• 제목/요약/키워드: Construction Capacity

검색결과 2,815건 처리시간 0.028초

Upgrading flexural performance of prefabricated sandwich panels under vertical loading

  • Kabir, M.Z.;Rezaifar, O.;Rahbar, M.R.
    • Structural Engineering and Mechanics
    • /
    • 제26권3호
    • /
    • pp.277-295
    • /
    • 2007
  • 3-D wall panels are used in construction of exterior and interior bearing and non-load bearing walls and floors of building of all types of construction. Fast construction, thermal insulation, reduced labor expense and weight saving are the most well pronounced advantage of such precast system. When the structural performance is concerned, the main disadvantage of 3D panel, when used as floor slab, is their brittleness in flexure. The current study focuses on upgrading ductility and load carrying capacity of 3D slabs in two different ways; using additional tension reinforcement, and inserting a longitudinal concentrated beam. The research is carried on both experimentally and numerically. The structural performance in terms of load carrying capacity and flexural ductility are discussed in details. The obtained results could give better understanding and design consideration of such prefabricated system.

인천국제공항 제4활주로 건설 타당성 연구 (A Study on feasibility for runway development -IIAC 4th runway construction case study-)

  • 최동엽;신중하;장찬혁;박성도
    • 한국항공운항학회지
    • /
    • 제27권2호
    • /
    • pp.37-46
    • /
    • 2019
  • Although This study is to produce various considerations for the proper time and feasibility of new runway with Incheon international airport $4^{th}$ runway development case. In order to validate the feasibility of runway development, it is main considerations to be increased airport capacity for accommodating increase air traffic demand, secure stable airport operation without degrading service level, cope with emergency situation and maintain competitive among competitive airports which are developing new runway. Conclusionally, to develop new runwlay at the proper time for sustainable and stable airport operation without stop is the best way of maintaining competitiveness among foreign competitive airports.

건축물의 친환경 시공·해체를 위한 재료 분리형 GLT-Steel 보 개발 (Development of a Separable Glued-Laminated Timber (GLT)-Steel Beam for Eco-Friendly Construction and Dismantling of Buildings)

  • 방성준;오정권
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.23-24
    • /
    • 2023
  • In this study, an easily recyclable separable glued-laminated timber (GLT)-steel beam was developed, and a structural design method was presented. The GLT and steel were mechanically composited using self-tapping screws. The GLT-steel beam was designed to fail in the compression of GLT. The bending moment and load-carrying capacity of the GLT-steel beam were predicted based on composite beam theory and compared with experimental test data. As a result, the GLT-steel beam exhibited ductile behavior, and compression failure of GLT was observed. The screw connection showed no damage while the steel plate was extended. The load-carrying capacity of GLT after failure was similar to the load resistance predicted by the compressive strength of GLT and the tensile strength of steel. This indicates that the ductile behavior of the GLT-steel beam can be safely designed by the tensile strength (yield) of steel.

  • PDF

도시지역 CSOs 저감을 위한 저류조 및 이송관로의 최적 용량결정에 관한 연구 (Study on the determination of optimum size of storage tank and intercepting capacity for CSOs reduction in urban area)

  • 이관용;최원석;이용재;구원석;송창수
    • 상하수도학회지
    • /
    • 제26권6호
    • /
    • pp.735-745
    • /
    • 2012
  • Storage method is one of major measures for reduction of CSOs pollutant loads and several projects have been done nationwide. But systematic analysis of intercepting capacity has not been studied to determine optimum size of storage facility. In this research, not only storage volume but also intercepting capacity which means flow capacity from intercepting facility to CSOs storage facility was studied and optimum sizing method for storage facility was proposed. The result shows that pollutants reduction efficiency can be increased significantly by increasing intercepting capacity and it might reduce storage volume and total construction costs. Intercepting capacity for the study area was evaluated and it was shown as equivalent to 83 % probability rainfall intensity.

Effect of connection rotation capacities on seismic performance of IMF systems

  • Han, Sang Whan;Moon, Ki-Hoon;Ha, Sung Jin
    • Earthquakes and Structures
    • /
    • 제10권1호
    • /
    • pp.73-89
    • /
    • 2016
  • The seismic performance of moment frames could vary according to the rotation capacity of their connections. The minimum rotation capacity of moment connections for steel intermediate moment frames (IMF) was defined as 0.02 radian in AISC 341-10. This study evaluated the seismic performance of IMF frames with connections having a rotation capacity of 0.02 radian. For this purpose, thirty IMFs were designed according to current seismic design provisions considering different design parameters such as the number of stories, span length, and seismic design categories. The procedure specified in FEMA P695 was used for conducting seismic performance evaluation. It was observed that the rotation capacity of 0.02 radian could not guarantee the satisfactory seismic performance of IMFs. This study also conducted seismic performance evaluation for IMFs with connections having the rotation capacity of 3% and ductile connections for proposing the minimum rotation capacity of IMF connections.

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문 발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

현대(現代) 건설관리개념(建設管理槪念)을 통한 "화성성역의궤(華城城役儀軌)"의 분석(分析)에 관한 연구(硏究) (A Study on the Analysis of the HwaSungSungYouk-EuGye in the Aspect of the Modern Construction Management -Focus on ChangAhn-Mun's Construction Work-)

  • 이태열;이상해
    • 건축역사연구
    • /
    • 제10권3호
    • /
    • pp.61-76
    • /
    • 2001
  • The purpose of this study is not only to evaluate the capacity of construction management but also to understand the capacity of construction productivity by analysing various information, mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. It is true that previous researches have showed lots of limitation to study the HwaSungSungYouk-EuGye though it contained a plenty of construction data. The main reason would be the absence of study methods to analyze HwaSungSungYouk-EuGye systematically. That's why there have not been overall studies about the HwaSungSungYouk-EuGye. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may Involve a single person or many thousands. This study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

공사관리업무에 대한 선호도 조사 연구 (A Field Study on the Preference in the Construction Management)

  • 이두진;최민권;손재진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.124-129
    • /
    • 2001
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF