Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

Contractor Selection Method for Public Design-Build Projects (대형 공공 일괄입찰사업의 낙찰자 선정방식에 관한 연구)

  • Jung Dae-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.119-124
    • /
    • 2006
  • Design-Build, one contractor is responsible for both the design and construction, has become more popular since the government framed the policy on how to activate the design-build projects in 1996. The reality is, however, there are many problems encounted on Contractor Selection Method for Public Design-Build Projects. The purpose of this paper is to improve the problems, no way to meet the goal(value) the owners expect from the design-build projects, for instance, not fully reflecting the characteristics of projects and owners intention, not systematical enough to judge if bidders could carry out the contract. This study will insist we introduce Best Value Procurement, which is being commonly used in some advanced countries recently, so that we would properly select the contractor suitable for Best Value concept which totally depends on the owners, types of work and specified conditions. Furthermore, by passing through the Two-Step Procedures following Pre-qualification in Best Value Procurement, we expect it lighten the bidders' burden for proposal and the owners' complicate bid administration.

  • PDF

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors (국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여)

  • Son Hyun-Duck;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.292-295
    • /
    • 2002
  • A purpose of subcontractor management succeed in construction project. Specially in the subcontractor management of quality management, it is necessary that subcontractors not only acquire ISO 9000 quality system certification but also continuously and without a break fulfill ISO 9000 quality system. As a result, we proposed that a general contractor play an important role in a manager of subcontractors to keep up the ISO 9000 duality system of subcontractors.

  • PDF

MEASURING ATTITUDE OF A CONTRACTOR COMPANY

  • Nirmal Kumar Acharya;Lee Young-Dai;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.451-456
    • /
    • 2004
  • Attitude is very difficult to be measured directly; therefore it must be inferred frrom assumed relationship with observable indicators. In some aspects, behavior represents the attitude of a person about a thing, person or issue. In this paper a tool has been devised to measure the attitude of contractor in ongoing project. However, the tool has been tested in a completed technical school construction project in Nepal. The results show that the tool can reasonably measure the attitude of the contractors and can be helpful for the owners to control the projects.

  • PDF

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

Analysis Framework of General Contractors' Financial Supports for Specialty Contractors (전문건설업체와의 상생협력을 위한 일반건설업체의 재무지원 분석틀 개발에 관한 연구)

  • Lee, Sang-Ok;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.459-462
    • /
    • 2008
  • The formation of partnering between general contractor and specialty contractor is required for sustainable development of construction industry and mutual benefit. General contractors are operating various kind of supporting program for collaboration. Especially, they are focusing on financial supports as a most effective way. This paper presents a framework for analysing financial supports derived from various systems of categorization.

  • PDF