• 제목/요약/키워드: Construction Efficiency

검색결과 3,489건 처리시간 0.029초

BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구 (Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data)

  • 최창훈;이준복;한충희;소지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF

유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구 (A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing)

  • 박남천;김균태;박수열;채명진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF

교각 기둥시공을 위한 매니퓰레이터 엔드 이펙터 설계 (Design of Manipulator End Effectors for Pier Column Construction)

  • 정태일;이상원;이상윤;유지환
    • 로봇학회논문지
    • /
    • 제16권3호
    • /
    • pp.207-215
    • /
    • 2021
  • There is a risk of serious injury to workers who work at height in pier construction process. By using auto climbing formwork system that does not need to dismantle and reinstall formworks, it is possible to improve work efficiency and safety of workers. However, auto climbing formwork system still requires workers to work on a pier for rebar connection works and so on. In order to eliminate works by workers on the pier, robot manipulators with special end effectors are proposed. Through analysis of works on the pier, three specialized end effectors which are a gripper, a rebar coupler press, and a concrete vibrator, are suggested. Also, new pier construction scenario by the suggested system is confirmed using 3d modeling. It is expected that the proposed system and method enables pier construction without workers on piers. It will increase safety and efficiency of pier construction.

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF

중단열 시스템의 문제점 분석 (Problem Analysis of Sandwich Insulation Wall System)

  • 박준호;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.166-167
    • /
    • 2015
  • Because of energy crisis at all around the world, there is many method and system which for improving energy efficiency has appeared in construction industry. And then, 20% of entire building energy loss is emissed to exterior of buildings, that is important to building's entire energy efficiency. So, many research has been conducted for imporve exterior energy efficiency and generally it called insulation of wall. Method for wall insulation can be classified interior system and exterior system which defined installation place of insulation board whether interior or exterior of structural wall. However, interior system has thermal problem such as thermal-bridge which can be necessarily occur condensation. and exterior system has constructional problem such as difficult to construction because exterior and finish work so expensive construction cost than other insulation method. Thus, sandwich insulation wall system has been appeared for solving these problems. Sandwich insulation system must using wall connecting things because both side walls is divided by center insulation. At this, Through the heat at wall connecter, it can be occured thermal-bridge and broken insulation board when under construction will be bring negative effect by reducing wall thickness and insulation deficit. At this study, we were compared previous sandwich insulation system and analysis these system's problem for develop the improving constructability and performance of sandwich insulation system.

  • PDF

외환위기 이후 국내건설회사의 효율성 분석 (Analyzing the Technical Efficiency of Korean Engineering and Construction Firms after the Financial Crisis)

  • 김건식
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.151-161
    • /
    • 2005
  • 본 연구는 자료포락분석(Data Envelopment Analysis, DEA)을 이용하여 국내 건설회사를 대상으로 효율성을 측정하고 효율성의 연도별 추이를 파악하며 개별기업 및 산업차원에서 비효율성에 영향을 미치는 요인을 분석하였다. CCR모형 및 BCC모형을 적용하여 기술적 효율성 및 순수기술적 효율성을 측정하였고 Window분석을 통하여 연도별 효율성의 변화 추이를 파악하였다. 또한 비효율적인 기업을 대상으로 효율적인 기업이 되기 위한 목표치와 참조집합을 예시하였으며 수익성과 효율성의 시계열자료를 이용하여 효율성 측면에서의 선도기업을 도출하였다. 효율성에 영향을 미치는 요인으로 기업집단의 소속여부에 따른 효율성 차이를 검증하고, 매출액 중 건축비중, 토목비중, 외주비율 등과 효율성과의 상관관계를 식별하였다. 이와 같은 분석은 개별 기업의 효율성에 관한 벤치마킹 및 전략목표설정에 기여하며, 산업경쟁력을 높이기 위한 바람직한 정책 수립에 활용될 수 있다.

차수벽 콘크리트 시공성 향상에 관한 연구 (Improvement of Construction Efficiency of Face Slab Concrete)

  • 김완영;정우성;임정열;원종필
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.289-292
    • /
    • 2003
  • CFRD face slab concrete has a much capability to occur crack due to drying shrinkage and vibrator compaction etc. Because crack of concrete induces structural problem and decrease durability of concrete, it is need to reduce crack of concrete. In the experimental study it was analyzed that the effect of curing of concrete and compaction on CFRD face slab concrete. As a results, it was found that control of construction condition into curing of concrete and compaction improved on construction efficiency of face slab concrete.

  • PDF

5D BIM Tool을 활용한 모듈러시스템의 효율성 연구 (A Study on Modular System Efficiency using 5D BIM Tool)

  • 김민웅;황인호;옥종호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.208-209
    • /
    • 2013
  • Recently, there is a growing interest in BIM and modular method because of changing in users attitudes about quality of building and construction environment. however, In domestic, study on Modular method still have addressed primarily basic contents. This study check efficiency about this process through comparative analysis of Modular method and RC method used 5D BIM tool for real project and suggest a fitting schedule management method for modular method.

  • PDF

건설 기업의 경영효율성과 성장가능성을 고려한 포트폴리오 선택 전략 (A Portfolio Selection Strategy with Consideration of Managerial Efficiency and Growth Potential of Construction Corporations)

  • 유재필;신현준
    • 한국산학기술학회논문지
    • /
    • 제13권2호
    • /
    • pp.878-884
    • /
    • 2012
  • 본 연구에서는 건설 기업을 중심으로 기업의 경영 효율성과 배당성향을 중심으로 한 효율적 포트폴리오를 선택하는 전략을 제시한다. 기업의 경영 효율성을 포트폴리오 선택에 반영하는 방안으로 DEA(Data Envelopment Analysis) 기법을 사용하였고 성장가능성은 기업의 배당 성향을 판단하는 배당 스코어링 테이블을 이용하여 평가하였다. 본 연구에서 제안한 포트폴리오 선택전략의 성능 실험을 위해 KOSPI와 KOSDAQ에 상장된 56개의 건설 산업 관련 기업의 주식을 대상으로 2007~2010년의 4년 동안 매해 3그룹의 포트폴리오를 구성하였고 각각의 포트폴리오 수익률을 벤치마크 수익률과 비교 분석하여 그 성능을 입증하였다.