THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

RFID Technology Applications with PMIS for Managing RMC Truck Operations

  • Kim, Seung-Ho;Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.468-481
    • /
    • 2011
  • This research presents a strategy and information system to manage the logistics of delivery ready mixed concrete (RMC) under the integrated environment of PMIS+RFID. PMIS is system tool and technique used in construction sectors to delivery information. Information that can be extracted electronically in real time is more valuable than data gathered and maintained manually. RFID technology can help to improve data accuracy through supply chains and by identifying products and objects at specific points through automatic identification. The objectives of these two implementations can be able to improve the efficiency of logistics management for RMC truck process, and to verify the technical and practical feasibility of PMIS+RFID application in construction industry. This may be realistic given the dynamics of daily activities on construction sites. This research is focused on examples on real world case study, applications and research theme related and connected to PMIS+RFID technology. It demonstrated that PMIS+RFID technology has been automatically implemented and has shown process information about the RMC truck and the overall status information about it, both quickly and accurately. As a result, the construction site where needs 300 $m^3$ pouring (50 RMC trucks) per day can be reduced total 250 minutes. Moreover, this time saving is related to the labour cost saving. From the case studies, RFID+PMIS system was proven in terms of effectiveness rather than current method.

Minimizing Cost and Delay in Shared Multicast Trees

  • Koh, Seok-Joo;Yi, Jong-Hwa;Hahm, Jin-Ho;Chin, Byoung-Moon;Park, Chee-Hang
    • ETRI Journal
    • /
    • v.22 no.1
    • /
    • pp.30-37
    • /
    • 2000
  • Existing tree construction mechanisms are classified into source-based trees and center-based trees. The source-based trees produce a source-rooted tree with a low delay. However, for the applications with multiple senders, the management overheads for routing tables and resource reservations are too high. The center-based trees are easy to implement and manage, but a priori configuration of candidate center nodes is required, and the optimization mature such as tree cost and delay is not considered. In this paper, we propose a new multicast tree building algorithm. The proposal algorithm basically builds a non-center based shared tree. In particular, any center node is not pre-configured. In the purposed algorithm, a multicast node among current tree nodes is suitably assigned to each incoming user: Such a node is selected in a fashion that tree cost and the maximum end-to-end delay on the tree are jointly minimized. The existing and proposed algorithms are compared by experiments. In the simulation results, it is shown that the proposed algorithm approximately provides the cost saving of 30% and the delay saving of 10%, compared to the existing approaches. In conclusion, we see that the cost and delay aspects for multicast trees can be improved at the cost of additional computations.

  • PDF

A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings (초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구)

  • Kim, Gwang Hee;Kim, Jae Yeob;Seo, Deok Seok;An, Sung Hoon;Choi, Hee Bok;Jung, Beong Won
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.

Development of Continuous Rectangular Spiral Hoop Bar Construction for RC Beam and Column (연속후프를 이용한 철근콘크리트 보, 기둥 철근배근 공법 개발)

  • Park, Sung-Woo;Kwak, Chang-Sik;Jin, Jong-Min;Park, Hong-Geun;Kang, Su-Min;Kim, Hyo-rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.171-172
    • /
    • 2012
  • In this study the continuous rectangular spiral hoop is used for saving cost and time, solving manpower shortage, and the quality of structures. Generally the use of continuous spiral reinforcement in reinforced concrete elements improve the strength and the ductility of the concrete. Savings in cost and time is demonstrated with the continuous rectangular spiral hoop through the mock up test of beam and column elements. In case of a 4m column element the time of rebar work decreases up to 40% compared with traditional hoop, and in case of a 8m beam the time also decreases 40%. This study present the construction method and details.

  • PDF

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

Economic Evaluation on Energy System Using River Water (하천수 이용 열원시스템의 경제성 평가)

  • Lee, Chulgoo;Kim, Jongdae;Im, Taesoon;Choi, Myungsik;Pang, Seungki;Ham, Heungdon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.9 no.2
    • /
    • pp.25-31
    • /
    • 2013
  • It has become very important for unused energy to be used for building air conditioning. Economic evaluation on energy system by using river water as a heat source, which is one of the unused energy, was carried out. The floor area of the building and the distance between heat source equipment and river was assumed $50,000m^2$ and 200 m. General heat source system using absorption chiller-heater was used for comparing to the energy saving system, and payback period method using initial cost and running cost of two systems, was used to perform economic evaluation. According to development of high capacity of water source heat pump which is appropriate for using river water, initial cost for the system has been reduced. Payback period was about 3.2 years, and this period might be shortened if nation's economic support enact.

A Construction Method of Expert Systems in an Integrated Environment

  • Chen, Hui
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2001.01a
    • /
    • pp.211-218
    • /
    • 2001
  • This paper introduces a method of constructing expert systems in an integrated environment for automatic software design. This integrated environment may be applicable from top-level system architecture design, data flow diagram design down to flow chart and coding. The system is integrated with three CASE tools, FSD (Functional Structure Diagram), DFD (Data Flow Diagram) and structured chart PAD (Problem Analysis Diagram), and respective expert systems with automatic design capability by reusing past design. The construction way of these expert systems is based on systematic acquisition of design knowledge stemmed from a systematic design work process of well-matured developers. The design knowledge is automatically acquired from respective documents and stored in the respective knowledge bases. By reusing it, a similar software system may be designed automatically. In order to develop these expert systems in a short period, these design knowledge is expressed by the unified frame structure, functions of th expert system units are partitioned mono-functions and then standardized components. As a result, the design cost of an expert system can be reduced to standard work procedures. Another feature of this paper is to introduce the integrated environment for automatic software design. This system features an essentially zero start-up cost for automatic design resulting in substantial saving of design man-hours in the resulting in substantial saving of design man-hours in the design life cycle, and the expected increase in software productivity after enough design experiences are accumulated.

  • PDF

A Study on Application of the Building Energy Management System(BEMS) for Korean Small or Medium Buildings (국내 중소규모 건축물의 에너지관리시스템 적용방안에 관한 연구)

  • Byun, Jeong-Yoon;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.159-160
    • /
    • 2011
  • Recently there are many efforts for saving energy in building. therefore Building energy management systems(BEMS) are expected to a reduction energy cost. BEMS has many benefits which could switch plant on and off automatically. Also It optimize plan operation and services, monitor plant status and environmental conditions and to provide energy analysis and management information. In these days, many public buildings are applied BEMS but there are few studies about application of small or medium buildings. Therefore, in this study, we will find how to apply BEMS in small or medium buildings.

  • PDF