• Title/Summary/Keyword: Construction Environment

Search Result 6,414, Processing Time 0.034 seconds

Working Clothes and Working Environment of Workers at a Construction Site in Summer (여름철 건축현장 작업자의 작업복 착의 실태 및 작업 환경에 관한 연구)

  • Choi, Jeong-Wha;Park, Joon-Hee
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.31 no.11
    • /
    • pp.1520-1529
    • /
    • 2007
  • Workers on construction sites are exposed to multiple and varied threats. Of those, climatic factors such as high/low air temperatures and high/low humidity have a bad mental and physical health effect on workers. Especially, work in hot environment has a tendency to cause fatigue, reduce productivity and increase the incidence of accident. So, the purpose of this research was to understand working clothes and working environment of workers at a construction site in summer. The depth interview was performed by 45 workers of 4 different construction sites and the results were as follows. Workers wore average 4 items as clothing(upper, lower) and average 5 items as personal protective equipments(PPEs). They answered "head" is the hottest body area and must be protected during working. This means the necessity of development in safety hat. In addition, it should be developed working clothes and gaiters for alleviating heat stress and safety shoes for diminishing weight. It is expected that this research plays basic and important rolls to develop PPEs for reducing the heat stress of construction workers.

Development of Guidelines for Nonpoint Source Control in Roads (도로 비점오염원 관리를 위한 기초 연구 및 지침 개발)

  • Kim, Lee-Hyung;Lee, Eun-Ju;Lee, So-Young;Ahn, Woo-Young
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.423-428
    • /
    • 2007
  • The 21st century is that both human and environment live together. The advancing knowledge concerning our environment instigates a change in understanding about the physical surroundings. The construction field particularly induces significant improvements that are environmental-friendly. To convene this demand, several manuals and guidelines related to the environmental issues have been enacted and amended. Especially the manuals and guidelines issued from Ministry of Environment (MOC) and Ministry of Construction and Transportation (MOCT) is requiring the addition of environmental knowledge in construction technology. Recently, environmental assessments and advanced environmental measures in various kinds of construction are persuasively been carried out. The policy of Total Maximum Daily Load is the one more reason for the revisions of the manual and guideline, which is really requiring the addition of the environmental knowledge in construction technology. Therefore, this research is focusing on revising the manuals and guidelines related to road construction and maintenance works issued from MOCT.

Stability evaluation of levee to foundation type of drainage construction in Using Geo-centrifuge (원심모형시험기를 활용한 통관기초형식에 대한 제방의 안전성 검토)

  • Im, Eun-Sang;Snin, Dong-Hoon;Kim, Jea-Hong;Cho, Sung-Eun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.856-861
    • /
    • 2010
  • In recent days, the safety of the levee has been an issue because the levee has become bigger according to the Four-river Restoration Project and so on. The greater part of the levee damage has occurred in the interface between soils and the structures. Specially, the drainage construction crosses the levee keeps its settlement down in order to secure a grade of drainage. However, when the settlement isn't generated by using foundation such as pile, the levee is more likely to have leakage at the interface because the construction doesn't behave with soils. In our study, therefor, testing of the behavior of the levee having the drainage construction was carried out to clarify the effects of the foundation type of drainage construction.

  • PDF

Analysis of CFRD(Concrete Faced Rockfill Dam) Constructed by Stages (단계축조에 의해 시공된 CFRD의 거동해석)

  • Cho, Sung-Eun;Shin, Dong-Hoon;Jeon, Je-Sung;Kim, Ki-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.583-588
    • /
    • 2005
  • In this study, a concrete faced rockfill dam constructed by stages was numerically analyzed, and the numerical results were compared with in situ measurements. The simple incremental elastic and isotropic hyperbolic model was employed to characterize the nonlinear deformation behavior of rockfill material and computational procedure followed construction sequence. A series of large triaxial tests for rockfill material were carried out to obtain mechanical input parameters. According to the analysis results, relative great additional deformation was introduced at the surface of stage-I dam body due to the loading by stage-II construction. The results reveal that numerical analysis can effectively simulate the construction processes, and some meaningful insights about the behavior of CFRD during construction were gained.

  • PDF

A STUDY OF INVOICELESS PROCESS USING RFID IN CONSTRUCTION FIELD

  • Tai Sik Lee ;Kyoung Soon Park ;Ja Kyoung Koo ;Young Hyun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1250-1255
    • /
    • 2005
  • Application of radio frequency Identification (RFID) technology in construction industry is not that progressive compared with other industries, because of it's high price experimental research. This research focus on potential application of RFID which eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. This paper suggest an invoiceless system using RFID technology, Process productivity and efficiency for material management is observed through WebCYCLONE and is compared with other processes.

  • PDF

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

A Study on the Influential Factors on Decision Making of Frame Construction Scheduling For Automated Construction (건설자동화를 위한 철골 공사 계획의 의사결정 영향요인에 관한 연구)

  • Choi, Jeong-Phil;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.209-212
    • /
    • 2009
  • During the last few decades, several companies and research laboratories have developed construction robots in an effort to improve productivity, quality, and reduce construction time and safety concerns. Recently, domestic construction industry is also interested in developing the construction robots. However, the studies on the research and development process is impossible in real field. A existing research's object is the development of the research on the assumption that construction's environment is a fixed form, But real construction's environment is very dynamic and atypical. So it is very difficult that we apply construction automation and robots. In order to solve this problem, this study deduce influential factors on decision making of frame construction scheduling for automated construction.

  • PDF

Competitive Advantage Strategy of Construction Duration by SWOT Analysis (SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략)

  • Kim, Sun-Kuk;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.109-117
    • /
    • 2006
  • Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

Variation of Filamentous Periphyton Chlorophyll-a in accordance with Water Velocity and Specific Surface Area of Media in Small Urban Stream (도시 소하천에서 유속, 비표면적에 따른 사상형 부착조류의 Chlorophyll-a 변화)

  • Ahn, Chang Hyuk;Joo, Jin Chul;Lee, Saeromi;Oh, Ju Hyun;Ahn, Hosang;Song, Ho Myeon
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.551-558
    • /
    • 2013
  • The feasibility of water supply as in-stream flow for Mangwall stream was analyzed in terms of water quality and cultivation periphyton using two different types of water resources (e.g., surface water and bank filtration from Han River basin) and three different types of media (e.g., tile, concrete and pebble). The concentrations of organic and inorganic contaminants from the bank filtration were lower than those from surface water by 17.5 - 55.0%. Using water samples collected from Mangwall stream, surface water, and bank filtration, chlorophyll-a, phaeopigment, and growth rate of periphyton were investigated. During 30 day incubation for each water sample, it was observed that filamentous cyanobacteria, Oscillatoriaceae, accounted for 98%, and water velocity of 5 cm/s was optimum for the in situ filamentous cyanobacteria growth. Also, it was deducted for water velocity and chl-a to have an inverse correlation. Meanwhile, the greater the specific surface area of media, the higher the concentration of chl-a. From these results, both water velocity and specific surface area of media should be considered as an combined parameter to deter the growth of filamentous cyanobacteria.