• 제목/요약/키워드: Construction Management Process

검색결과 2,535건 처리시간 0.029초

철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출 (Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction)

  • 류시욱;안병준;류명욱
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안 (Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study)

  • 김학주;문광배;고성석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF

일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스 (Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability)

  • 윤정숙;유정호;김창덕
    • 한국건설관리학회논문집
    • /
    • 제12권1호
    • /
    • pp.33-42
    • /
    • 2011
  • 자재 및 재고관리에 관한 부분은 전 산업 분야에서 기업의 이익을 위해 고려되는 주요 요소 중 하나이지만 국내 건설 프로젝트에서는 조달 관리의 중요성이 상대적으로 평가절하 되어왔고 기존의 재고관리에 관한 연구는 개별 요소로 한정되어 많이 연구되었으며 제조업의 이론을 도입하는 단계에 머물렀다. 따라서 건설 프로젝트의 자재 및 재고관리를 전체적인 프로세스 관점에서 바라보고 개선하며 기존 이론의 도입에 더하여 건설 프로젝트 특성 반영이 필요하다. 본 연구에서는 계획 단계의 현장 관점에서 야적장의 면적과 재고량을 이용하여 경제적주문량을 결정하는 자재관리 프로세스를 제안하고 이를 건설 현장의 기존 프로세스와 비교하여 그 유용성을 검증하였다.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

건설공사 공종별 사고유형 및 사고객체 교차분석을 통한 중점안전관리항목 도출 (Derivation of Key Safety Management Factors by Construction Process through Cross-Tabulation Analysis between Accident Types and Objects)

  • 유나영;김하림;이찬우;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2022
  • The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

CULTURAL IMPACT ON KNOWLEDGE MANAGEMENT PROCESS AFFECTING PROJECT MANAGEMENT PRACTICE

  • Eric Wai-Leung Chan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.173-183
    • /
    • 2009
  • Knowledge management (KM) is one of the useful management tools in today's project management (PM) practice, such as construction projects. Nobody can deny the importance of "useful knowledge" always helps organizations and project managers shaping a decision. Due to the trend of globalization, it is now very common that an organization may comprise employees from different countries of distinct national-cultures working together. It is also not uncommon that different projects, within an organization, may have their own organizational-cultures which influence its knowledge repository, transfer process and knowledge strategy. Therefore, it is extremely difficult to align all these cultures and consolidate them to benefit the KM process and PM practice. Organizations and project managers understand that different national-cultural and organizational-cultural factors will create impact on the philosophy of KM process which will subsequently affect PM practice. Those factors may affect interpersonal relations and exchange of knowledge between projects and amongst staff. Systematic KM process can utilize the goodness of different employees from distinct cultures which can eventually drive the organization and projects to success. The purpose of this paper, based upon a case study of a Hong Kong construction company, is to discuss how those cultural factors are linked to KM and what organization and project managers can do to improve the KM process and PM practice.

  • PDF

웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발 (Web-based Distributed Lean Construction Information System;Development of System Prototype)

  • 박문서;윤유상
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.182-189
    • /
    • 2007
  • 건설생산성의 혁신적 향상을 지향하는 린건설(Lean Construction) 구현을 위해 가장 시급히 개선되어야 할 사항은 건설생산 프로세스의 개선과 건설정보의 신뢰성 향상으로 정의될 수 있다. 본 연구에서는 건설생산 프로세스 중 설계/시공단계에서의 개선사항을 설계관리, 자재조달관리, 공정관리 측면에서 도출하고, 각 단계에서 도출된 개선사항을 웹기반 정보시스템으로 실현하여 건설산업 종사자들에게 필요한 정보와 지식을 제공하고자 웹 기반 분산형 건설정보 시스템을 개발하고자 한다. 이를 위해 건설생산 프로세스 각 단계에서의 주요 문제점을 파악하여 개선모델 및 요소기술을 제시하고, 모델의 구현을 위한 시스템 프로토타입을 개발하였다. 설계/자재조달/공정 관리지원 시스템은 웹 기반의 지식관리 시스템을 중심으로의 통합을 추진할 예정이다.

  • PDF

RFID/USN기술 기반의 차세대 지능형 건설물류관리 프로세스 레퍼런스 모델 (A Process Reference Model Development for RFID/USN Technologies based Next Generation Intelligent Construction Supply Chain Management)

  • 이우재;신태홍;윤수원;진상윤;권순욱;김예상
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.305-310
    • /
    • 2008
  • 건설프로젝트가 점차 대형화, 고층화 되어감에 따라 프로젝트의 관리방식에 많은 변화가 요구되고 있다. 특히, RFID/USN과 같은 유비쿼터스 기술적용이 활발히 진행되고 있는 건설물류관리 분야를 중심으로 이를 효율화하기 위한 다양한 관점의 방안이 제시되고 있다. 이에 최근 건설현장을 지능화하기 위한 목적으로 개발되고 있는 지능형 장비의 도입은 건설현장에서의 건설물류관리에 새로운 프로세스 모델개발이 요구되고 있다. 따라서 본 연구에서는 바코드 및 RFID/USN 기반의 개별 자재 형태로 제안되고 있는 기존 건설물류프로세스의 한계를 극복하고, 지능형 장비와 같은 건설물류관리의 변화요인들을 반영하여 건설공사에 사용되는 수많은 자재들이 이러한 변화된 프로세스에 쉽게 적용될 수 있는 가이드를 제공하기 위하여 지능형 건설물류관리 프로세스 레퍼런스 모델을 개발하였다.

  • PDF

FEASIBILITY OF A RFID-BASED MONITORING SYSTEM FOR THE CONCRETE POUR PROCESS

  • S. W. Moon;S. M. Hong
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.433-439
    • /
    • 2007
  • A ubiquitous environment in construction requires integrating hardware and software systems. Currently the Construction System Integration Lab (CSIL) at Pusan National University is currently studying the application of ubiquitous technology for better communication in the construction process. In this paper, a pilot of Ubiquitous Concrete Pour System (u-CPS) has been presented to demonstrate the effectiveness of data exchange in the concrete pour process. The u-CPS environment takes advantage of the RFID technology for collecting construction data. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.

  • PDF