• Title/Summary/Keyword: Construction Factors

Search Result 4,670, Processing Time 0.028 seconds

The Productivity and Importance Factors of Workers in Construction Site (국내 건설근로자의 생산성 관련 중요 요인 도출 및 중요도 조사)

  • Jung, Young-Chul;Moon, Joon-ho;Kim, Jin-Dong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.73-74
    • /
    • 2011
  • Compared to the other industries, construction industry depends many parts of production activities on manpower. And also 3D perception on construction industry and the shortage of motivation in construction workers are the biggest reason to reduce construction productivity. So to solve this problem, the research of factors which affect more to improve the construction workers attitude in construction site will be needed. This research has investigated that the productivity and important factors was divided to economic factors, social factors, psychological factors. The result show that economic factors remain pre-eminent in influencing productivity, but that social factors and psychological factors appear to be of increasing importance in this construction industry.

  • PDF

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

The Critical Factors of Project Management in Sudanese Construction Projects

  • Hakami, Waled Gaber Mohammed;Yousif, Mohamed Ibrahim
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • The Sudanese construction sector is characterized by many small and large projects and high labor intensity, and accounted for 3.2% of the Sudanese country's GDP. The basic problems facing the Sudanese construction projects are the factors that affect on construction project performance. The objectives include identifying the factors affecting the performance of Sudanese construction projects, and to determine the critical factors. The literature review has been done to gather the information about the causes and their factors that affect on the performance of construction projects from the previous researches. The research methodology was conducted to gather the data by questionnaire which was examined to be reliable and valid according to statistical tests. The (34) factors were identified as factors affect on construction projects and the (10) factors were the critical factors which may lead to poor performance of Sudanese construction projects. This study has some conclusions such as the instrument for measuring the critical factors on the performance is reliable and valid, so the project management stage performance is 64.2%.

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

Factors Affecting Quality Management Failure in Construction Projects

  • Lee, Seulki;Yu, Joungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.66-81
    • /
    • 2024
  • Identifying the root causes of substandard construction projects is crucial considering the social and economic issues structural failures can cause. To date, the focus has predominantly been on identifying and penalizing the culprits rather than uncovering the fundamental reasons. Therefore, this study aims to identify various factors that contribute to failures in construction project quality management, including aspects of substandard construction projects, and determine the relationship between these factors and substandard construction projects. Through a literature review and case analysis, 61 influential factors were identified. A survey targeting participants including structural designers, architectural designers, construction companies, CM, and researchers was conducted to gauge the consensus on these factors. A regression analysis was performed based on data from 724 survey respondents. Ultimately, based on the 17 key influencing factors identified by the regression analysis, 9 preventive measures against substandard construction projects were proposed. This study is significant as it elucidates the reasons behind construction project quality management failures that lead to substandard construction projects and establishes a framework for developing practical solutions to real-world problems rather than theoretical or abstract ones.

The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies

  • Adeleke, A.Q.;Bahaudin, A.Y.;Kamaruddeen, A.M.;Bamgbade, J.A.;Salimon, Maruf Gbadebo;Khan, Muhammad Waris Ali;Sorooshian, Shahryar
    • Safety and Health at Work
    • /
    • v.9 no.1
    • /
    • pp.115-124
    • /
    • 2018
  • Background: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. Methods: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. Results: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. Conclusion: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the aforementioned factors have the chance to deliver their projects within the stipulated time, cost, and qualities, which can be used as a yardstick to measure a good project.

What are the Risks of using Smart Technology in the Construction Phase?

  • Lee, Baul;Park, Seung-Kook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.103-110
    • /
    • 2022
  • In the era of the 4th Industrial Revolution, smart technology being considered to improve productivity breakthroughs is in the spotlight as a means to replace traditional construction technology in the construction industry. However, various problems are occurring in construction sites using smart technology and causing negative impacts on construction projects. Therefore, the objective of this study is to identify risk factors that occur when smart technologies are used in construction projects. To achieve this purpose, this study investigated the difficulties at construction projects using smart technology, and risk factors were derived based on site surveys and literature. The risk factors were measured by experts, and then a total of 19 risk factors was derived by exploratory factor analysis. As a result, risks were classified as 5 factors, the institutional factor is the most difficult response, and the government needs anticipative system improvement and a long-term plan. The research findings provide practical implications for construction experts trying to apply smart technology in construction sites and construction policy-makers to revitalize smart technology.

  • PDF

Dilemma of Saudi Arabian Construction Industry

  • Albogamy, Abdullah;Scott, Darren;Dawood, Nashwan
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.35-40
    • /
    • 2013
  • Currently, the Kingdom of Saudi Arabia (KSA) is the epicentre of building services engineering encapsulating the construction industry. On rise of technological advancements, engineers have the ease to thoroughly investigate engineering aspects. Not only engineers, but other stakeholders, tender related people, financial analysts work in parallel as well. However, there are some factors that are stumbling blocks in the way of progression including delaying factors in the construction industry. The paper provides deep insights of delaying factors regarding public building projects of the KSA. Collection of primary data was carried out by conducting a survey which comprised of 63 chief delay factors. Professionals related to construction industry were asked for ranking the factors in terms of their frequency of occurrence and degree of impact. Seven groups of risk factors are categorized and a correlation analysis is performed by identifying the correlation amongst the variables. Finally, 31 leading delay factors are extracted and reported.

The Study on the Analysis of Factors Decreasing Construction Labor-Productivity Using AHP Method (AHP기법을 이용한 건설노동생산성 저하요인 분석에 관한 연구)

  • Pyo Young-Min;Bae Soo-Yong;Ryu Hyoung-Han;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.141-147
    • /
    • 2005
  • Usually, processing whole project or a part of frame work delays due to acceleration, changing orders, management, characters of project. overtime, worker crowding, early occupation in the field of construction. Through a whole project, these factors cause decreasing construction labor-productivity which is the most dependent in business of construction. These kind of decreasing of construction labor-productivity cause many negative effects, just as extension of time, increasing cost in project of construction. Regardless of characters of construction or decreasing labor-productivity, extension of time is a incident which needs acceleration, also it cause a high possibility of claim and dispute. The productivity has just a broad meaning in business of construction. That's why it's difficult to apply in the field of construction. Especially, factors increasing or decreasing labor-productivity is defined by analysis of working as qualitative and outlined evaluation. However, study of the each factor decreasing construction labor-productivity analysis has not researched, because of difficulty of systematic measurement and management. The existed studies about management of productivity are just focused on estimation of productivity, not on evaluation of productivity. It was true that I couldn't examine clearly about the analysis of how much important per each the factor which have influence on labor-productivity because of the characteristic as qualitative that the labor productivity have On this study, i tried to get the factors decreasing of labor- productivity with gathering opinions of panels of expert's studies about the factors decreasing of labor-productivity on project of construction through Delphi method and i evaluated the result factors as quantitatively and subjectively about importance of factors decreasing construction labor-productivity Analysis, using AHP Method by Saaty. Also, using Delphi and AHP method, 1 suggest substantiated method qualitative factors are measured by quantitative criteria.

  • PDF

Conflict Avoidance in Construction Projects: Six 'C' Rescue Factors

  • Acharya Nirmal Kumar;Lee Young-Dai;Kim Sa-Myeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.193-204
    • /
    • 2005
  • Conflict is aroused when different people having different interest work together for fulfilling same the objectives. As the construction field is large, complex, volatile and requires tremendous capital, there are always greater challenges and possibility of risks of conflicts. Poor management practices in construction site and trying to protect risks and threats by contracting parties are the cited sources of the construction conflicts. The best management practice is to resolve the problems before these cultivate as conflicts. This paper has identified six dispute avoidance factors-Convince, Coordination, Consideration, Compromise, Consolation and Coercion. Six 'C' factors described in this paper are the mantra (formula) to execute a conflict free construction project. The conflict avoidance factors have been verified through a successfully executed project called TEVT development project (Technical Education and Vocational Training) during 1993-1998 in Nepal. The results show that the six 'C' factors 'C' considered during the implementation of the project, construction conflicts would be controlled or minimized effectively.