• 제목/요약/키워드: Construction Data

검색결과 9,882건 처리시간 0.032초

MANAGEMENT OF DIGITAL DESIGN DATA IN BUILDING DESIGN AND CONSTRUCTION UNITS

  • Linas Gabrielaitis ;Romualdas Bausys
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.725-730
    • /
    • 2005
  • The problem of managing digital design data including drawings, specifications and other technical data in building design and construction units is a real challenge, especially when there is a need to structure the design information across building design companies. The main difficulty in this information management is the shortage of unified rules (or standards) on how the digital design data should be gathered, archived, and preserved in the most efficient way for building design and construction units. The most important issue, which addressed in this work, is the standardized reference of all design data definitions.

  • PDF

민간 건축현장 성과측정을 위한 감리보고서 활용성 분석 (Analysis of Supervisory Report for Performance Measurement in the Private Building Construction Sites)

  • 성유경;허윤경;이승우;유위성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.217-218
    • /
    • 2022
  • Supervision work deals with important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, this study attempts to use the data from supervisory reports to measure the performance of private building projects. Performance measurement is important for systematic management. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. First, this study derived 6 performance areas and 15 indicators through a few rounds of expert group discussions. Then, we confirmed the performance indicators with high feasibility of data collection through a survey of supervision experts. It is expected that the data of supervisory reports can measure systematically performance and assist in speedy diagnosis of private building construction sites.

  • PDF

건설 현장의 초정밀 디지털 맵 생성 및 연계를 위한 정보체계 프로토타입 설계 (Design of an Information System Prototype for Generating and Linking Ultra-precision Digital Maps of Construction Sites)

  • 김종협;염동준;고현아;강태경
    • 한국산업융합학회 논문집
    • /
    • 제23권6_2호
    • /
    • pp.1015-1024
    • /
    • 2020
  • By nature, smart construction technology is a convergence technology, therefore aptly constructing and running an information system is needed in order to effectively develop and maintain it. Thus, in this study, an information system prototype was developed for the creation and linking of high precision digital maps at road construction sites for the effective performance of the development of the Information Collecting and Analyzing Techniques in the Construction Site (ICAT). For this, (1) defined input/output (I/O) data of each technical detail of ICAT, (2) analyzed the data flow, (3 ) proposed an information system prototype for high precision digital maps development and connection. Based on the information system prototype constructed in this study, it was inferred that each technique and its information for the Smart Construction Technique Development Business was in a consistent flow. Developed information system prototype would enable effective cooperation between subjects directly involved in the technique development, by defining I/O data in advance. Moreover, it would be of value to practitioners for refining the output data from each technique, thereby linking databases and forming Entity Relationship Diagram.

사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템 (BIM based Construction Progress Monitoring System Integrated with IOT)

  • 손상혁;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

Predicting the CO2 Emission of Concrete Using Statistical Analysis

  • Hong, Tae-Hoon;Ji, Chang-Yoon;Jang, Min-Ho;Park, Hyo-Seon
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.53-60
    • /
    • 2012
  • Accurate assessment of $CO_2$ emission from buildings requires gathering $CO_2$ emission data of various construction materials. Unfortunately, the amount of available data is limited in most countries. This study was conducted to present the $CO_2$ emission data of concrete, which is the most important construction material in Korea, by conducting a statistical analysis of the concrete mix proportion. Finally, regression models that can be used to estimate the $CO_2$ emission of concrete in all strengths were developed, and the validity of these models was evaluated using 24 and 35MPa concrete data. The validation test showed that the error ratio of the estimated value did not exceed a maximum of 5.33%. This signifies that the models can be used in acquiring the $CO_2$ emission data of concrete in all strengths. The proposed equations can be used in assessing the environmental impact of various construction structural designs by presenting the $CO_2$ emission data of all concrete types.

대·소규모 토목공사의 실적공사비 비교 분석 (Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works)

  • 홍성호;신주열;김창학;이동욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • 실적공사비 제도는 2004년부터 도입된 제도로서, 과거의 유사 공사의 계약단가를 토대로 공종별 단가를 파악하여 예정가격을 결정하는 방식이다. 이러한 실적공사비 단가는 매년 2회 한국건설기술연구원에서 발표하고 있다. 소규모 공사의 공사비 단가는 작업단위당 생산비용 증가, 장비 및 노무비 등 상승으로 인해 대규모 공사보다 높을 수밖에 없는 것이 건설공사의 특성이다. 그러나 실적공사비 단가가 공사의 규모와 무관하게 일률적으로 적용되고 있어 문제점으로 대두되고 있다. 본 연구에서는 이러한 실적공사비 제도의 문제점을 파악하기 위해서 대 소규모 토목공사의 실적공사비를 비교 분석하였으며, 소규모 토목공사의 실적공사비가 대규모 토목공사에 비해 21.8% 높은 결과가 도출되었다.

실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로- (A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction -)

  • 박원규;김두하;안동만
    • 한국조경학회지
    • /
    • 제25권1호
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

Interrelationship Analysis between Causal Factors of Construction Defect Using Association Rule Mining

  • Lee, Sang-Deok;Han, Sang-Won;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.627-628
    • /
    • 2015
  • Construction defect which can causes economic damage such as schedule delay, cost overrun is a considerably important factor in construction industry. In general, a construction defect features a difficulty to find out causes precisely because it occurs when several interrelated causes combine. Yet, studies have tried to understand the interrelationships between factors are limited. In addition, despite of a tremendous amount of construction data, it's not still enough to analyze them, but tends to depend on experience or know-how of practitioners. Thus, it is necessary to identify underlying causes in influential factors by utilizing related data. This paper analyses Interrelationships between causal factors using Association Rule Mining to discover root causes of construction defects. Confidence and Lift that can be used for presenting the interrelationships of the causes were extracted from 1241 cases in 30 projects in Korea. It is expected that this paper allows the construction managers to discover key factors and make right decisions to reduce occurrence of construction defects. Furthermore, analysis of interrelationships can improve understanding of structural patterns of construction defects.

  • PDF

초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화 (Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations)

  • 이태희;고용호;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

건설업 보건관리자 선임 관련 비용편익분석 (Analysis of Cost Benefit Related to Appointing a Health Care Manager in the Construction Industry)

  • 정혜선;이지선;신인재;최은희
    • 한국직업건강간호학회지
    • /
    • 제25권2호
    • /
    • pp.130-140
    • /
    • 2016
  • Purpose: The construction worker has diverse harmful factors such as noise, dust, and dealing with chemicals. Therefore this research aimed to examine the necessity of appointing a health manager in the construction industry by examining the cost-benefit analysis when the construction industry appoints a health manager. Methods: In order to calculate the healthcare staff employment cost and the benefits from their activities in 1,425 construction companies with the staff of 300 or more people during 2011, this study analyzed existing data and existing research data, as well as national data. Results: Total annual costs were 99,920,070,900 won and total annual benefits were 324,807,182,625 won. Benefits were found to be 224,887,111,725 won exceeding costs. Benefit/cost ratio resulting from appointing a health manager in the construction industry workplaces was 3.25 times. Conclusion: The findings of this research can be used as the base data to make rational decision to positively encourage the employment of healthcare staff in construction companies pursuant to relevant laws.