Study on construction method of horizontal ground heat pump system using the building structure (건물구조체를 이용한 수평형 지열시스템의 시공법에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.139-140
    • /
    • 2013
  • Ground source heat pump systems can achieve the energy saving of building and reduce CO2 emission by utilizing stable ground temperature. However, they have many barriers such as high cost of installation, incompletion of design tool, lack of recognition as heating and cooling systems. In order to solve the problems, the building integrated geothermal system (BIGS) developed by several researches which use building foundation as a heat exchanger. In order to establish the optimum design tool of BIGS with the horizontal heat exchanger, the prediction method of ground heat exchange rate developed with numerical simulation model. In this study, the economic analysis for BIGS was conducted based on simulation results and the optimal design method was suggested. As a result, it was found that the case of 32 A, piping space 0.3 m, piping deep 0.5 m and flow rate 9.52 L/min was the best case as 50.1 W/m2 of heat exchange rate. In this case the initial cost was reduced to 115 million won.

  • PDF

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

A Case Study of the Construction of Smart Factory in a Small Quantity Batch Production System: Focused on IDIS Company (다품종 소량 생산 체제의 스마트 공장 구축 사례: (주) IDIS를 중심으로)

  • Oh, sea-nam;Park, won-chul;Riew, Moon Charn;Lee, Min Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.1
    • /
    • pp.11-26
    • /
    • 2018
  • Purpose: This study is to help the construction of smart factories of other manufacturing enterprises through IDIS 's case of smart factory construction. Methods: We introduce the four phases of implementing smart factory building by IDIS company, which produces a small quantity of multi-odd units. Results: Through the smart factory construction, the cost of product is reduced due to the improvement of total productivity such as office work, production work, and energy saving, and sales are enhanced by customized production, quality / delivery reliability improvement. Conclusion: We present the actual examples needed to build the manufacturer's smart factory.

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

A Construction of Web-based Decision Making Support System for Artificial Ground Greening (인공지반녹화의 웹 지원 의사결정지원시스템 구축)

  • Lee, Dong-Kun;Park, Chan;Kim, Jae-Uk;Yoon, So-Won;Jang, Seong-Wan;Shin, Sang-Hee
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.1
    • /
    • pp.62-71
    • /
    • 2008
  • Recently, the expansion of housing developments has reduced green areas in cities. The reduction of green areas caused many negative effects on human beings. For functional improvement of ecosystem, government focuses on artificial ground greening because it gives improving microclimate and saving energy consumption. This research aims to develop the system to support decision making of greening for artificial ground greening. This system consist of rooftop greening, wall greening, and street greening system which can suggest proper type of greening and calculate the effect of the greening considering the proponents inputs. It presents social, economic, and ecological value such as cost, energy saving, and temperature reduction. As it is web-based system users can easily access with internet. This system provides automatic selection modes.As a result, with this developed web-based system, decision makers can evaluate the effect of artificial ground green easily and the support to such movement will increase.

Broadcasting Fire protection Digital total system for decreasing economic construction Cost-saving integrated system for disaster broadcasting (공사비 절감을 위한 디지털 통합 방재방송시스템)

  • Baek, Dong-Hyun;Kang, Won-Shun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2111_2112
    • /
    • 2009
  • 본 연구는 화재감시용 R형 중계기와 수신기에 일반방송 및 비상방송기능을 추가하여 이를 통합적으로 운영할 수 있도록 한 것이다. 이를 위해 소방용 중계기에 구역별로 스피커를 제어할 수 있는 기능을 부가하고, 화재수신기에는 디지털방식의 초소형으로 제작된 방송앰프를 내장하여 제작하였다. 제작된 시스템은 기존의 방식과 비교하여 장비의 설치공간을 감소시킴과 동시에 간선공사비용을 최소화하여 경제적인 시공이 가능한 것을 확인하였다.

  • PDF

Effective UML models by using database system

  • Halim, Faisal;Muttaqin, Rizal
    • Korean Journal of Artificial Intelligence
    • /
    • v.1 no.1
    • /
    • pp.1-3
    • /
    • 2013
  • This study suggested ways to control UML diagram and to make design of database and to retrieve diagram information by giving questions. The study classified elements of the diagram. For instance, class diagram was made of classes, and class was done of class name and attribute operator. The elements were transformed to be database table having basic key and foreign key information. The ways suggested had advantages of users' sharing of model information and reuse of the model. This study investigated cost saving, time saving and UML model construction by database. We had designed integrated and relation database that could save and manage UML diagram, and suggested retrieval. For instance, we classified class diagram into elements to make tables and kept relation of each element by using not only basic key of relation database but also foreign key information. We made database of modeling depending upon methods to give users convenience.

Development Status of the Regeneration Inverter System for Energy Saving in DC Electric Railway (전철시스템의 에너지절약 회생인버터시스템 개발 현황)

  • Kim, Yong-Ki;Han, Moon-Seob;Yang, Young-Chul;Jang, Su-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1473-1478
    • /
    • 2007
  • In the respect of energy saving and reusing, it is necessary to reduce greenhouse gases emission and to enhance the operation efficiency in electric railway system. Recently, as the power electronics technologies are advanced, some countries have focused on the regenerative inverter to use regeneration energy on each line. When the electric tractions are stopped or slowed down, it is useful to supply the surplus energy to the power source by regenerative system, which increases its energy efficiency. Also, the generated energy can be supply to other tractions or equipments inside traction. Thus, it may help reduce construction cost of additional power plants. The purpose of this study is to describe the development status of the regenerative inverter system which suppress extra DC-line voltage and regenerate the energy instead of using a resister.

  • PDF

Economic Analysis of Inverter DSM Program for Inverter (인버터 DSM 프로그램의 경제성평가)

  • Lee, Hak-Ju;Kwon, Seong-Chul;Choi, Byoung-Yun;Lee, Seung-Yun
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.521-523
    • /
    • 2001
  • The electric demand increase, financial need for new power plant constructions and environmental problem have led to search for more efficient energy production and energy conservation technology. To minimize the construction of power plants and reduce total power consumption include installation of inverters to motors used for pumps and fans. However, the high price of Inverters is the biggest obstacle to their wide use. Accordingly, to maximize the effect of energy saving by the expanded use of inverters, governmental economic support as well as the analysis of energy saving effect. This paper presents the cost-effectiveness analysis for DSM program evaluation and case study to analyze inverter DSM program.

  • PDF