension bridges.

The Comparative Study on the Environmental Impact Assessment of Construction Material through the Application of Carbon Reducing Element - Focused on Global Warming Potential of Concrete Products- (탄소저감요소를 적용한 건설재료의 환경영향평가 비교 연구 - 콘크리트 제품 생산단계에서의 지구온난화 영향을 중심으로-)

  • Cho, Su-Hyun;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.147-154
    • /
    • 2015
  • Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a result, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.

An Efficient Operation Scheme for the Material Procurement System in Construction Firms (대형 건설업체 자재수급관리시스템 효율적 운영방안)

  • Kim Tae-Gyum;Park Jong-Hyouk;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.299-302
    • /
    • 2003
  • Recently the timely delivery and the appropriate management for construction materials are of great significance in that the buildings are getting complicated and more various materials need to be handled. However, these systems have some problems, and do not seem to work effectively yet. The reason is that the lack of operation scheme for systematic management in project. In this study the efficient scheme for the .material procurement system in construction firms to manage the construction materials efficiently was discussed.

  • PDF

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

A Study on the Production of Wood Members and the Estimation of Raw Woods at the Government Managed Building Construction in the Late Chosun Dynasty (조선후기(朝鮮後期) 관영건축공사(官營建築工事)의 목부재(木部材) 생산(生産)과 물양산정(物量算定)에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.10 no.1 s.25
    • /
    • pp.25-40
    • /
    • 2001
  • Since the 17th century, the society of Chosun Dynasty belonged to a period of rapid transition in many fields. As the building is a result produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Therefore an understanding or estimate of a building can be guaranteed by research of a process of building construction. Economic base factors in its process consist of material, cost, manpower, and operation system, etc. to be committed to the construction. On the premise, this paper is to examine the production of wood members and the calculation of the amount of raw woods in a process of woodwork in the construction of the government managed buildings in the late of Chosun dynasty. Construction reports, job slips, written estimates, and other documents in those days are examined for the study. To classify raw woods according to a standard size was aimed to a material management appropriately to apply each them to building size or its member size. The way to select a list of raw woods applicable to each member size, and to calculate the amount of the demanded wood was much more improved with 'Injungjeon-yeongkweon' in the year 1805 at the turning point than 'Hwaseong-seongyuk' in the year 1796. The improvement of material management brought to overcome a shortage of the amount supplied from forest preserve, and to a rationalization of building construction.

  • PDF