According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.
The 6th International Conference on Construction Engineering and Project Management
/
pp.683-684
/
2015
Project Financing (PF) is the long-term financing of infrastructure and industrial projects based upon the projected cash flows of the project rather than the balance sheets of its sponsors. However, the financial institution, the subject of financing in the case of PF in Korea, the lack of validation system of business, rather than to assess the feasibility of the project, requested a credit reinforcement to the construction company, the fact is Construction Company on loans of the employer is the guarantor or debt argument commitments accordingly. As a result, PF contingent liabilities, which are indirect debt, are triggered in the construction company, not included in the financial statements, along with the disclosure standards established according to 2009 PF contingent liabilities, and major can be a management item. In this study, PF contingent liabilities is of Pearson of the index and the PF debt ratio showing the main financial ratios and risk by classifying the credit rating and contractors Ranking of construction companies in order to analyze the impact on the financial condition of the company was performed correlation analyzes, through the Pearson correlation coefficient analysis indicated quantitative or negative relationship to derive the explicit indication.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.249-255
/
2011
Poor safety management in construction management may adversely affect cost, schedule and quality of a project. Heavy fines upon safety offence becomes a burden to the budget; losing working hours as a result of safety incident impacts on the schedule, and compromising quality is always an indirect consequence when workers perform duties in an unsafe site environment. Therefore, promotion of safety management becomes the top priority in any construction manager's agenda. Working safely will benefit construction project and lead to a "real" success. This paper is a case study, based upon "Geller's 10 principles for achieving a total safety culture", reviewing how a Hong Kong leading construction company fosters the safety culture and possesses a pleasant safety record over years. Its safety performance is not only well ahead the local industry, but also ranges top within the Asia Pacific region and comparable to those mature Western industries. The review concluded that safety culture is one of the major components in construction management and collaboration is the essence to realize this positive culture within an organization. Safety management is not merely a "top down" approach, but requires the positive "bottom up" actions from the other end. The successful story of this company can demonstrate the contribution of safety management in construction management.
The differentiators of this study are as follows. I would like to consider the factors that the compensation, considering the characteristics of the members of the ICT construction company, affects the turnover and suggest ways to promote the welfare of ICT construction company members in the fourth industrial revolution. The purpose of this study is to look at how perceived compensation affects the degree of turnover by members of small ICT construction companies through organizational Commitment and job placement. Specifically, the independent variable looks at the causal relationship between organizational civic behavior and organizational trust through Turnover intention. First, in the fourth industrial revolution, the management of the tasks of members of ICT construction companies was found to have a positive impact on their organizational immersion and job alignment. Second, in the fourth industrial revolution, the management of wages by members of ICT construction companies was found to have a positive impact on organizational immersion and job alignment. Third, in the fourth industrial revolution, the promotion management of members of ICT construction companies did not have a positive impact on their organizational immersion and job alignment Fourth, in the fourth industrial revolution, the concentration of members of ICT construction companies' organization is found to have a positive influence on turnover. Fifth, in the fourth industrial revolution, the job alignment of members of ICT construction companies was found to have a positive impact on turnover.
The 8th International Conference on Construction Engineering and Project Management
/
pp.30-37
/
2020
In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.
It has been passed around two decades since the CM is introduced in December 1996. And 20 years have passed. Construction Technology Management Act is the enacted of 1987, since Independence Hall fire in 1986. In the meantime, basic background and operational rather than the development of regulations that skewed had a voice of concern. Accordingly, Ministry of land is promoting a full-scale revision that Construction Technology Promotion law as switching to promote and support the necessity from Regulatory and management-oriented paradigm. In this paper, according to the Construction and Technology Promotion law amended in the course of doing business, was conducting research for drawn counterstrategy through SWOT analysis that was not the side of owner but CM company.
This study is a relatively small scale compared to the massive construction company, construction company's safety management level of the low. A small architectural scene safety management is a necessity for basic research as a whole and of 67.20% died in the disaster, which killed the disaster scene in a small building. Small construction site for a reflections of the prevailing security situation, the existing literature and statistical data to determine what the issue, for the purpose of the proposal and come up with improvement measures.
최근 건설 산업은 경제성장에 따른 사회적 욕구의 다양화와 이로 인한 수요의 증대로 인하여 점차 다양화, 복잡화, 거대화되는 추세이다. 이는 기존의 건설사업의 운영으로는 감당하기 어려운 환경으로 변화하고 있음을 의미한다. 건설 산업에 내재된 불확실성과 위험요인을 체계적으로 관리하고자 하는 움직임이 대형 건설 회사들을 중심으로 나타나기 시작하였고, 특히 일부 대형 건설 회사들은 본격적인 건설사업 리스크 관리기법 도입 및 개발을 적극추진하고 있다. 이에 개별적으로 행해오던 리스크 관리를 넘어서 기업이 직면한 다양한 위험들을 전사적인 시각에서 통합하여 하나의 리스크 포트폴리오로 인식, 관리하는 새로운 리스크 관리 방식인 전사적 리스크 관리(Enterprise Risk Management)시스템이 두각 되기 시작하였다. 이에 본 연구는 전사적 리스크 관리를 건설 분야에 적용시키기 위한 첫 번째 단계료 ERM에 대한 건설 기업의 인식수준과 현 실태를 분석하고 건설 분야에서의 리스크 특성을 고려한 ERM 기본 모형을 제시하고자 한다.
본 논문에서는 블랙-숄츠 옵션가격결정이론을 토대로 개발된 KMV 모형을 활용하여 건설업체 예상부도확률(Expected Default Frequency; EDF)을 측정하여 건설업체 경영상태 변동 특성을 건설업체 규모별로 비교분석하는 것을 목적으로 한다. 이를 위해 본 논문에서는 시공능력평가순위 50위권 내에서 국내에 상장된 건설업체 중 28개 업체를 선정하여 상위 14개 업체, 하위 14개 업체로 구분하여 분석에 활용하였다. KMV 모형을 통해 예상부도확률을 측정하기 위해서는 자산가치와 자산가치변동성, 채무불이행점(Default Point)을 먼저 산출하고 이를 기초로 부도거리(Distance to Default)를 측정하여 최종적으로 예상부도확률을 측정하였다. 또한 본 논문에서는 예상부도확률을 2001년 1분기부터 2010년 4분기까지 분기별로 측정하였다. 분석결과 선험적으로 인지하고 있듯이, 대규모 회사가 중소규모 회사보다 재무적으로 건전함을 확인할 수 있었다. 중소규모 회사의 경우 경영상태 변화 추이가 경기변동과는 매우 둔감하게 나타났다. 즉 상대적으로 규모가 작은 회사는 열악한 재무환경이 지속적으로 유지됨을 확인할 수 있었다. 또한 대규모 회사의 경우 전반적으로 중소규모 회사보다 재무적으로 안정적이었지만 경기에 매우 민감하게 반응하는 것으로 나타났다. 이에 따라 급격한 경기변동이 발생했을 때 중소규모 회사보다 체감적으로 재무상황이 급격히 나빠지는 것을 확인할 수 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.