• Title/Summary/Keyword: Construction Equipment Price

Search Result 48, Processing Time 0.035 seconds

Construction cost Prediction Model for Educational Building (학교건축의 공사비 분석 및 예측에 관한 연구)

  • Jeon Yong-Il;Chan Chan-Su;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.290-295
    • /
    • 2004
  • Along with social changes, school buildings are getting complex and diversified unlike the past. However, objective data analysis on construction costs fall short. In particular, ordering agencies are in a great need of objective and practical construction cost management for on-budget construction and procurement of quality goods. This paper analyzes the design diagram for a newly built school with an order from the Daejeon Metropolitan Office of Education, and compares the analysis with those of other kinds of buildings. The results are: the total construction cost of one school unit is 8,017,596,000 won on average; the cost is in the order of building, machinery and equipment, electricity, communications and civil engineering; as to activity, RC construction takes account of $30.3\%$ of the total construction cost. 1'he cost of school construction per M2 is 838,000 won, which is 6th highest of 11 kinds of constructions and slightly lower than 950,000 won, the average price of comparative constructions. When it comes to the percentage, school building takes mote percentage of the total cost than comparative building while machinery and equipment, electricity and communications takes slightly less percentage. Through simple regression analysis of gross coverage, this paper suggests a model formula with which the total construction cost, construction cost in accordance with activity, how much main construction materials are to be used are predictable.

  • PDF

AN ANALYSIS ON THE LABOR/CAPITAL PRODUCTIVITY OF THE CONSTRUCTION INDUSTRY

  • Minsoo Choi;Jinu Kim;Moohan Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.968-973
    • /
    • 2005
  • The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the 1st period(1971-1988) to 0.4465 in the 2nd period(1989-1997), and to 0.1664 in the 3rd period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.

  • PDF

A Study on leasing space to install solar power systems Economic Evaluation (임차공간 설치 태양광 발전시스템 경제성 평가에 관한 연구)

  • Seo, Mi-Ja;Lee, Jae-Hwan;Seo, Tae-Won;Han, Myung-Hee;Woo, Je-Teak
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.12
    • /
    • pp.1373-1380
    • /
    • 2015
  • The rapid spread and various design of solar power plants, development, construction, maintenance technology and business coexist variety and price decline and the recent solar power plants built since the early 2010 despite the decline in the power generation unit main equipment Construction of power plants to stabilize the technology has been continuously promoted. Recently, built in the form of a solar power plant to the construction and leasing the roof and upper structure to replace the limited ground space is increasing. Factory roof, studies such as warehouse and logistics center leased space in the roof installed solar plant status and skills, conducted a study to review and analyze the economy.

An Analysis on the Labor and Capital Productivity of the Construction Industry

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • v.7 no.2
    • /
    • pp.91-96
    • /
    • 2005
  • The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the $1^{st}$ period(1971-1988) to 0.4465 in the $2^{nd}$ period(1989-1997), and to 0.1664 in the $3^{rd}$ period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.

The Application Improvement Plan of Polymer Insulators for Overhead Transmission Lines (가공송전선로 폴리머애자 적용 개선 방안)

  • Min, Byeong-Wook;Kim, Tai-Young;Choi, Jin-Sung;Shin, Seung-Bum;Lee, Si-Young;Won, Gyeong-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.465-466
    • /
    • 2011
  • The global trend is to make transmission lines light weight and compact by using insulators and other equipment made of advanced materials. In Korea, the diversification of insulators supply route has begun in order to obtain price competitiveness. In May 1999, polymer insulators were finally introduced for the first time and installed to the 154kV transmission lines. After that, the construction and procurement standards were made and domestic polymer insulators were developed. And then, foreign and domestic manufacturers were registered in KEPCO as qualified insulator suppliers. As of 2010, purchasing polymer insulators by competitive bidding from foreign and domestic manufacturers has been possible. For this reason, it was decided to reduce the use of porcelain insulators and increase the use of polymer insulators taking the installation price into consideration

  • PDF

전력기술 관리법 소개

  • 박종윤
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.11 no.1
    • /
    • pp.34-36
    • /
    • 1997
  • In this paper, we introduce the design method using CAE(Computer Aided Engineering) which is profitable in the compatibility and standardization of the developed product and the reduction of construction time and price to develop and design a machine equipment. Particularly, we select the standard model to design or develop from the large machinery to the super precision one, extract the peculiar characters of the model by the close analysis of the physical and technical part, can predict the previous result of experimental characteristics on objective dimensions through the analogical mathematical analysis, and can induce the design model demanded by user investigating optimal data in advance. We present the analogical algorithms and process method of design factors and restriction factors in the systematization design with computer. Then we analyze step functions for each systematization equipment and induce the process of technical data with actuator model.

  • PDF

The Research on Development of Road Cost Index Using Each Representative Item of Expenditure (비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구)

  • Chun, Jin Yong;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.105-113
    • /
    • 2006
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust the contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for modulation of construction contract cost due to fluctuation of prices. However the method for making cost index had some problems in calculating cost index of each expenditure item that could not properly reflect the change of construction cost. To supplement these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes the method for making cost index that utilizes representative items of labor, material, equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent studies. By using this method, it is expected to solve the problems which were not reflected in preceeding studies.

A Study on the Multi-Channel Large Capacity Charge/Discharge Formation Module (다채널 대용량 충방전기 모듈 개발에 대한 연구)

  • Lee, Jun Ha
    • Journal of the Semiconductor & Display Technology
    • /
    • v.15 no.2
    • /
    • pp.55-60
    • /
    • 2016
  • This study was developed through the secondary battery module charging/discharger possible utilization in the production process equipment circuit. The developed module is ensuring construction of efficient and productive charging and discharger through this research a limit on the yield and the price of existing single -channel charge and discharger circuit as a 5V 70A grade secondary battery Formation charge and discharger for up to 1 board 4 channels. In order to improve the sensing accuracy, through a robust differential amplifier circuit described using 16bit Analog-Digital Converter and noise was secured 16bit resolution sensing. The configuration also made demands for property Rise / Fall Time. Data Acquisition, discharge efficiency and also to fit the sink circuit temperature level for mass production.

A New Approach to the High Efficiency of Hydraulic Excavator (유압식 굴삭기의 고효율 화에 관한 새로운 접근)

  • Lee, Y.B.
    • Journal of Drive and Control
    • /
    • v.11 no.4
    • /
    • pp.39-45
    • /
    • 2014
  • With recent oil price increases, the fuel efficiency of hydraulic excavators has become a serious issue. Researchers have considered weight lightening by high pressurization in order to improve the efficiency of the excavator and pump controlled actuation (PCA) and to reduce pressure loss of hybrid and valves using mechanical inertia. However, high pressurization is not very effective because the excavator operates at a low speed; a hybrid is inefficient because little accumulated inertial energy is accumulated; and PCA is ineffective because control precision and responsibility are low. In this study, a method to minimize air and gas in hydraulic oil has been presented as a simple and new way to increase hydraulic efficiency.

Precision Localization of Vehicle using AVM Image and RTK GPS for Urban Driving (도심 주행을 위한 AVM 영상과 RTK GPS를 이용한 차량의 정밀 위치 추정)

  • Gwak, Gisung;Kim, DongGyu;Hwang, Sung-Ho
    • Journal of Drive and Control
    • /
    • v.17 no.4
    • /
    • pp.72-79
    • /
    • 2020
  • To ensure the safety of Advanced Driver Assistance Systems (ADAS) or autonomous vehicles, it is important to recognize the vehicle position, and specifically, the increased accuracy of the lateral position of the vehicle is required. In recent years, the quality of GPS signals has improved a lot and the price has decreased significantly, but extreme urban environments such as tunnels still pose a critical challenge. In this study, we proposed stable and precise lane recognition and tracking methods to solve these two issues via fusion of AVM images and vehicle sensor data using an extended Kalman filter. In addition, the vehicle's lateral position recognition and the abnormal state of RTK GPS were determined using this approach. The proposed method was validated via actual vehicle experiments in urban areas reporting multipath and signal disconnections.