• Title/Summary/Keyword: Construction Management Services

Search Result 491, Processing Time 0.024 seconds

Characteristics of Construction Managers' Roles from the Perspective of Leader's Roles - Focused on Design Stages - (리더 역할 관점에서의 CM단장 역할 특성 분석에 관한 연구 - 설계단계를 중심으로 -)

  • Kim, Dong-Hee;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.125-132
    • /
    • 2011
  • Since early 2000s, the importance of CM services has been increasingly recognized and the CM market is continuously growing. As a consequence, the number of CM companies has increased, which means keener market competition. In order to increase their competitiveness, it has been a major task for CM companies to employ and foster competent construction managers who can play a role of efficient project leaders. The objective of the paper is to analyze key characteristics of construction managers' roles during design stages from the perspective of leader's roles including strategic planner, team builder, gatekeeper, expert, champion.

An Exploratory Study on Adoption and Activation of IT for Korean Stone Industry (한국 석재산업의 IT 도입 및 활성화를 위한 탐색적 연구)

  • An, Jaeyoung;Lee, Choong C.;Yun, Haejung
    • Journal of Information Technology Services
    • /
    • v.17 no.2
    • /
    • pp.83-100
    • /
    • 2018
  • Demand for stone products used as building materials is increasing. The construction industry, the value of the stone industry is sufficient, but the domestic stone industry is very lag regarding IT utilization. However, the overseas stone industry produces high-quality products using IT. In this study, we want to offer an IT application technology priority fit for the stone industries. We identify the current status and production process of the stone industries, then set the priority of various IT, so that obtain competitiveness in the domestic stone industries, and minimize the gap between the overseas stone industries. Therefore, we used AHP method; stone industry production processes were selected as the Enterprise Operation Management, Quarrying, Manufacturing, Construction and Maintenance of first-tier. The second-tier ones are consisted of 30 factors out of IT elements. Focus group interviews were conducted to confirm the validity of each factor. As a result, most important factors of first-tier was selected as the order of Manufacturing, Quarrying, Enterprise Operation Management, and Construction & Maintenance. The top 5 of 30 factors in the second-tier were selected Smart Sensor, Mobile Device, Robot of manufacturing, GIS of quarrying, and SCM of enterprise operation management. And the factor that relatively less important was GPS of construction and maintenance. If properly applied an IT application technology for stone industry, we expect to provide efficient production lines and increase customer satisfaction, which will ultimately expand the promotion for the industry and thus act as positive factor in promoting the stone industry.

Construction Materials Management System Based on Web Database (웹 데이터베이스 기반의 건축자재 관리 시스템)

  • Mun, Ji-Youn;Hwang, Suk-Seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.12 no.1
    • /
    • pp.195-200
    • /
    • 2017
  • Due to the rapid development of Internet technology, qualities of Web services are steadily improving and the Web database systems are actively employed to efficiently manage proper informations in various fields. In this paper, we propose a Web database system for the efficient material management for reusing construction materials. The proposed Web-based management system is operated using the spring framework, after constructing a database based on the collected data including tag ID, Location, Material, State, and Cycle, using the RFID(: Radion Frequency IDentification) system equipped with a location estimation module. Recently, the processing problem for a large amount of the residues generated at the demolition stage of various buildings is magnified in the construction site. The proposed Web-based construction material management system is expected for improving the processing problem as increasing the reusability and for reducing the construction cost as efficiently managing the construction materials for the reuse.

The Construction of Service Chain Management for Optimizing Service Quality in After-Sales Service (사후서비스부문의 서비스품질 최적화를 위한 서비스사슬관리 구축)

  • Lee, Cheol-Gyu;Kim, Min-Jung;Yoo, Wang-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.4
    • /
    • pp.12-20
    • /
    • 2005
  • Supply chain management is a total systems approach to delivering manufactured products to the end customer. Using information technology to coordinate all elements of the supply chain from parts suppliers to retailers achieves a level of integration that is a competitive advantage not available in traditional logistics systems. On the other hand, service chain management is an analogous systems approach that is especially suitable for delivering mobile services such as parcel delivery, cable installation, and home health care. The key elements that distinguish service supply chain management from supply chain management are bidirectional optimization, management of productive capacity, and management of perishability. The purpose of this study is to maintain the construction of service chain management by proving that service quality in after-sales service can be improved through service chain management. First of all, supply chain management, service quality, and service chain management were introduced in theoretical research. In empirical research, it was selected the domestic enterprise that produce electronic appliances with after-sales service, and some customers using the enterprise's after-sales service in the metropolitan area were selected as a sample by convenience sampling method and examined.

A Study on Application of the Building Energy Management System(BEMS) for Korean Small or Medium Buildings (국내 중소규모 건축물의 에너지관리시스템 적용방안에 관한 연구)

  • Byun, Jeong-Yoon;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.159-160
    • /
    • 2011
  • Recently there are many efforts for saving energy in building. therefore Building energy management systems(BEMS) are expected to a reduction energy cost. BEMS has many benefits which could switch plant on and off automatically. Also It optimize plan operation and services, monitor plant status and environmental conditions and to provide energy analysis and management information. In these days, many public buildings are applied BEMS but there are few studies about application of small or medium buildings. Therefore, in this study, we will find how to apply BEMS in small or medium buildings.

  • PDF

Characteristics of Marketing Strategies and Methods in CM Service Commodity (CM서비스 상품 관리 전략 및 방법의 특징에 관한 연구)

  • Song, Yeon-Joo;Park, Ji-Chul;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.487-490
    • /
    • 2007
  • Even though the domestic CM market has expanded in size continually since 2000, concerns of obstacles for vitalizing CM market have risen. A critical concern is clients' low recognition and motivation to make use of CM services. In this situation, it is important for CM firms to actively promote their marketing activities. The objective of this paper is to identify major characteristics of CM firms' marketing strategies and methods in relation to the management of CM service as a commodity.

  • PDF

An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer (초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석)

  • Yang, Jinkook;Kim, Sebeom;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.58-64
    • /
    • 2017
  • Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.

Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges (소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안)

  • Jang, Myung-Houn;Yi, Yong-Kyu
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.3
    • /
    • pp.413-422
    • /
    • 2016
  • A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

Design of Browser for The Harbor BIM Service Based on Cloud Computing (클라우드 컴퓨팅 기반 항만 BIM 서비스를 위한 브라우저 설계)

  • Chang, Jae-Yeol;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.60-71
    • /
    • 2018
  • The port BIM technology has many problems such as lack of relevant system, high cost of BIM infrastructure construction, and process difference of existing domestic inter-industry. Since the port facilities as national key industries are managed and operated by public organizations, it is necessary to integrate IT resources and have a system that needs collective construction and joint utilization management. In this paper, we proposed the convergence of cloud computing technology and BIM as a way to reduce the infrastructure cost required for port BIM operation and to provide various BIM services for domestic process. To do this, we collected system requirements based on demand surveys of port staff and designed a BIM browser that provides IFC-based BIM server and customized services to reduce infrastructure cost in cloud computing environment. In terms of infrastructure, we designed cloud-based IaaS to support cost reduction, which is an essential component, and designed SaaS to support customized services in terms of services. We will perform performance verification with focus on whether port BIM servers and browsers have reached a level where they can manage four BIM models with different types and capacities.

A Study on the Reformation of Aged Person Welfare Facility supported by Government (우리나라 정부지원 노인복지시설의 개선방안에 관한 연구)

  • Cho Young-Jun;Ham Jung-Bok;Yoon In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.197-200
    • /
    • 2005
  • Now, our country is in the face of increasement of aged person, and because of this fact many problems about aged person are show themselves. The main problems can be summarized as services provided by suppliers, inefficient management of welfare facility, violation of human rights, and nonprofessionalism of caring. Therefore to increasement of welfare quality, the direction of aged person welfare facility was suggested in this study.

  • PDF