Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.
건설 산업은 다른 산업에 비하여 많은 참여자가 있으며, 타 산업에 비하여 생산성이 많이 떨어지고 있다. 이에 본 연구에서는 BIM(Building Information Modeling)이 건설 산업의 생산성 향상에 큰 효과가 있을 것으로 파악하고, 건설산업에 적합한 BIM 적용 프로세스를 제안하고자 하였다. 이를 위하여 본 연구에서는 BIM에 대한 이론고찰과 기존 건설프로세스의 특성 분석을 통하여 개선사항들을 도출하였고, 개선사항을 해결하기 위한 BIM 적용 프로세스를 제시하였다. 그리고 개선 프로세스의 적용성 평가를 위하여 상용화된 BIM 관련 소프트웨어를 활용하여 Case Study를 수행하였다. Case Study 수행 결과 BIM Model의 건설 산업 적용 가능성과 BIM 적용 시 파급효과와 국내 적용을 위한 해결과제를 확인 할 수 있었다. 이를 토대로 국내 건설 산업의 BIM 적용에 이바지하는데 도움이 되고자 한다.
As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.
중국건설업에서는 BIM (Building Information Modeling)의 활용을 통해 건설업의 비효율적인 상호운용성의 문제를 해결하여 건설업의 총생산액 증가시키고자 한다. 하지만 중국 주건부에서 2011년부터 건설업의 BIM활용을 촉진하였음에도 불구하고 중국에서는 BIM 활용률은 45% 미만인 것으로 나타났다. 한편 한국 건설업은 중국보다 먼저 BIM 도입을 하여 활용하고 있는 만큼, BIM 활용수준과 BIM 수용의지가 중국보다 높을 것으로 예상된다. 따라서 본 연구에서는 한국과 중국의 BIM수용영향요인 비교분석을 통해 중국의 BIM 활용률을 향상시킬 수 있는 방안을 제안하고자 한다. 한국과 중국의 BIM수용영향요인 비교분석을 위해 기술수용이론(Technology Acceptance Model; TAM)과 BIM 수용모델 관련 선행연구고찰을 통해 BIM 수용영향요인을 분류하고, 중국의 국가적 특성과 중국건설업만이 가진 특성을 반영한 BIM 수용영향요인을 추가하여 실제 BIM 사용자인 한국과 중국 건설사업 참여주체(시공사, 설계사, CM)를 대상으로 설문조사를 실시하였으며, 통계값을 유의미한 차이를 알아보기 위해 SPSS 22.00을 활용하여 t-test 실시하였다. 마지막으로 t-test 결과를 기반으로 중국의 BIM 활용률을 향상시킬 수 있는 개선방안을 제안하였다. 본 연구의 결과를 통해 중국 건설업에 적합한 BIM 활용 활성화 방향을 제시하고, 중국 건설업의 BIM 활용 활성화 연구의 이론적 기초를 제공할 수 있을 것으로 기대한다.
BIM과 건설사업관리(Construction Management; 이하 CM)는 건설정보를 통합 관리하고 신뢰성 있는 의사결정을 지원하는 수단이라는 점에서 그 성격이 유사하기 때문에 BIM은 CM에 효율적으로 활용할 수 있으나, CM 분야에서 BIM 도입은 미흡한 실정이다. 이 연구의 목적은 시공단계의 CM 업무에 BIM을 효과적으로 활용할 수 있도록 업무절차 모델 및 가이드를 제시하는 것이다. 문헌조사를 통해 BIM 기능을 BIM 전환설계, 모델 검토, 데이터 추출, 자동 견적, 4D 시뮬레이션, 도면 생성, 엔지니어링 분야 연계분석 등으로 정의하고, CM 업무와 프로세스를 분석하여 BIM의 적용이 가능한 CM 업무를 도출하였다. BIM 기능과 CM 업무 간 연관성 분석을 통해 기존의 업무절차를 BIM 기능과 연계하여 재구성하고, 사업 참여자별 역할을 재정립하여 BIM기반 CM 업무절차 모델을 개발하였다. 개발된 모델의 효용성을 향상시키고자 면담조사와 사례조사를 통해 사업 참여자들의 BIM 업무를 기술한 가이드를 작성하였다. 또한 BIM기반 CM 업무절차 모델의 활용성을 검증하기 위한 선행연구의 BIM 프로세스와 비교 분석하고 전문가를 대상으로 설문조사를 수행하였다. 이 연구는 CM 분야에서 BIM의 활용성을 높이는데 기여할 수 있다. 향후에는 사례적용을 통해 실무적 관점에서 모델을 평가할 필요가 있으며, BIM 도입으로 인한 CM 업무의 확대를 고려하여 지속적으로 BIM기반 CM 업무절차 모델을 업데이트할 필요가 있다.
최근 BIM의 활용이 시각적인 3D모델링 이외에 일정 및 공사비 시뮬레이션, 시각적 공사현황관리, 증강현실적용 등으로 확장되면서, 이에 따른 다양한 BIM기능들이 개발되고 있다. 그러나 개발되는 기능들에 대해 명확한 분류기준과 지식정보가 부족하여, 공사프로젝트에 필요한 기능들을 파악하는데 어려움이 있다. 따라서 본 연구에서는 서로 다른 BIM기능의 특성을 반영하여 BIM기능요소 분류체계를 구성하고, 이를 기반으로 BIM기능을 발주할 수 있는 발주모형 구성 방안을 제시하고자 한다. 이로써, 철도시설사업에 적용할 수 있는 BIM기능을 분석하여 실무적 활용성을 높이고자 하였으며, 사례적용을 통해 활용성을 검증하고 있다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.280-283
/
2015
Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.
The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.
Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.
The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.