CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델 (Commissioning Model for CM Services Considering Project and owner Properties)

  • 강현구;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.632-636
    • /
    • 2007
  • 최근 건설프로젝트는 점차 대형화, 복잡화 되어가고 있으며 그에 따라 관리하여야 할 항목 또한 늘어났으며 발주자 조직 역시 축소되었다. 이에 따라 국내 건설산업에도 다양한 사업관리방식이 도입되었다. 그러나 이와 같은 건설사업관리의 도입은 시행착오로 인한 혼라, 제도의 불합리성으로 인한 관리주체의 역할중복으로 인하여 비용증가 등의 문제를 야기시키고 있다. 그리고 건설프로젝트는 그 특성상 매 프로젝트마다 각자 다른 특성을 가지고 있으며 프로젝트의 발주자 조직 역시 다양한 특성을 지니고 있다. 하지만 건설사업관리에 있어서 이러한 특성을 반영하지 못하고 있으며 획일적인 사업관리 방식만이 적용되어지고 있다. 이러한 문제의 해결을 위하여 본 연구에서는 프로젝트의 특성과 발주자의 특성의 분석을 통하여 해당 프로젝트에 특화될 수 있는 CM업무 위탁모델을 제안하고자 한다. 이를 위하여 프로젝트, 발주자 능력, 발주자 요구사항을 파악, 분석하여 중점관리대상의 선정, CM의 서비스항목, 발주자의 역할정의를 하고자 한다.

  • PDF

Dilemma of Saudi Arabian Construction Industry

  • Albogamy, Abdullah;Scott, Darren;Dawood, Nashwan
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.35-40
    • /
    • 2013
  • Currently, the Kingdom of Saudi Arabia (KSA) is the epicentre of building services engineering encapsulating the construction industry. On rise of technological advancements, engineers have the ease to thoroughly investigate engineering aspects. Not only engineers, but other stakeholders, tender related people, financial analysts work in parallel as well. However, there are some factors that are stumbling blocks in the way of progression including delaying factors in the construction industry. The paper provides deep insights of delaying factors regarding public building projects of the KSA. Collection of primary data was carried out by conducting a survey which comprised of 63 chief delay factors. Professionals related to construction industry were asked for ranking the factors in terms of their frequency of occurrence and degree of impact. Seven groups of risk factors are categorized and a correlation analysis is performed by identifying the correlation amongst the variables. Finally, 31 leading delay factors are extracted and reported.

공동주택 품질관리 플랫폼 개발을 위한 특허동향 분석 (Analysis of Patent Trends for Development of Quality Management Platform in Apartment Houses)

  • 이학주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.231-232
    • /
    • 2023
  • It is important to utilize an efficient quality management platform because the management of deadlines at construction sites requires rapid and accurate processing of numerous defect data in a short time. In this study, 30 domestic patents for defect management and image analysis were analyzed to examine the development status of quality management platforms using mobile devices. As a result of the analysis, research on automatically detecting defects using artificial intelligence has been actively underway in recent years, and advanced IT technologies have been converging in various ways into linked services.

  • PDF

건설사업관리자 선정방식 개선 방안 (Improvement of Construction Manager Selection Method)

  • 박용우;임남기
    • 한국건축시공학회지
    • /
    • 제11권2호
    • /
    • pp.108-115
    • /
    • 2011
  • 본 연구는 건설사업관리 시장의 공정한 경쟁을 위하여 국내 CM 시장현황, 2010년 CM 공시업체현황 및 평가기준 분석을 통하여 CM 선정방식을 고찰하였다. 또한 건설사업관리의 평가기준의 적정성을 고찰하기 위하여 2009년도 CM 상위업체 현황과 2002년부터 2010년까지 120개 CM 용역의 참가자수와 평균 투찰율을 분석하고, 2010년 평가 결과를 공개한 6개 CM용역을 분석하였다. 이러한 고찰결과 현행 CM용역의 평가기준이 용역금액으로 결정되고 기술제안서 평가에 따른 기술력과 가격이 연계되지 못하는 등 CM 산업의 발전과 CM회사의 기술발전을 저해하는 결과들이 도출되었으므로 사업특성과 기술력 요구조건에 따른 CM자 선정방식의 개선을 제시하였다. 따라서 향후에는 사업특성별로 기술력 요구조건을 구분하는 방식과 CM 사후평가를 위한 추가의 연구 노력이 필요할 것으로 판단한다.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

WTO 정부조달협정 건설서비스 양허하한선 인하시의 건설시장 변화와 대응방안 (Market effects analysis of when lowering the threshold value of construction services under WTO GPA)

  • 문혁;김명수
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.72-82
    • /
    • 2009
  • 건설서비스 양허하한선 인하 문제는 국내 중 소 건설업체의 이해관계와 밀접하게 연관되어 있는 바, 국내 관련 제도 및 건설시장에 미치는 영향에 대한 세부적 분석이 필요하다. 특히 중 소 건설업체를 위한 '지역제한입찰제도' 및 '지역의무공동도급제도' 등에 영향을 미치고, 궁극적으로는 이들 업체의 수주시장에도 변화가 예상되므로 이에 대한 사전적 검토가 필수적이다. 그러나 이러한 양허하한선을 낮출 경우 우리나라의 건설산업에 어떤 영향을 미치는지에 대한 연구는 없는 실정이다. 따라서 본 연구에서는 건설서비스 양허하한선 조정으로 인한 실제 수주시장의 변화를 전망해 보고 그 실질적인 효과를 분석하여 '건설서비스 양허하한선 인하' 문제에 대한 기본 입장 정립의 근거 자료를 제시하고자 한다. 현재 WTO GPA의 적용을 받는 우리나라의 양허하한선은 정부발주공사의 경우는 500만 SDR(74억원)이며, 지자체와 기타공사의 경우에는 1,500만 SDR(222억원)이다. 정부는 지방자치단체 및 공기업 등 기타기관의 건설서비스 양허하한선에 대하여 '지역의무공동도급제도' 등을 고려하여 높은 수준을 유지하는 것이다. 우리나라의 지방정부기관 및 공기업의 건설서비스의 양허하한선은 일본과 함께 현재 1,500만 SDR로서, 여타국의 500만 SDR에 비해 월등히 높게 설정된 상황이며 최근 미국을 중심으로 EC 등 주요 회원국은 지방정부기관 및 공기업의 하한선을 외국의 경우와 같이 500만 SDR로 인하할 것을 요구하고 있다. 분석결과 이러한 500만 SDR로의 개방 확대는 '07년 기준으로 총 2조 105억원 규모의 시장이 축소되어, 이는 지역업체들에게 부담을 줄 것으로 예상된다. 지역업체들의 수주 비중은 규모가 작은 공사일수록 높아지므로, 총 2조 105억원 규모의 시장감소(공동도급 1조 6,802억원, 단독도급 3,407억원)는 지역업체 수주활동에 적지 않은 영향을 미칠 것으로 분석된다.

IIA Project PM 적용사례를 통한 CM체계 정착방안 (A Study on Construction Management System for Settlement in Korea through the Case of Program Management of IIA Project)

  • 오명갑
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.96-101
    • /
    • 2001
  • 단일지역 국내 최대규모의 대형복합건설공사인 인천국제공항 건설사업은 환경 및 특성상 태동단계에서부터 사업관리체계 도입의 필요성이 제기되었고 94년 12원 사업관리용역계약이 체결됨과 더불어 본격적인 사업관리체계 구축 및 운영에 착수할 수 있었다. 사업관리용역계약이 체결될 시점에서는 국내의 건설관련법규가 이를 뒷받침하지 않은 상태여서 도입효과에 대한 논란이 많았으며 또한 CM에 대한 인식 및 인프라가 매우 미흡했기 때문에 실제 사업에 적용시켜 운영하는 과정에서는 적지 않은 문제점이 발견되는 등 매우 어려운 여건이었다. 그럼에도 불구하고 사업목표를 성공적으로 달성할 수 있었던 것은 학계와 산업계의 지대한 관심과 더불어 종사자들의 헌신적인 노력이 있었기에 가능했다. 본 고에서는 인천국제공항의 사업관리체계 적용과정에서 나타난 제반 문제점을 분석하여 보다 현실적이고 바람직한 사업관리체계의 정착방안을 제시함으로써 국내에서 CM제도가 보다 다른 시일 내에 올바르게 정착될 수 있는 환경 조성에 일조 하고자 한다.

  • PDF

대구경북과학기술연구원의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구 (A Study on the status and improvement of construction management in Daegu Gyeongbuk Institute of Science & Technology)

  • 김화봉
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.32-38
    • /
    • 2007
  • 최근 건설사업의 대형화, 복잡화, 전문화 추세에 따라 사업목표를 효과적으로 달성하기 위한 전문적이고 체계적인 관리의 필요성과 함께 그동안 진행된 CM의 가시적${\cdot}$긍정적 효과로 인하여 CM용역의 발주가 점차 늘어나고 있는 추세이다. 또한 기존에는 사업 추진 단계에 있어 기획단계를 제외한 CM업무 수행이 이루어 졌으나 점차 기획단계를 포함하여 사업추진 전반에 걸쳐 CM제도를 적용하려는 움직임이 생겨나고 있다. CM의 발전을 위해서는 기획단계부터의 CM 적용, 현실적인 CM 대가산정 기준 정비, 사업참여주체들의 인식전환, CM 자격 인증화를 통한 전문화 유도 등에 대한 제도적 방안이 마련되어야 한다. 그러나, 사업 추진 단계별 CM업무 수행 상 예상치 못한 현실적인 문제점들이 도출되고 있으며 이에 대한 대책이 요구되고 있다. 본 연구에서는 대구경북과학기술연구원의 기획단계 및 입찰단계 CM적용 사례를 요약하여 사업타당성 재조사 및 부지와 관련한 행정업무 지원, 턴키 입찰안내서의 작성, 입찰관련 의사결정 지원업무 수행 등에 대한 실무적용상의 문제점과 이에 대한 각각의 개선방안을 제시하여, CM제도의 성공적 정착 및 발전을 위한 방향을 제시하였다.

  • PDF

모듈러 공법의 특성을 적용한 공동주택의 내역 체계 개발 (Development of Bill of Service Framework for Modular Housing Construction)

  • 황진섭;최상희;이재승;김예상
    • 한국건설관리학회논문집
    • /
    • 제15권5호
    • /
    • pp.138-146
    • /
    • 2014
  • 모듈러 공법은 건설 산업 경쟁력 강화를 위한 하나의 방안으로 주목받고 있다. 최근 핵가족화로 인한 소형주택의 수요 증가, 건식공법으로 변화되는 건설 산업 환경, 친환경 건설에 대한 요구 등에 따라 모듈러 공법 시장은 큰 성장세가 기대되고 있다. 하지만 아직 모듈러 업체들이 표준화되지 않은 내역체계로 공사를 수행하고 있어 공사비에 대한 리스크가 증가될 우려가 있다. 따라서 본 논문에서는 모듈러 공법의 특징과 프로세스가 반영된 내역체계를 개발하고자 하였다. 이를 위해 우선 모듈러 공법, WBS, CBS의 개념 정리 및 일반 RC공사에 쓰이는 표준 내역서를 분석하고 모듈러 공법이 적용된 사례 분석과 전문가 인터뷰를 통해 모듈러 공법 내역체계에 적합한 작성기준들을 선정하였다. 한편 모듈러 공법은 공장생산 비율이 높기 때문에 프로젝트 흐름을 반영하여 모듈러 공장제작, 모듈러 현장시공, 일반 현장시공으로 체계를 크게 구분하였으며 각 내역 항목들 중에서도 모든 현장에 공통으로 적용이 가능한지 아닌지, 규격 변경 또는 내역 삭제가 가능한지 아닌지 등을 표시하였고 마지막으로 숫자로 구성된 코딩을 넣음으로써 모듈러 공법의 특징이 반영된 내역서를 개발하였다. 이는 모듈러 공법 공사비 예측 정확도를 높여 공사비에 대한 리스크를 절감시키고, 더 나아가 모듈러 공법 활성화에 기여할거라 기대된다.