Deduction or Importance Analysis for Pre-dispute Factors in the Constructions (건설공사 사전분쟁요인 도출 및 중요도 분석)

  • Park, Sung-Yong;Ko, Dae-Jun;Ha, Bong-Gyun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.505-508
    • /
    • 2008
  • It's hard to express a lot of information within the drawings and the specifications as construction projects have gradually become large-size and complex. So, disputes are caused by that and reason that the usual practice(culture) of contract of the constructions in Korea is based on unfair rather than the fair principle between clients and contractors. However, the contractors don't try to solve this kind of things because they are worried about at their disadvantage situation. Therefore, this paper deduced the factors in the pre-dispute phase by analysing the cases of the civic counseling in the office of supply and the pre-dispute factors, and conduct analysis on the factors' importance by using AHP. The results will be used for a check-list to prevent the disputes.

  • PDF

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

A Study on the Application of Design Process in the Architectural Design Practice (건축설계 실무과정에서 디자인 프로세스의 적용에 관한 연구)

  • Kang, Mi-hyun;Kim, So-ra;Shin, Byeong-uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.3
    • /
    • pp.59-66
    • /
    • 2022
  • This study aims to find out how architectural designers applied the design process and what content is applied in the practical process of architectural design in Korea, and to improve it if there is a problem. So the study is carried out by investigating 13 architects(Including one person who wants to keep his work private) with extensive experience in architectural design. The architects were questioned on how and what content the design process was used for their representative works that had been designed. And interviews and field surveys were conducted on other matters to be improved. The survey was conducted from November 2021 to July 2022. According to the conclusion of this study, First, Most architects were applying the design process in the architectural design practice. These are caused by an impact on education, but there was also an aspect of preparation in terms of guidelines such as the Architects Association and storage rights. Second, Although the design process differed in each name and phase, it was generally carried out in the order of the start phase, the planning work phase, the basic design phase, the intermediate design phase, the implementation quarterly, and construction. Third, The step-by-step work of the design process differed slightly depending on the architect, but counseling and contract work were mainly performed at the start-up phase, and field surveys, legal investigations, and case studys were conducted at the planning phase. In the basic design phase, some contents related to architectural programming, basic drawings, images, and models were used as main work contents. In the intermediate design phase, secondary contents such as licensed books and facility facilities were the main tasks. In the implementation design phase, detailed maps and various frost facilities were finally inspected. Since then, construction and supervision have been carried out in the order of progress. Forth, As for the contents to be improved in the future, the architect's ability, the designer's knowledge of the overall architecture, the design supervision system, and the expansion of time for the initial design process were answered.

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

Brief Observation on Arbitration Agreement and Arbitral Award - Focusing on Construction Disputes - (중재합의와 중재판정에 관한 소고 -건설분쟁을 중심으로-)

  • Cho Dae-Yun
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.273-314
    • /
    • 2004
  • There is a belief in the construction industry that the traditional court system may not be an ideal forum to effectively and efficiently resolve construction disputes due to the protracted proceedings and the three tier appeal system resulting in a long delay in the final and conclusive settlement of the dispute, relatively high costs involved, the lack of requisite knowledge and experience in the relevant industry, etc. Hence, they assert that certain alternative dispute resolution ('ADR') methods, such as mediation, conciliation, arbitration or a new system for dispute settlement in the form of any combination thereof should be developed and employed for construction disputes so as to resolve them more promptly and efficiently to the satisfaction of all the disputants concerned. This paper discusses certain merits of such assertions and the need for additional considerations for effective resolution of the construction disputes in light of the complexity of the case, importance of expert witnesses, parties' relationship and non-level playing field of the construction industry and so on. At the same time, however, given the inherent nature of disputes rendering the parties involved in an adversarial position, it would rather be difficult, if not practically impossible, to satisfy all the parties concerned in the dispute. Accordingly, in this study, it is also purported to address the demerits of such assertions by studying the situation from a more balanced perspective, in particular, in relation to the operation of such ADRs. In fact, most of such ADRs as stipulated by special acts, such as the Construction Industry Basic Act of Korea, in the form of mediation or conciliation, have failed to get support from the industry, and as a result, such ADRs are seldom used in practice. Tn contrast, the court system has been greatly improved by implementing a new concentrated review system and establishing several tribunals designed to specialize in the review and resolution of specific types of disputes, including the construction disputes. These improvements of the court system have been warmly received by the industry. Arbitration is another forum for settlement of construction disputes, which has grown and is expected to grow as the most effective ADR with the support from the construction industry. In this regard, the Korean Commercial Arbitration Board ('KCAB') has established a set of internal rules end procedures in operation to efficiently handle construction disputes. Considering the foregoing, this paper addresses the most important elements of the arbitration, i.e., arbitration agreement and arbitral award, primarily focusing on the domestic arbitrations before the KCAB. However, since this parer is prepared for presentation at the construction disputes seminar for the public audience, it is not intended for academic purposes, nor does it delve into any specific acadcmic issues. Likewise, although this paper addresses certain controversial issues by way of introduction, it mainly purports to facilitate the understanding of the general public, including the prospective arbitrators on the KCAB roster without the relevant legal education and background, concerning the importance of the integrity of the arbitration agreement and the arbitral award. In sum, what is purported in this study is simply to note that there are still many outstanding issues with mediation, conciliation and arbitration, as a matter of system, institutional operation or otherwise, for further study and consideration so as to enhance them as effective means for settlement of construction disputes, in replacement of or in conjunction with the court proceeding. For this purpose, it is essential for all the relevant parties, including lawyers, engineers, owners, contractors and social activists aiming to protect consumers' and subcontractors' interests, to conduct joint efforts to study the complicated nature of construction works and to develop effective means for examination and handling of the disputes of a technical nature, including the accumulation of the relevant industrial data. Based on the foregoing, the parties may be in a better position to select the appropriate dispute resolution mechanism, a court proceeding or in its stead, an effective ADR, considering the relevant factors of the subject construction works or the contract structure, such as the bargaining position of the parties, their financial status, confidentiality requirements, technical or commercial complexity of the case at hand, urgency for settlements, etc.

  • PDF

Case study of design and construction for cutter change in EPB TBM tunneling (EPB 쉴드 TBM 커터 교체 설계 및 시공 사례 분석)

  • Lee, Jae-won;Kang, Sung-wook;Jung, Jae-hoon;Kang, Han-byul;Shin, Young Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.553-581
    • /
    • 2022
  • Shortly after tunnel boring machine (TBM) was introduced in the tunneling industry, the use of TBM has surprisingly increased worldwide due to its performance together with the benefit of being safely and environmentally friendly. One of the main cost items in the TBM tunneling in rock and soil is changing damaged or worn cutters. It is because that the cutter change is a time-consuming and costly activity that can significantly reduce the TBM utilization and advance rate and has a major effect on the total time and cost of TBM tunneling projects. Therefore, the importance of accurately evaluating the cutter life can never be overemphasized. However, the prediction of cutter wear in soil, rock including mixed face is very complex and not yet fully clarified, subsequently keeping engineers busy around the world. Various prediction models for cutter wear have been developed and introduced, but these models almost usually produce highly variable results due to inherent uncertainties in the models. In this study, a case study of design and construction of disc cutter change is introduced and analyzed, rather than proposing a prediction model of cutter wear. As the disc cutter is strongly affected by the geological condition, TBM machine characteristic and operation, authors believe it is very hard to suggest a generalized prediction model given the uncertainties and limitations therefore it would be more practical to analyze a real case and provide a detailed discussion of the difference between prediction and result for the cutter change. By doing so, up-to-date idea about planning and execution of cutter change in practice can be promoted.