• Title/Summary/Keyword: Construction Cost Management

Search Result 2,003, Processing Time 0.026 seconds

An Empirical Study on Top Management's Leadership in Construction Quality Management Activities and Construction Quality Management Performance (최고경영자의 리더십이 건설품질경영활동과 건설품질경영성과에 관한 실증연구)

  • Cho, Jin-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.3
    • /
    • pp.403-426
    • /
    • 2017
  • Purpose:?The purpose of this study is to analyze the causal relationship between top management 's leadership and construction quality management activities that affect construction management performance based on construction quality management. Methods:?As its method, the causal relationship between the leadership of top management and the key management factors of construction quality management activities affecting management performance is analyzed by using the structural equation model. The construction companies used in the analysis sample conducted surveys on companies that are conducting ISO, KOSHA, OHSAS, DQC, and so on. Results:?It was revealed that top management's leadership has a great influence on management performance and all management factors of construction quality management activities. However, safety management does not affect the management performance of construction quality management activities. And top management's leadership on management performance are explained by the mediating effect of cost, time, quality and communication among management factors of construction quality management activities. Conclusion:?In the previous study, the quality management activities and the ISO - based integrated total quality management system (TQM) applied in the manufacturing or service industries were presented as empirical results. However, this study presents the results of different studies by presenting empirical study results by selecting time, cost, quality, safety and communication as key management factors of quality management activities of construction companies through reviewing and analyzing previous studies in construction field.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Key Influence Factors for Efficient Cost Management of Design Stages (설계단계 공사비관리 효율성의 주요영향요인 분석)

  • Woo, Yu-Mi;Song, Jong-Kwan;Cho, Kyu-Man;Lee, Hyung-Jong;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.176-184
    • /
    • 2007
  • Recently, in the korean construction industry, the importance of cost management in the building design process has been grown up institutional systems and policies for the cost management of design stages are however weakness. Traditionally, the range of cost management has been limited to the construction stages, and due to inefficiency of the infrastructure such as standards and building cost data for cost management. It has trouble to perform the cost management in building design process. This study intends to derive key influence factors for raising efficiency of cost management. With questionnaire surveys to professionals, we analyze a current situations and the influence of obstacle factors on cost management. Finally, the key influence factors are induced, based on the result of the analysis on influence the obstacle factors.

Analysis of the HwaSungSungYoukEuGye for Estimating the Resources of PalDal-Mun Construction (팔달문 건설의 소요자원 산정을 위한 화성성열의궤 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05c
    • /
    • pp.1-6
    • /
    • 2009
  • The HwaSungSungYouk is one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recorded in HwaSungSungYoukEuGye. The purpose of this study is to analyse the data in HwaSungSungYoukEuGye in viewpoint of today's construction management for estimating the resources of PalDal-mun construction. In the record, there are a 10t of information relate to time management, cost management and human resource management, and the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYoukEuGye.

  • PDF

ICT IMPLEMENTATION FOR MATERIALS MANAGEMENT IN CONSTRUCTION PROJECTS

  • N.B. Kasim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.195-200
    • /
    • 2011
  • Construction materials usually constitute a major portion of the total cost in a building construction project. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the interviews reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

  • PDF

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

The Concept of Construction Management Showing up the HwaSungSungYoukEuGye in Choson Dynasty (조선시대 화성성역의궤의 건설관리적 의미)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.167-171
    • /
    • 2008
  • HwaSungSungYouk was one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recored in HwaSungSungYoukEuGye. The purpose of this study is to analyse the HwaSungSungYoukEuGye' management technic in viewpoint of today's construction management. In the record, there are a lot of informtion relate to record management, time management, cost management, etc. and the concept of the managements can be applied to today's construction project effectively. The concept and detail of the HwaSungSungYouk's project management should be analysed more.

  • PDF

A Study on the Improvement of Industrial Safety and Health Management Cost Using the Survey of Construction Safety Experts (건설안전전문가 설문조사를 활용한 현장중심의 안전관리비 제도 개선 연구)

  • Ko, Jae-Hwan
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.2
    • /
    • pp.331-342
    • /
    • 2020
  • Purpose: This study concerns the cost of safety management in order to prevent accidents and disabilities in the construction industry. The purpose of the Chapter is to draw up problems and improvement measures for these safety management costs. Method: A detailed questionnaire was developed for 20 construction safety managers for the research. This questionnaire was analyzed and implemented by the Expert Group Interview (FGI) analysis method. Results: In order to understand the safety management cost system, alternatives such as preparing a standard manual, implementing regular on-site training, and establishing a monitoring system for the safety management cost were derived. In addition, there is a need to ensure autonomy in the execution of flexible costs so that they can be deployed immediately in case of emergency to improve the 'efficiency and necessity of the safety negligence system'. And it was analyzed as items that should be improved due to excessive demand for documentation. Conclusion: Through this study, problems should be recognized for the improvement of the construction safety management cost system. And it will have to come up with policy-based and institutional-improvement measures for experts.

A Neural Network Model for Building Construction Projects Cost Estimating

  • El-Sawalhi, Nabil Ibrahim;Shehatto, Omar
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.9-16
    • /
    • 2014
  • The purpose of this paper is to develop a model for forecasting early design construction cost of building projects using Artificial Neural Network (ANN). Eighty questionnaires distributed among construction organizations were utilized to identify significant parameters for the building project costs. 169 case studies of building projects were collected from the construction industry in Gaza Strip. The case studies were used to develop ANN model. Eleven significant parameters were considered as independent input variables affected on "project cost". The neural network model reasonably succeeded in estimating building projects cost without the need for more detailed drawings. The average percentage error of tested dataset for the adapted model was largely acceptable (less than 6%). Sensitivity analysis showed that the area of typical floor and number of floors are the most influential parameters in building cost.