• Title/Summary/Keyword: Construction Criteria

Search Result 1,690, Processing Time 0.028 seconds

An Application of the Analytical Hierarchy Process (AHP) for Safety measurement in Malaysian Construction Industry

  • Samad Doostdar;Zubaidah Ismail
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.66-73
    • /
    • 2013
  • Analytical Hierarchy Process (AHP) is a famous method amongst Multi Criteria Decision Making (MCDM), set up by Saaty in 1980. AHP can be determined as a methodology of hierarchical analysis following reasonable decision making with make simpler a difficult crisis. Decision making in systems of Safety management concerned multipart challenges. AHP is process for get better the composite decisions understanding with analyzes of the problem in a structure of hierarchy. The integration all of applicable decision criteria, their pair wise judgment permits the decision maker to establish the trade-offs amongst objectives. In recent years, Malaysian's economy and infrastructure development have significantly and rapidly risen. The construction industry continues to play a major role in this development as many construction activities have been carried out to meet the high demands of the expansive market. However, the construction industry has faced a wide range of challenges, one of which is the frequent occurrences of accidents at the workplace. An effective safety program can substantially reduce accidents because it can help management to build up safer means of operations and create safe working environments for the workers. Furthermore, by having an effective safety programs, good safety culture can be embedded in organization because it can encourage mutual cooperation between management and workers in the operations of the programs and decisions that affect their safety and health. The focus of this research is development methodology of Analytics Hierarchy Process (AHP) in construction safety factors and investigates the levels of some effective elements in SMS in Malaysian construction industries.

  • PDF

Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)

  • El-Sawalhi, Nabil;Hajar, Yousef Abu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.1-7
    • /
    • 2016
  • The purpose of this paper is to develop a model for selecting the best contractor in the Gaza Strip using the Artificial Neural Network (ANN). The contractor's selection methods and criteria were identified using a field survey. Fifty four engineers were asked to fill a questionnaire that covers factors related to the selection criteria of contractors practiced in Gaza Strip. The results shows that the dominant part of respondents (91%) confirmed that the current awarding method "the lowest bid price" is considered one of the major problems of the construction sector, "award the bid to the highest weight after combination of the technical and financial scores" represented 50% of the respondents. The criteria weights were determined based on Relative Importance Index (RII. Ninety-one tenders(13 projects) were used to train and test the ANN model after re-evaluating the contractors depend on the weights of factors to select the best contractor who achieves the highest score. Neurosolution software was used to train the models. The results of the trained models indicated that neural network reasonably succeeded in selection the best contractor with 95.96% accuracy. The performed sensitivity analysis showed that the profitability and capital of company are the most influential parameters in selection contractors. This model gives chance to the owner to be more accurate in selecting the most appropriate contractor.

How to develop corporate real estate? A decision support tool for CREM

  • Dorr, Anne;Pfnur, Andreas
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.19-33
    • /
    • 2017
  • Various forms of procurement are open to companies when constructing new owner-occupied properties. The selection of a form of procurement is an important decision-making problem for companies and their Corporate Real Estate Management (CREM) departments. With this in mind, a decision support tool has been developed to optimise the outcome and success of company's proposed real estate development projects and is presented in this paper. This model can also be used for current real estate portfolios to optimise returns in the long term. In pursuit of this objective and in order to provide an academic basis for this study, decision-relevant goals and parameters were initially identified from the referenced literature used in our research. These were subsequently evaluated in a case study of a corporate development project and identified as specific decision criteria from the perspective of the CREM. The investigation identified 15 criteria that are relevant to the corporate decision-making process in procuring and/or developing property. A model for supporting and resolving decision-making problems of this type was derived from decision theory. In this paper, a decision-making tool is presented that takes into account all the decision criteria from the CREM point of view for the first time. This model should therefore serve as an aid in implementing the decision-making process for the development of real estate projects in a more structured and transparent manner.

Determination of Forest Road Construction Priority Order Using Multiple Criteria Decision Making Methods (다기준의사결정법(多基準意思決定法)에 의한 임도개설순위(林道開設順位)의 결정(決定))

  • Cha, Du Song;Cho, Koo Hyun;Kim, Jong Yoon
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.149-157
    • /
    • 1996
  • The applications of multiple criteria decision making(MCDM) methods were investigated to determine the priority order in forest road construction for timber harvesting and silvicultrual activities in 22 regions. In this paper, MCDM methods have five methods from two kinds of models. The one is non-compensatory preference model including maximin and maximax method; the other is compensatory preference model including simple additive weighting method(SAW), hierarchical additive weighting method(HAW) and technique for order preference by similarity to ideal solution(TOPSIS), SAW and TOPSIS methods turned out to be the most adequate for forest road construction priority order among the five methods tested in this study.

  • PDF

DECISION SUPPORT SYSTEM FOR SUBURBAN STATION REHABILITATION

  • TaeHoon Hong;Sangyoub Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.855-861
    • /
    • 2005
  • Every public agency governing infrastructure has to plan effectively for rehabilitation of existing facilities within the constraints of the capital program. Numerous technical, social, political, financial, and management constraints govern the decision to rehabilitate a facility. However, without a systematic procedure for selecting facilities for rehabilitation, within the prevailing constraints, it is possible that the funds available for rehabilitation might be suboptimized. Therefore, a decision support system that assists the user in selecting facilities for rehabilitation while considering the technical, social, financial, and political and management constraints will be useful in the decision-making process. This paper compares the Analytical Hierarchy Process (AHP) with the Swing Weight method used to prioritize functional criteria for suburban station rehabilitation. This paper also contains a brief discussion about the relevance of the Multi Attribute utility theory in developing a decision model for the problem at hand. The results of this paper provides the user with a decision support system that would prioritize the stations in order of their weights obtained by a systematic evaluation of various criteria and sub-criteria involved in the decision making process

  • PDF

A study on the construction of records management criteria (기록관리기준 조사 및 작성에 관한 연구)

  • Lee, Mi-young
    • The Korean Journal of Archival Studies
    • /
    • no.15
    • /
    • pp.185-218
    • /
    • 2007
  • With the reform of records management law, the organization should manage a new criteria scheme of record management based on business task and process. The new criteria scheme includes business explanation, preservation period, cause of setting up preservation period and opening information, access authority, keeping records or not. In the past, there were also some regulations and criteria but, records management criteria should be managed systematically and rationally than past in electronic environment. In this study, some previous cases about records management criteria constructing and operating were introduced first. And various characters about records management criteria were reviewed after that, process sample and methodology were proposed for construction of each criteria. If the records management criteria were constructed properly according to goals and objectives of records management and the results were managed through electronic system, the consistency of records management will be kept well and value changes of business and records will be reflected dynamically.

Character Segmentation in Chinese Handwritten Text Based on Gap and Character Construction Estimation

  • Zhang, Cheng Dong;Lee, Guee-Sang
    • International Journal of Contents
    • /
    • v.8 no.1
    • /
    • pp.39-46
    • /
    • 2012
  • Character segmentation is a preprocessing step in many offline handwriting recognition systems. In this paper, Chinese characters are categorized into seven different structures. In each structure, the character size with the range of variations is estimated considering typical handwritten samples. The component removal and merge criteria are presented to remove punctuation symbols or to merge small components which are part of a character. Finally, the criteria for segmenting the adjacent characters concerning each other or overlapped are proposed.

Specificity of Prefounded Column for Top-Down Construction (Top-Down 공사용 선기초기둥의 특성)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Park, Dae Young;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.