• Title/Summary/Keyword: Construction Contractor

Search Result 397, Processing Time 0.024 seconds

A Study on the Perception Level of Quality Management System by Construction Subject (건설공사 주체별의 품질관리제도 인식수준에 관한 연구)

  • Kim, Seong-Deok;Cho, A-Yeong;Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.253-254
    • /
    • 2023
  • We this study investiged the level of perception such as construction quality-related systems according to the subject of construction work. The results of the recognition moisture survey showed a high response rate in the order of construction companies and supervisors. The result of the system's level of understanding was low at 3.6 points for the orderer and contractor. In addition, in recognition of the effectiveness of the quality management system, the contractor showed a somewhat negative perception than other targets.

  • PDF

A Study of the China Construction Laws and BOT Policies from Overseas EPC Contractor's View (중국 건설 법률과 BOT 정책에 대한 조사 연구;해외 EPC 건설업체의 관점)

  • Choi, Jae-Ho;Park, K.R.;Yun, H.J.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.519-522
    • /
    • 2007
  • China infrastructure construction market has huge potential for increased use of PPP/BOT mode and one of the most attractive markets of doing business. However, there are still a multitude of challenges for overseas EPC contractor to enter into the China PPP/BOT market both internally and externally. Especially, the construction legal system and relevant policies are considered at present the biggest barriers in accessing China construction market. Therefore, the main purpose of the paper is to identify the impact of the construction laws, regulations and BOT-related policies on the viability of foreign contractor-led BOT project in China. To the satisfaction of the purpose, this paper will first analyze China construction laws based on the key issues that must be tackled by foreign EPC contractor before they enter into China. This summary gives the possible contract scheme for a BOT project of interest in which foreign contractors could define the scope of works and measure the viability of the project. Finally, a case study of wastewater treatment plant BOT project in China subsequently illustrates some of the lessons learned from the foreign contractor's perspectives for successfully participating in future environmental market in China.

  • PDF

A Study on the Contractor's Liability for the Defects in the Public Construction Works (공공건설사업의 하자에 대한 수급인의 책임에 관한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2002
  • Although Public Construction Works in Korea have been executed according to Government Contract Act, and nature of contract is very complicated. So it is difficult to define liability for the defects. Therefore the studies on the defective performance and contractor's defects liability were remained one of the non-cultivated virgin land. As a result, contract privy waive the right to claim or generally resolve the problems. Therefore domestic and overseas liability for the defects was investigated and liability for the defects, under and after construction, on the defective performance and defects, was analysed. With a literature research, contractor's defect liability was systematically analyzed, problems were defined and resolution of the problem were suggested item by item in this study.

  • PDF

A Study of Mediative Function by Contract on the Relationship between Employer's Power and Contractor's Behavior (발주자 권력과 시공사 행동 관계에서 계약의 매개적 기능에 관한 연구)

  • Kim, Junghoon;Kim, Seungchul;Boo, Jeman
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.135-143
    • /
    • 2018
  • Normally there is a one-time relationship between stakeholders in the construction projects. Thus, project participants are easily exposed to opportunistic behavior. According to the theory of transaction costs, a contract effectively influence the behavior of counter-party. The important role of contracts in limiting opponent opportunistic behavior has been academically acknowledged and studied in inter-firm relationships. The purpose of this study is to reveal the mediating effect of the contract on the power of the contractor in the contractor's behavior. Power is divided into mediated and non-mediated power. We surveyed construction companies' employees who have conducted construction projects. Based on the questionnaire response, we examined the influence of the Employer's power on the behavior of the contractor. Both non-mediated power and mediated power were significant for in-role and out-role behaviors. Both non-mediated power and mediated power were found to have a significant effect on the control and coordination function of contracts. The results show that the control function of the contract is significant for the in-role behavior and the extra-role behavior. Finally, the mediating effect of the contract function was significant only in the control function.

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF