• Title/Summary/Keyword: Construction Criteria

Search Result 1,703, Processing Time 0.026 seconds

TOPSIS-Based Decision-Making Model for Demolition Method Selection

  • Lee, Hyung Yong;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • v.23 no.4
    • /
    • pp.67-73
    • /
    • 2021
  • An efficient demolition process requires the optimum method selection considering stability, economic feasibility, environment, and workability. In reality the construction cost and period are priority concerns, and safe construction methods are neglected. In addition, the choosing demolition method is often determined subjectively by experienced field engineers. This research paper presents a multi-criteria decision-making method using Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) to select the optimum demolition method. Three experienced demolition engineers' opinions were used to develop the TOPSIS model. The case study showed that the preferences of ten attribute measurements for demolition method selection. Authors suggested the most preferable demolition method for the case study project.

A Study on the Proper Rate of the Safety Management Cost under the Construction Technology Promotion Act by Direct Calculation (건설기술진흥법 상 안전관리비에 대한 적산 및 품셈을 통한 적정 요율 산정에 관한 연구)

  • Chae, Yong Sup;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.68-75
    • /
    • 2018
  • The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

An Establishment of the Situational Application Criteria on the Risk Management Technique in the Construction Project (건설공사 위험관리 기법의 상황별 적용기준 정립)

  • Kwon Soon-O;Yoon Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.228-231
    • /
    • 2004
  • Recently, a risk management in the construction project is getting more important. But the field application cases of risk management and its performance level that have been worked in the construction field are so rare and poor, because an application criteria on the risk management technique is not established systematically. So in order to apply of risk management in the field more successfully, it is necessary to optimize the technique of situational application on the risk management. The purpose of this study proposes the optimized application criteria in the field risk management based on the three categories such as historical data, experts, and analysis time.

  • PDF

A Study on the Derivation of the User-Oriented Agricultural Drought Assessment Criteria Using the AHP technique (AHP기법을 이용한 수요자 중심의 농업가뭄 영향 평가 기준 도출 연구)

  • Lee, Suk-Ju;Song, Jae-Do;Jang, Tae-Il;Sul, Dong-Moon;Son, Jae-Kwon
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.47-55
    • /
    • 2018
  • Currently in the drought evaluation, which is a supplier-oriented standard that applies storage rates of reservoirs, evaluation for users that use agricultural water is not done. Therefore, this study established drought evaluation items for drought evaluation based on farmers' judgement, conducted a survey on farmers and experts, compared and analyzed weighted value between two groups, and then classified the evaluation standards per each evaluation item. The agricultural drought evaluation items are 5 major items of water supply lapse rate, agricultural weather, agricultural irrigation facility, crop and soil, and 12 subsections for regional characteristics and opinions of consumers that use water to be reflected. The result of analyzing weighted value of farmers and experts' major items shows that farmers is agricultural irrigation facility(0.219), water supply lapse rate(0.211), agricultural weather(0.204), crop(0.183) and soil(0.183). Experts is agricultural weather(0.297), agricultural irrigation facility(0.202), water supply lapse rate(0.189), crop(0.162) and soil(0.150), which displays difference between the two groups. The agricultural drought criteria standards are established based on precedent studies and cases, and grades of evaluation items are 1st grade(extreme stage), 2nd grade(warning stage), 3rd grade(alert stage) and 4th grade(attention stage). The above analysis per each consumer-oriented agricultural drought evaluation item and the analysis on the standards of evaluation grades are expected to be used as a basic resource for establishing agriculture drought policy and selecting drought area in the future.

A Study on the Quality and Logic Construction's Validity Improvement of Community Plan - Focused on the Case of Gyeongju-si Community Plan - (지역사회복지계획 논리구성의 타당성과 질 강화 -경주시 지역사회복지계획 사례중심-)

  • Kang, Dae-Sun
    • Korean Journal of Social Welfare
    • /
    • v.64 no.3
    • /
    • pp.155-181
    • /
    • 2012
  • The paper aims to improve the quality and validity of community plan using the content analysis on gyeongju-si. To achieve it, the relevant literatures reviewed, and established the basic framework and three criteria of community plan, then adapted these criteria to the gyeongju-si community plan. Findings are like: Firstly, the measurement criteria of validity are clarified into three; vertical consistency on the whole plan's hierarchical structure, horizontal relevancy between the section plans, clearness of statement. Secondly, generally, gyeongju si plan didn't satisfy the criteria of validity. Based on these results, it specifically offers a impoverishment strategy including the guidelines' upgrading.

  • PDF

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

An Improved Scheme of Evaluation Process in the Advanced Construction Technology Endorsement System (건설신기술 지정제도의 평가프로세스 개선방안)

  • Tae Yong-Ho;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.363-366
    • /
    • 2002
  • The advanced construction technology endorsement system(ACTES) has used the improper evaluation criteria. Because of its insufficiency of quantitative evaluation, it is difficult to attain the objective and fairness. This study used a survey to investigate a actual condition of ACTES. The survey found that ACTES needed a evaluation criteria and a quantitative evaluation method. In addition, This study proposes the evaluation model that uses a discriminant function. The model process consists of several phases that are brain storming, t-test and discriminant function analysis.

  • PDF

A Basic Study on the Development of the BIM Service Level Assessment Process (BIM 서비스 수준 평가 프로세스 개발을 위한 기초연구)

  • An, Ji-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.87-93
    • /
    • 2019
  • In recent years, BIM services have been used in many construction projects. However, they are raising the question that there are many differences between what was initially proposed and what was actually done. In the IT sector, a method called as SLA is used to perform an assessment of the services delivered to the IT service project. In this respect, this study intends to introduce this method into building construction projects to use BIM in order to propose evaluation criteria and the evaluation process for SLA-based BIM service. The BIM service assessment process and criteria presented are judged to help introduce consistent and systematic BIM services in construction projects.

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF