• 제목/요약/키워드: Construction BIM model

검색결과 392건 처리시간 0.025초

BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구 (Quantity Takeoff for Non-Selection Work Items based on BIM)

  • 박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

국내 건설 사업 BIM 적용을 위한 개념적 프로세스 모델 개발 (Development of a Conceptual Process Model for BIM Application in Korean Construction Industry)

  • 나경재;진경환;이동건;차희성
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.649-653
    • /
    • 2008
  • 건설 산업은 다른 산업에 비하여 많은 참여자가 있으며, 타 산업에 비하여 생산성이 많이 떨어지고 있다. 이에 본 연구에서는 BIM(Building Information Modeling)이 건설 산업의 생산성 향상에 큰 효과가 있을 것으로 파악하고, 건설산업에 적합한 BIM 적용 프로세스를 제안하고자 하였다. 이를 위하여 본 연구에서는 BIM에 대한 이론고찰과 기존 건설프로세스의 특성 분석을 통하여 개선사항들을 도출하였고, 개선사항을 해결하기 위한 BIM 적용 프로세스를 제시하였다. 그리고 개선 프로세스의 적용성 평가를 위하여 상용화된 BIM 관련 소프트웨어를 활용하여 Case Study를 수행하였다. Case Study 수행 결과 BIM Model의 건설 산업 적용 가능성과 BIM 적용 시 파급효과와 국내 적용을 위한 해결과제를 확인 할 수 있었다. 이를 토대로 국내 건설 산업의 BIM 적용에 이바지하는데 도움이 되고자 한다.

  • PDF

모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안 (Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System)

  • 이종호;엄신조
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF

한국과 중국의 BIM 수용영향요인 비교분석 (Comparative Analysis of BIM Acceptance Factors between Korea and China)

  • 송경욱;이슬기;유정호
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.3-14
    • /
    • 2021
  • 중국건설업에서는 BIM (Building Information Modeling)의 활용을 통해 건설업의 비효율적인 상호운용성의 문제를 해결하여 건설업의 총생산액 증가시키고자 한다. 하지만 중국 주건부에서 2011년부터 건설업의 BIM활용을 촉진하였음에도 불구하고 중국에서는 BIM 활용률은 45% 미만인 것으로 나타났다. 한편 한국 건설업은 중국보다 먼저 BIM 도입을 하여 활용하고 있는 만큼, BIM 활용수준과 BIM 수용의지가 중국보다 높을 것으로 예상된다. 따라서 본 연구에서는 한국과 중국의 BIM수용영향요인 비교분석을 통해 중국의 BIM 활용률을 향상시킬 수 있는 방안을 제안하고자 한다. 한국과 중국의 BIM수용영향요인 비교분석을 위해 기술수용이론(Technology Acceptance Model; TAM)과 BIM 수용모델 관련 선행연구고찰을 통해 BIM 수용영향요인을 분류하고, 중국의 국가적 특성과 중국건설업만이 가진 특성을 반영한 BIM 수용영향요인을 추가하여 실제 BIM 사용자인 한국과 중국 건설사업 참여주체(시공사, 설계사, CM)를 대상으로 설문조사를 실시하였으며, 통계값을 유의미한 차이를 알아보기 위해 SPSS 22.00을 활용하여 t-test 실시하였다. 마지막으로 t-test 결과를 기반으로 중국의 BIM 활용률을 향상시킬 수 있는 개선방안을 제안하였다. 본 연구의 결과를 통해 중국 건설업에 적합한 BIM 활용 활성화 방향을 제시하고, 중국 건설업의 BIM 활용 활성화 연구의 이론적 기초를 제공할 수 있을 것으로 기대한다.

시공단계의 BIM기반 건설사업관리 업무절차 모델 개발 (Development of BIM-based Work Process Model in Construction Phase)

  • 유용신;정지성;정인수;윤호빈;이찬식
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.133-143
    • /
    • 2013
  • BIM과 건설사업관리(Construction Management; 이하 CM)는 건설정보를 통합 관리하고 신뢰성 있는 의사결정을 지원하는 수단이라는 점에서 그 성격이 유사하기 때문에 BIM은 CM에 효율적으로 활용할 수 있으나, CM 분야에서 BIM 도입은 미흡한 실정이다. 이 연구의 목적은 시공단계의 CM 업무에 BIM을 효과적으로 활용할 수 있도록 업무절차 모델 및 가이드를 제시하는 것이다. 문헌조사를 통해 BIM 기능을 BIM 전환설계, 모델 검토, 데이터 추출, 자동 견적, 4D 시뮬레이션, 도면 생성, 엔지니어링 분야 연계분석 등으로 정의하고, CM 업무와 프로세스를 분석하여 BIM의 적용이 가능한 CM 업무를 도출하였다. BIM 기능과 CM 업무 간 연관성 분석을 통해 기존의 업무절차를 BIM 기능과 연계하여 재구성하고, 사업 참여자별 역할을 재정립하여 BIM기반 CM 업무절차 모델을 개발하였다. 개발된 모델의 효용성을 향상시키고자 면담조사와 사례조사를 통해 사업 참여자들의 BIM 업무를 기술한 가이드를 작성하였다. 또한 BIM기반 CM 업무절차 모델의 활용성을 검증하기 위한 선행연구의 BIM 프로세스와 비교 분석하고 전문가를 대상으로 설문조사를 수행하였다. 이 연구는 CM 분야에서 BIM의 활용성을 높이는데 기여할 수 있다. 향후에는 사례적용을 통해 실무적 관점에서 모델을 평가할 필요가 있으며, BIM 도입으로 인한 CM 업무의 확대를 고려하여 지속적으로 BIM기반 CM 업무절차 모델을 업데이트할 필요가 있다.

BIM 기능요소 분류체계 도출에 의한 철도시설공사 BIM 기능발주 구성 방안 (A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure)

  • 김영환;김현승;강인석
    • 한국철도학회논문집
    • /
    • 제18권4호
    • /
    • pp.344-353
    • /
    • 2015
  • 최근 BIM의 활용이 시각적인 3D모델링 이외에 일정 및 공사비 시뮬레이션, 시각적 공사현황관리, 증강현실적용 등으로 확장되면서, 이에 따른 다양한 BIM기능들이 개발되고 있다. 그러나 개발되는 기능들에 대해 명확한 분류기준과 지식정보가 부족하여, 공사프로젝트에 필요한 기능들을 파악하는데 어려움이 있다. 따라서 본 연구에서는 서로 다른 BIM기능의 특성을 반영하여 BIM기능요소 분류체계를 구성하고, 이를 기반으로 BIM기능을 발주할 수 있는 발주모형 구성 방안을 제시하고자 한다. 이로써, 철도시설사업에 적용할 수 있는 BIM기능을 분석하여 실무적 활용성을 높이고자 하였으며, 사례적용을 통해 활용성을 검증하고 있다.

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

실시설계단계 BIM과 도면의 정합성 검토를 위한 체크리스트 개발 (A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase)

  • 김병주;김이제;진상윤
    • 한국BIM학회 논문집
    • /
    • 제8권1호
    • /
    • pp.33-42
    • /
    • 2018
  • The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

소규모 건축공사의 BIM 정보 활용을 위한 프로세스 제안 - 철골공사 중심으로 - (Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -)

  • 김진광;유무영;함남혁;김재준;최창식
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.41-50
    • /
    • 2018
  • The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.