프리캐스트 스팬 공법을 적용한 고속철도 연속교 시공 (Construction of Continuous Bridges in Hi8h-Speed Railway using Precast Span Method)

  • 김성일;김성호;이원표;윤철수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.401-407
    • /
    • 2001
  • Out of 412km long Kyung-bu high-speed railway, 302km was designed in tile form of either bridges or tunnels. Most of bridges were designed to be prestressed concrete box girder type. The precast span method was selected because of good quality of bridge section secured by factory manufacturing, fast construction speed, low construction cost with mechanized construction and the safety fur field workers. The precast span method has been mainly utilized in bridges consisted of repeated simple spans. However, we applied the precast span method to continuous bridge for high-speed railway Since it was the first attempt to apply ate precast span method to a continuous bridge for high-speed railway, many design and construction details were studied and implemented in the construction. Design and construction processes of a continuous bridge construction using tile precast span mettled are briefly described in this paper.

  • PDF

OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 - (A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method -)

  • 이한수;이치호;한희수;이정욱
    • 한국건설관리학회논문집
    • /
    • 제25권2호
    • /
    • pp.56-68
    • /
    • 2024
  • 최근 공동주택에서의 OSC (Off-Site Construction)기반 PC구조의 객관적인 원가기준 마련을 위해 공장제작-현장설치 단계의 공사비 산정을 위한 품셈 체계를 제안하였다(Lee et al., 2021). 또한, 건설공사 표준품셈에서도 보편적인 PC공사의 현장설치 단계에 적용할 수 있는 주요 부재의 표준품셈을 제시하는 등 PC공사의 공사비를 체계적으로 산출할 수 있는 제도적 기반이 마련되는 추세이다. 본 연구에서는 공동주택 PC구조의 현장조사 결과를 분석하고 전문가 의견을 수렴하여 공동주택 PC공법에 적용할 수 있는 공장제작-현장설치 품셈을 개발하였으며, 현행 표준품셈 기준과 비교하여 공동주택의 현장 및 부재특성에 적용할 수 있도록 표준품셈의 보완 방향을 제시하였다. 또한, 개발 품셈을 활용하여 공사비를 산출하고 동일규모의 공동주택 RC공법과 공사비를 비교함으로써 PC공법의 비용발생 특성 및 원가절감 방안을 도출하였다. 본 연구에서 도출한 PC공법의 표준품셈은 PC공법 공사비 산출결과의 객관성과 일관성을 확보함으로서 PC공법 적용 확산에 기여할 수 있을것으로 기대된다.

한국형 모듈러 주택 시공의 시나리오 개발 (Development of a Korean Modular Housing Construction Scenario)

  • 김균태;김창한;이두헌;이영호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구 (Present Condition and Development of Mechanical Utility System for Modular Construction)

  • 이재수;최준석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출 (Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction)

  • 김민주;이동민;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

프리캐스트 콘크리트 모듈러 단독주택 설계 개발 및 시공 적용에 관한 연구 (A study on design development and construction application of precast concrete modular house)

  • 서동원;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2021
  • In this study, Dr. Bae Kyu-woong of the Korea Institute of Construction Technology developed a concrete module that was lightweighted to 1700kN with KC modules and met housing performance standards. It solves Construction lifts problem that was the limit of the PC module, and is an innovative model that greatly improves Construction period and economics with boxed modules, and is manufactured in the factory by extruded molding in vibration, noise, fireproofing standards, etc., and has the advantage of excellent precision and high strength. Therefore, if the framing house of a precast concretecan only be standardized in construction, its potential for growth will be endless. To do this, standardization, standardization, and modularization of the design are essential.

  • PDF

BUSINESS CREATION BY INDUSTRIALISED BUILDING SYSTEM IN MALAYSIAN CONSTRUCTION INDUSTRY

  • Theong May Chuan
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.407-412
    • /
    • 2011
  • Recently, the Malaysian government had been developing new technologies to the construction industry and one of them is the Industrialised Building System (IBS). The government urged that IBS is 100% utilized in all construction projects. It is believed that the application of IBS helps in reducing construction duration and cost, solving the problems of overflow of foreign workers in the site and improving performance and appearance of a structure. However, there are some parties like the contractor who feel reluctant to utilize this system because there are risks. They worry that their trades will be affected as IBS construct a structure using components which are manufactured in a factory and assemble on site. Therefore, this research is to find out whether IBS benefits the country's economy by focusing on the business created by investing in IBS. A comprehensive supply chain for IBS will be developed to compare with the traditional construction supply chain as to determine businesses or trades created and eliminated. This paper is looking at the theoretical framework about business opportunities due to the Government policy on embarking IBS.

  • PDF

경량전철용 I형강 격자바닥판에 관한 연구 (A study on Grid deck for LRT)

  • 이기승;백진기;구자성;이안호;성택룡
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.328-335
    • /
    • 2000
  • The substructure of Light Rail Transit is mainly built on elevated structure that is composed of pier, girder and bridge deck. The bridge deck mostly has been made by field formed reinforced concrete so far. The objectives of the study are to find a method for design and construction of the new bridge deck. I-beam is fabricated to make grid and concrete is poured on it at factory. This type can be used for maintenance of duty line by advantages such as good quality control and short construction time.

  • PDF

생활소음종합대책:추진방향과 기본목표 (Community Noise: New Guidelines and Policy)

  • 김정태;박영민;전종철;박종석
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2006년도 춘계학술대회논문집
    • /
    • pp.86-88
    • /
    • 2006
  • Community noise has been serious social issues in Korea. The community noise concerns on traffic, construction, factory, and apartment complex noise. In traffic noise, road, railway, airport sectors are included. This paper summerizes the final report prepared for MOE in 2005 by authors. The new policy will be enforced beginning in 2006 with 5 year schedule. Details on the policy will be demonstrated at the presentation.

  • PDF

모듈러공법의 국내 적용 활성화 방안에 대한 연구 (A Study on the Unit Modular System Process Application Plan)

  • 김도민;임재복;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.113-114
    • /
    • 2012
  • The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.

  • PDF