• Title/Summary/Keyword: Construction Area

Search Result 5,537, Processing Time 0.03 seconds

DEVELOPMENT AND APPLICATION OF FAILURE-BASED LEARNING MODEL FOR CONSTRUCTION TECHNOLOGY EDUCATION

  • Do-Yeop Lee;Cheol-Hwan Yoon;Chan-Sik Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.99-106
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning model

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

A Study on Changes in the Density of Eurasian Otter Spraints (2012-2016) - The Busan New Port - (수달배설물 밀도 변화에 대한 연구(2012-2016) -부산신항만-)

  • Cha, Hyoun-Gi;Kim, Ji-Hye;Yoon, Myung-Hee
    • Journal of Environmental Science International
    • /
    • v.26 no.4
    • /
    • pp.457-466
    • /
    • 2017
  • The extensive construction works of container terminals progressed since 2006 was converted to small scaled construction works or reclaiming works since 2012 in Busan New Port area. To investigate changes in activity of otters with the change of construction work scales, the linear densities of spraints at 15 localities of 5 areas (I-V) near the Busan New Port construction areas were surveyed during the period from 2012 to 2016. As the results, the average linear density of spraints has a tendency to increase since 2014. That is, the linear densities of spraints have increased at the area II and IV where the reclaiming works have been progressed, although have decreased or unchanged in the areas I, III and V where small scaled construction works have been progressed. Based on the fact that there were habitats at the Honamdo in the area II and the Yeondo in the area IV, otters seemed to restore their activities around the habitats as the center regardless of the reclaiming works.

An Analysis on Building Energy Load along Core Position, Area Ratio and Orientation (코어 위치와 종횡비 및 방위에 따른 건물 에너지 부하 분석)

  • Kim, Jin-Ho;Park, Woo-Pyoung;Shin, Seung-Ho;Min, Joon-Ki;Kim, Dong-Hoon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.9 no.1
    • /
    • pp.15-19
    • /
    • 2013
  • In this Study, effect of core position, area ratio and orientation of building on energy load is examined using TRNSYS17. This parameters are major parameters of the conceptual design stage. Reference model is square floor plan($1,444m^2$), centered core and 29% core area ratio. As the results, without considering the building orientation, the annual heating load of central building with 1:1 area ratio is lowest ($10.33kWh/m^2yr$) and the annual cooling load of off-central building with 1:1 area ratio is lowest ($59.27kWh/m^2yr$). As area ratio is bigger, cooling load is lower and heating load is higher. But if we consider building orientation, orders of heating load and cooling load are changed for area ratio and orientation.

Development of Technology for Network Construction using Wide Area Energy (광역에너지이용 네트워크 구축 기술개발)

  • Kim, Lae-Hyun;Chang, Won-Seok;Hong, Jae-Jun
    • Journal of Energy Engineering
    • /
    • v.17 no.3
    • /
    • pp.125-138
    • /
    • 2008
  • In order to diversify energy source and to utilize it effectively, it requires to construct an integrated energy management system in a wide area. This research paper explores the core technology of network construction using wide area energy and applies the technology to the field. In specific, it examines the business model by developing l) construction technology of optimum integrated system for thermal supply on wide area network related IT technology, 2) technology of unutilized energy as heat pump using exhaust gas latent heat, and 3) thermal transportation and storage technology using various sources, and by evaluating the applicability and marketability of the model in the field.

AN ESTIMATION METHOD OF WORKING AREA WITH RFID TECHNOLOGY

  • Soungho CHAE;Masasi SUZUKI;Yoshinori KAWAHARA;Naruo KANO
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.88-95
    • /
    • 2007
  • In this paper, the authors discussed the overview of a method for estimating working area for development of a monitoring system for labor management using RFID technology. RSSI (Receive Signal Strength Indication) data of RFID tag was obtained from readers set around the indoor space. An estimating model of the working area was prepared. The model had a range of the percentage of correctly classified from 61% to 95%. According to the result, the possibility of the monitoring system and the factors necessary to develop for practical were proposed.

  • PDF

Numerical Simulation on Hydrodynamic Characterization Changes Associated with the Construction of Dikes and Dredging Operations in Saemangeum Lake (새만금호 내 방수제 공사 및 준설에 의한 수리동역학적 특성 변화 수치 모델링)

  • Oh, Chan-Sung;Choi, Jung-Hoon;Cho, Young-Kweon
    • Journal of Environmental Science International
    • /
    • v.22 no.9
    • /
    • pp.1115-1129
    • /
    • 2013
  • The study area is located on the western coast, and the inner development construction has been ongoing since 2011. The purposes of current study are to effectively simulate and quantitatively predict a temporal and spatial distributions of water temperature and salinity due to the stages of inner development construction in saemangeum reclaimed area. The transient-state numerical modeling using EFDC model is done, and the numerical simulation results are validated reasonably by repetitive numerical model calibration procedures with respect to field measurements of water temperature and salinity. The spatial distributions of water temperature and salinity show similar trends before and after construction of the dikes. In spring season, the salinity has maximum value of 21 psu, while, in summer season, the salinity shows 7 psu in a whole modeling domain. Thus, it is clearly observed that salt water is replaced by freshwater. However, the salinity and temperature reach their initial conditions at the end of the year. The salinity after construction of the dikes is lower than that before construction of them at Mankyeong area. On the other hands, after construction of the dikes, the salinity after dredging operations is higher than that before dredging. Because drastical increasing of water volume in Saemangeum Lake leads to increasing of stagnation time at bottom layer, and salt water is easily intruded to the two estuaries. Therefore, it may be concluded that hydrodynamic characteristics on Saemangeum are dominated by either Mankyeong and Dongjin discharge or sluice gates in/out-flow amounts, and thus they must be properly considered when rigorous and reasonable predictions of water temperature and salinity according to the stages of inner development construction.

Analysis of Individual Tree Change Using Aerial Photograph in Deforested area Before and After Road Construction (항공영상을 활용한 도로개발 전·후 산림 훼손지 개체목 분석)

  • Choi, Jae-Yong;Kim, Seoung-Yeal;Kim, Whee-Moon;Song, Won-Kyong;Lee, Ji-Young;Choi, Won-Tae;Moon, Guen-Soo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.65-73
    • /
    • 2018
  • Although the road construction in forest is increasing and there is a need for development ecological restoration on deforest area, no consideration has been given to individual trees in there. This study analyzed aerial photographs of deforest area before and after road construction for determining the degree of forest destruction by extracting individual trees. Study area was selected in the sites where are damaged by road construction in GongJu-si, YuSung-gu, and YeongDong-gun. The aerial photograph taken 1979 before construction is panchromatic image of 80cm in GSD (Ground Sample Distance) and other photograph taken 2016 after construction is multi-spectral image of 10cm in GSD. In order to minimize the difference of GSD, we conducted image re-sampling process for setting to same GSD for the two photographs. After that we carried out visual interpretation method for determining to change of individual tree. The result found that for GongJu-si of the number of individual tree was 1,014 in 1979 and 886 in 2016, which decreased by 128 (12.6%) and the average width of those decreased from 5.77m to 5.75m by 0.47%. In case of YoungDong-gun, the number of it was 761 in 1979 and 746 in 2016, which decreased by 2.0% and the average width of it decreased from 8.99mm to 8.90m by 1.1%. Lastly in case of YuSung-gu, the number of it was 1,578 in 1979 and 988 in 2016, which decreased by 37.4% and the average width of it decreased from 7.09m to 6.65m by 6.21%. these result imply that road construction causes destruction of forests. Since there are limitations such as errors due to researcher, it is necessary to construct a quantitative analysis method for the change of the deforest area. It is need to study the method of extracting individual tree in deforest area more accurately using high-resolution image of GSD 10cm or more as well. This study can be used as a basic data for the ecological restoration of the deforest area considering characteristics of individual tree such as height, diameter at breast height, and biomass.

Relation Analysis Between REITs and Construction Business, Real Estate Business, and Stock Market (리츠와 건설경기, 부동산경기, 주식시장과의 관계 분석)

  • Lee, Chi-Joo;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.41-52
    • /
    • 2010
  • Even though REITs (Real Estate Investment Trusts) are listed on the stock market, REITs have characteristics that allow them to invest in real estate and financing for real estate development. Therefore REITs is related with stock market and construction business and real estate business. Using time-series analysis, this study analyzed REITs in relation to construction businesses, real estate businesses, and the stock market, and derived influence factor of REITs. We used the VAR (vector auto-regression) and the VECM (vector error correction model) for the time-series analysis. This study classified three steps in the analysis. First, we performed the time-series analysis between REITs and construction KOSPI(The Korea composite stock price index) and the result showed that construction KOSPI influenced REITs. Second, we analyzed the relationship between REITs and construction commencement area of the coincident construction composite index, office index and housing price index in real estate business indexes. REITs and the housing price index influence each other, although there is no causal relationship between them. Third, we analyzed the relationship between REITs and the construction permit area of the leading construction composite index. The construction permit area is influenced by REITs, although there is no causal relationship between these two indexes, REITs influenced the stock market and housing price indexes and the construction permit area of the leading composite index in construction businesses, but exerted a relatively small influence in construction starts coincident with the composite office indexes in this study.

Collaborative Relationship Analysis between Members of Apartment Construction Organizations

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.102-109
    • /
    • 2014
  • The purpose of this study is to analyze collaborative relationship between members of a building construction organization. For the analysis of collaborative relationship, this researcher collected data by conducting a questionnaire survey with members of three large building construction organizations for apartment housing. The analyzed contents of collaborative relationship were the 'frequency of communication between organizational members' and their 'reliability'. According to the analysis of communication network, construction managers had low frequency of communication, whereas those responsible for each area, like construction deputy managers, had high frequency of communication. It indicates that middle managers are at the center of communication related to construction work in construction organizations. According to the analysis of reliability network, construction managers showed highest reliability, and employees at the top level in an organizational map also showed high reliability. Since they generally have a lot of experience, are some older of age, and assume responsibility for work, they are considered to receive reliability from other organizational members. This study proved that it was possible to numerically express reliability of organizational members, which is an abstract concept, and analyze it. Therefore, it is expected that the analysis result will highly be likely to be used in the area of construction management.