• 제목/요약/키워드: Construction Claims

검색결과 134건 처리시간 0.022초

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

CONSTRUCTION MANAGEMENT KNOWLEDGE IN PREPARING AND RESOLVING CONSTRUCTION CLAIMS

  • Ting-ya Hsieh
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.681-686
    • /
    • 2005
  • This paper discusses the role of construction management (CM) profession in claims management. It reviews the attitudes, psychology and practices relevant to CM knowledge. It is the purpose of this paper to highlight CM profession's knowledge in this area as this profession's core competence in contemporary construction.

  • PDF

공공건설사업에서 업무단계별 클레임준비 절차 (A Suggestion of Claims Preparation Procedure in the Public Sector)

  • 조영준;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.54-62
    • /
    • 2001
  • 건설사업에서 클레임은 필수적으로 발생하는 요소이다. 1998년까지 우리나라에서 건설클레임이 체계적으로 제기되거나 해결되었다고 소개된 바는 없으나, 1998년을 기점으로 하여 IMF환란 등을 겪으면서 건설업체들은 원가관리의 중요성을 인식하여 계약에서 주어진 자신의 권리를 찾고자 하는 노력을 경주해 오고 있다. 그러나 건설클레임이 활성화됨으로 인해 기술자의 전문업역탄생, 책임시공으로 인한 부실공사예방, 불필요한 예산낭비억제, 중복업무의 감소 및 규제개선 등의 기대효과가 장단기적으로 예상됨에도 불구하고 아직도 건설현장에서는 클레임을 제기하는 것에 대하여 막연한 두려움이나 경계심을 갖는 분위기가 팽배하였다. 따라서 본 논문은 1998년부터 공공건설사업현장에서 제기된 클레임사례를 분석한 후, 시공자가 건설현장에서 체계적으로 건설클레임을 제기할 수 있는 방법과 절차를 제시하고자 한다.

  • PDF

국내 건설클레임 및 분쟁해결 프로세스 개선방안 - 건설보증을 중심으로 - (Improvement Plan for Domestic Construction Claims & Disputes Resolution Process - Focused on the Construction Bonds -)

  • 김종서;이재섭
    • 한국건설관리학회논문집
    • /
    • 제6권4호
    • /
    • pp.181-189
    • /
    • 2005
  • 최근 국내 건설산업 환경의 급격한 변화에 따라 건설업계가 감내해야 하는 어려움이 가중되고 있다. 특히, 발주자의 재무능력 악화로 인한 공사 중단 계약 해제 등으로 건설 클레임이 꾸준히 증가하고 있는 추세이다. 이러한 경우 보증채권자는 클레임을 제기하게 되며 건설업체에 신용을 공여한 보증기관들이 부담해야 하는 대위변제 금액이 증가하고 있다. 그러나, 건설 프로젝트의 성공적 인 수행을 위하여 건설보증이 매우 중요한 역할을 담당하고 있음에도 불구하고 건설보증과 관련된 클레임에 관해 연구 및 실무 차원에서 관심을 크게 받지 못한 실정이다. 따라서, 본 연구에서는 국내 건설보증기관의 클레임 및 분쟁처리 현황을 보증 유형 별로 살펴보고 이에 대한 개선방안을 제시하였다.

Selection of Key Management Targets for Claim Causes through Relational Analysis on the Causes of Change Order Claims

  • Min, Kwang-Ho;Ko, Gun-Ho;Jin, Chengquan;Hyun, Chang-Taek;Han, Sang-Won
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.281-290
    • /
    • 2017
  • As various stakeholders are involved in construction projects, disputes between the parties are more likely to occur, which is a very important issue for the participants in the projects. Claims in construction projects, however, are very complex and thus difficult to manage. In particular, as the cause of a claim in the preceding stage that has not been resolved in a timely manner has an effect on the cause of a claim in the following stage, it is difficult to find a point of compromise regarding a claim caused by the relationship between the causes that occur in the preceding and following stages. In this regard, this study sought to examine the rules for the generation of change order claims, which occur most frequently among the construction claims, and thus to select the key management targets through the analysis of the relationship between the causes of claims arising in the preceding and following stages for the efficient management of claims. It is expected that the use of rules for the generation of change order claims as well as of representative and similar cases will help the construction practitioners in judging claims, considering the relationships among the causes of the claims. Meanwhile, in this study, association analysis was conducted regarding the causes of the occurrence of change order claims in a design-build delivery method, and therefore, it is necessary to verify the effectiveness of the method when applied to other delivery methods.

  • PDF

FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출 (Identification of Claim Elements for Design Build Projects using FMEA Method)

  • 윤석민;현창택;한상원;차용운
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

Systematic Literature Review for the Application of Artificial Intelligence to the Management of Construction Claims and Disputes

  • Seo, Wonkyoung;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.57-66
    • /
    • 2022
  • Claims and disputes are major causes of cost and schedule overruns in the construction business. In order to manage claims and disputes effectively, it is necessary to analyze various types of contract documents punctually and accurately. Since volume of such documents is so vast, analyzing them in a timely manner is practically very challenging. Recently developed approaches such as artificial intelligence (AI), machine learning algorithms, and natural language processing (NLP) have been applied to various topics in the field of construction contract and claim management. Based on the systematic literature review, this paper analyzed the goals, methodologies, and application results of such approaches. AI methods applied to construction contract management are classified into several categories. This study identified possibilities and limitations of the application of such approaches. This study contributes to providing the directions for how such approaches should be applied to contract management for future studies, which will eventually lead to more effective management of claims and disputes.

  • PDF

현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로- (A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector -)

  • 정명우;이화영;서용칠;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.46-53
    • /
    • 2001
  • 정부의 지속적인 사회간접시설의 건설로 많은 대형공공공사가 발주되고 있으며, 이에 따라 많은 건설 클레임이 발생되고 있으며, 그 .중에서도 현장여건상이 클레임은 발생가능성이 높은 부분이다. 특히 현장여건상이 클레임은 여타 클레임과 달리 공사 초기에 발생하여 여타의 클레임보다 큰 손실을 초래할 수 있으므로 이에 대한 예방방안의 필요성이 증대되고 있다. 본 연구는 국내의 대형공공공사 중 일괄공사계약으로 발주된 공사에서 발생한 현장여건상이 클레임의 원인을 분석하고, 향후 이러한 클레임을 예방할 수 있는 예방방안을 제시하였다. 본 연구에서 제시하고 있는 예방방안으로는 첫째 수급자의 입찰관행 개선, 둘째 수급자의 현장조사 책임한계 정립, 셋째 발주자의 면책조항 재검토 그리고 마지막으로 계약금액 조정의 유연성을 확보하기 위한 방안 등을 제시하고 있다. 또한 상기의 예방방안에 대한 단·장기적 대안도 제시했다. 이러한 예방방안들은 발주자와 수급자 사이에서 현장여건상이 클레임의 해결에 사용될 수 있을 것으로 판단된다.

  • PDF

건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 - (A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project -)

  • 윤준선;서춘택
    • 한국중재학회지:중재연구
    • /
    • 제15권1호
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF