Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Measuring Management Efficiency of Architectural Firms in Korea using DEA/AR Models (DEA-AR 모형을 활용한 건축사사무소의 효율성 비교분석)

  • Kim, Sung-Sik;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.125-126
    • /
    • 2012
  • Domestic architect office from a period of high growth from the 1970s to the '80s has been established as some of the large corporations or publicly traded corporation. 1997 IMF has pointed out there is a lot of need for improvement activities in accordance with the construction recession since the 2008 global financial crisis. In order to address these causes, the company's continuous efficient operation for accurate efficiency and competitiveness analysis was required. Leverage financial ratio indicators Study Using Data Envelopment Analysis Data Envelopment Analysis (DEA) model, how to find a benchmark for the improvement of the efficiency of inefficient enterprises in various sectors being. In this study, a comparison of the conventional DEA model and the DEA-AR model is used to analyze the efficiency and domestic architect office is to improve the management efficiency.

  • PDF

A STUDY FOR RFID APPLICATION OF CONSTRUCTION MATERIALS

  • Choong-Han Han ;Ki-Bum Ju
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1155-1160
    • /
    • 2009
  • The trend in construction industry, now, lies in improving efficiency and competitive power in construction management and on-the-spot instruction by combining with new IT technology. Above all, it is safe to say that the application of RFID technology can play a pivotal role at this point, but it is not that easy to apply RFID due to the physical, chemical and environmental peculiarities of construction materials. Thus, a study on the standardization of the usable frequency, specifications, protocol, and package administration is required. This study, as part of the study on the standardization, figured out the restrictions by attaching the existing RFID Tag to the construction materials, turned out the prototype of RFID Tag to perform a field test. In result the effective recognition range varies according to the physical and environmental peculiarities of construction materials; and the management efficiency varies as the attaching method and/or applying method. To analyze the management method (media, process etc.) systematically for the existing construction materials; to prepare more various restrictions and its solutions for practical construction spots will be the key for successful RFID implementation.

  • PDF

A Study on Energy Efficiency Improvement through Building Insulation Diagnosis (건축물 단열 진단을 통한 에너지 효율 개선에 관한 연구)

  • Cho, Kwangmoon
    • Journal of Internet of Things and Convergence
    • /
    • v.7 no.3
    • /
    • pp.9-14
    • /
    • 2021
  • This paper discovers the energy loss factors through the insulation diagnosis of houses or buildings, and proposes directions for energy efficiency improvement. The energy efficiency factor of a building consists of insulation diagnosis, thermal bridge diagnosis, window diagnosis, airtight diagnosis, and equipment diagnosis. Among the residents and facilities in the energy welfare blind spot, an energy efficiency diagnosis was conducted for one senior citizen building located in Naju-si, Jeollanam-do, and energy efficiency diagnosis was conducted after insulation was installed. Energy measurement, diagnosis and analysis were performed using the IoT-based integrated wired/wireless energy diagnosis platform, Energy Finder. As a result of comparison, an overall energy saving rate of 16.38% was achieved. Annual heating energy consumption per unit area decreased from 333.51kWh before construction to 277.35kWh after construction, and annual cooling energy consumption per unit area decreased from 5.51kWh before construction to 5.22kWh after construction. The annual primary energy consumption per unit area decreased from 464.52kWh before construction to 403.69kWh after construction, and the annual energy cost was reduced from 3,063,307.14 won before construction to 2,641,072.49 won after construction. The additional improvement work is needed on the standards affecting energy efficiency other than insulation.

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

Investigation on Construction Process and Efficiency of Underwater Construction Equipment for Rubble Mound Leveling works (수중 고르기 장비의 건설 공정 및 효율성 분석)

  • Won, Deokhee;Jang, In-Sung;Shin, Changjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.372-378
    • /
    • 2016
  • A mound was constructed to install a caisson and sofa blocks underwater. The mound riprap, which were of uniform grade, size, shape, and specific gravity, formed the foundation for the support superstructure. Also, rubble leveling works were performed before installing structures such as caissons. In this study, underwater construction equipment was developed with a remotely controlled operating system and underwater environment monitoring system for unmanned underwater rubble leveling work. The performance of the developed equipment was verified using on-land and underwater tests. In addition to the performance verification, the construction process and economic efficiency of the equipment should be checked before applying it to the real construction field for commercial purposes. In this paper, a construction process using the developed equipment was proposed and compared with the existing rubble leveling method. The results demonstrated that the new construction method has higher economic efficiency and safety than the existing construction method.

Efficiency Improvement Plan for Output Management at the Design Phase in BIM-Based Projects (국내 BIM 기반 건설 프로젝트에서의 설계단계 성과물 작성 효율화 방안에 관한 연구)

  • Kim, Ki-Nam;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.261-264
    • /
    • 2010
  • As construction projects get bigger and more complex, communication and information flow among participants become key success factors of a project. Accordingly, construction projects to respond to these changes being made in the introduction of BIM (Building Information Modeling). But as 2D drawings are still to be widely used in practical fields, it is very important that 2D drawing information could be easily and clearly projected from 3D BIM data. In this study suggest that efficiency of design phase in BIM-based construction projects for can cause confusion and additional work in traditional to BIM.

  • PDF

A Review on New Non-hybrid Technologies to Improve Energy Efficiency of Construction Machineries (건설기계의 에너지 효율 제고를 위한 비-하이브리드 신기술에 관한 리뷰)

  • Joh, Joong Seon
    • Journal of Drive and Control
    • /
    • v.13 no.3
    • /
    • pp.53-66
    • /
    • 2016
  • New non-hybrid approaches to improve energy efficiency of construction machineries are reviewed in this paper. Hydraulic systems are classified into four classes according to Backe's classification and commercially promising new technologies are carefully chosen in each class. IMV, 3-Line CPR, Closed Circuit Displacement Control of Differential Cylinder, and Throttle-less Secondary Control are chosen as representative non-hybrid new technologies. Key principle of each technology is explained and representative references which run through each technology are selected. Advantages and weaknesses of each technology are discussed and compared from the view point of construction machinery manufacturers.