• Title/Summary/Keyword: Construction Management Method

Search Result 2,797, Processing Time 0.036 seconds

DATA ACQUISITION METHOD USING A SMARTPHONE ON CONSTRUCTION SITE

  • Ahra Jo;Teahoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.231-234
    • /
    • 2013
  • According to the recent development of USN technology, it has been applied in various fields of construction management. In particular, the concrete curing management using the wireless measurement system is actively being conducted. However, the existing method has limitations such as the reinstallation of temperature sensors and repositioning of repeaters. It is also not easy to acquire the measured data. Thus, this study focuses on the concrete curing management. This study proposes data acquisition method using the smartphone on construction site and tests applicability of the data measuring device and the smartphone. The test allows us to suggest the actual communication distance on construction site and to determine the correction value that is applied to the measured temperature. The data acquisition method proposed in this study is intended to enable appropriate management on construction site and will be able to be applied effectively to a variable construction site. It can also be used in all fields of construction management.

  • PDF

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

Decision Model of Construction Errors Management Based on Modular Method Construction Process (모듈러 공법의 시공 프로세스 기반 시공 오차 관리 의사 결정 모델)

  • Shin, HyunKyu;Kim, SuYoung;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.98-108
    • /
    • 2017
  • Recently, the development of middle and high-rise building technology using modular construction method has emphasized the importance of site construction error management. The modular construction method is very limited to adjust the construction error in the field because of the factory production characteristics. Therefore, in order to prevent the construction error in advance, a management plan reflecting the characteristics of the modular construction method is required, and it is important to make the decision of the construction participant at each stage. This study analyzed the factor of construction error of modular construction and suggested a decision support model for construction error management based on construction process. The result of this study is expected to be a guideline for the modular construction participant to derive the construction error management plan.

A STUDY FOR RFID APPLICATION OF CONSTRUCTION MATERIALS

  • Choong-Han Han ;Ki-Bum Ju
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1155-1160
    • /
    • 2009
  • The trend in construction industry, now, lies in improving efficiency and competitive power in construction management and on-the-spot instruction by combining with new IT technology. Above all, it is safe to say that the application of RFID technology can play a pivotal role at this point, but it is not that easy to apply RFID due to the physical, chemical and environmental peculiarities of construction materials. Thus, a study on the standardization of the usable frequency, specifications, protocol, and package administration is required. This study, as part of the study on the standardization, figured out the restrictions by attaching the existing RFID Tag to the construction materials, turned out the prototype of RFID Tag to perform a field test. In result the effective recognition range varies according to the physical and environmental peculiarities of construction materials; and the management efficiency varies as the attaching method and/or applying method. To analyze the management method (media, process etc.) systematically for the existing construction materials; to prepare more various restrictions and its solutions for practical construction spots will be the key for successful RFID implementation.

  • PDF

AN INTRODUCTION OF NEW SCHEDULING SOFTWARE "BEELINER" BASED ON THE BEELINE DIAGRAMMING METHOD (BDM)

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.391-396
    • /
    • 2013
  • As the construction environment has been changing all the times, the techniques for managing the construction projects have been improved accordingly. The schedule management technique, one of the construction management tools, has been evolved as well in order to be adaptable to new construction environment. Most of newly proposed scheduling techniques have been based on the Critical Path Method (CPM) that was proposed in 1956. The CPM is classified into two categories, Arrow Diagramming Method (ADM) and Precedence Diagramming Method (PDM). ADM is so good in the visual format but it cannot express the overlapping relationships between two consecutive activities. On the other hand, PDM can express the overlapping relationships but it is unsatisfactory in the visual format. Recently, as the construction environment becomes more complex and the role of schedule management becomes more and more important, the overlapping expression becomes one of critical factors for scheduling as well. Most of construction project participants prefer more comfortable visual format, however, the scheduling software based on the PDM cannot satisfy their basic requirement. Beeliner, new scheduling software based on the Beeline Diagramming Method (BDM) that was proposed in 2010, was developed in 2012, it can express more flexible overlapping relationships and has superior visual format as well. This paper presents major features and applications of Beeliner, and makes construction professionals understand new scheduling concept and its applications.

  • PDF

Plan of Construction Management for Reinforcement Method of Slope (사면보강 공사시 관리 방안)

  • 박종호;정희석;이재덕;홍익표
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.44-51
    • /
    • 2002
  • The construction road and addition work are increasing now. Therefore, slope stability is important in construction slope on the fault and fractured zone. Rock bolt method, soil nailing method and anchor method are applied to reinforcement method of slope. This paper is the study for construction management on reinforcement method of slope.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • Lee, Doo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF