• Title/Summary/Keyword: Constructability

검색결과 354건 처리시간 0.021초

시공성이 개선된 석재 외장재 앵커공법 개발 (Development of Stone Curtain Wall Anchor Method for the Constructability Improvement)

  • 박남욱;김종성;김성호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2014
  • Stone is one of the oldest and most popular materials used on the external wall because of its durability, abundance and aesthetic effect. However, there are two main problems in the existing pin hole construction method. One is uniformity of construction quality, and the other is a repair work of stone panels. Therefore, a new method is needed to overcome these problems. This paper presents a new stone curtain wall system using under cut anchor and secondary holes that was developed by authors. The improved quality and reduction of construction period can be obtained by this system.

  • PDF

그린 프레임 볼트방식 접합형태 비교 기초연구 (A Basic study of Bolt-type Connection Form of Green Frame)

  • 김근호;임채연;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.337-338
    • /
    • 2012
  • As a rahmen structure, the connection among columns of Green frame is divided into three types such as sleeve, coupler (column pre and post installation), and bolt. The bolt type consists of six types according to steel frame shape and each type has different constructability, safety, structural performance, cost, and quality. Therefore, the analysis of comparison among the types is necessary. The objective of this study is to analyze the characteristics according to the shape of six bolt types to select the appropriate connection of Green frame. The results of this study can be used as a basic study for indentifying the characteristics of steel frame on site applying bolt type connection of Green frame. In addition, this study can be applicable to compare and analyze the performance and constructability of six bolt types in detail.

  • PDF

개방형 슬래브를 이용한 지하 역타공법 (Opened Slab Based on Top-Down Method)

  • 전금석;고수진;염경수;임홍철;최린
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.9-12
    • /
    • 2006
  • In recent years, construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. In the case of underground construction, especially, there are many restrictions and difficulties. Shortening of the construction time in construction of underground, we use top-down method in undergroud wall. A open slab has been designed for the purpose of overcoming a weak point of former top-down method. This study based on open slab on the under ground top-down method, to more improve constructability, to introduce the effect and the performance of top-down method.

  • PDF

공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구 (A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses)

  • 이해찬;김진만;이동건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토 (BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service.)

  • 이창희;이정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

국내 건설원전의 기계적철근이음 공법 적용성 분석 (Research on the constructability of mechanical splices in Nuclear Power Plant in Korea)

  • 방창준;이병수;정영환;임상준;박종혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.13-14
    • /
    • 2013
  • Mechanical splices has been applied in nuclear power plant according to ASME(American Society of Mechanical Engineering) and ACI(American Concrete Institute) Code requirements. In particular sleeve with ferrous filler metal splices and cold roll formed parallel threaded splices have been used in domestic nuclear power plants. The objective of this study is to find out the constructability of the mechanical splices which had been used in Korea nuclear job site and to review the technical trends in the near future.

  • PDF

철근공사 작업성 향상을 위한 엇물림 그립 타입의 이음장치 개발 (Development of Staggered Grip Type Coupling for Improving the Workability in Reinforcing Bar)

  • 우종열;홍성욱;양진국;박승환
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.295-297
    • /
    • 2013
  • Reinforcing bar coupling method has a variety of ways including lap-splice method. However, there are problems that need to be improved in terms of constructability, economics analysis. We should be improved about the problems of the existing methods. Accordingly, this study were developed a new type of staggered grip type reinforcing bar coupling. The proposed method show the following effects than existing methods. First, this method can be reduce time through improved workability. Second, increasing safety through the slip removal. Third, improving economic efficiency by reduce the manufacturing costs.

  • PDF

프리캐스트 아치구조의 이음부 구조 거동 평가 (Evaluation of Structural Behavior of Connections in Precast Arch Structures)

  • 심창수;김동찬;최대헌;진경석
    • 대한토목학회논문집
    • /
    • 제36권5호
    • /
    • pp.747-756
    • /
    • 2016
  • 이 논문에서는 프리캐스트로 제작된 아치 구조의 연결을 위한 루프 이음 상세를 제안하였다. 설계기준에서 제시하고 있는 루프 이음 상세의 요구사항을 만족하는 경우와 시공성을 개선하기 위한 상세 대안들에 대한 평가를 위한 실험적 연구를 수행하였다. 설계 요구사항을 만족하는 경우에는 프리캐스트 아치 실험체가 현장타설 일체형 부재에 비해서 높은 내하력을 나타내었다. 아치구조의 크라운 부위에서의 균열은 초기 균열 발생 이후 증가되는 압축력 효과로 인해서 0.2 mm를 초과하지 않는 균열폭이 발생하였다. 초기 균열 제어에 노치부의 와이어메쉬 보강이 효과를 보였고 철근 커플러와 확대머리철근을 이용한 연결부 상세도 기준 부재 이상의 내하력을 나타내었다. 시공성 개선 상세의 경우 구조적 거동에 차이를 보이지 않아서 작업자의 배근 시공성을 개선할 수 있을 것으로 판단된다. 루프철근의 내면 반지름과 겹침 이음 길이는 현재의 설계기준의 요구사항을 만족시키지 않으면 균열폭 제어 측면에서 좋지 않은 결과를 나타내었다.

계단실 공사를 위한 PC Double Wall 공법 개발 (Development of PC Double Wall for Staircase Construction)

  • 서정일;박홍근;황현종;임주혁;김용남
    • 한국건축시공학회지
    • /
    • 제14권6호
    • /
    • pp.571-581
    • /
    • 2014
  • 본 연구에서는 중공 PC 벽체 (PC Double Wall)를 적용한 계단실 공법을 개발하였다. 중공 PC 벽체는 내부 중공으로 인하여 양중 무게를 줄이고 외부 벽체가 거푸집 역할을 하며, 벽체 내부 중공에 현장 콘크리트를 타설하여 기존 PC 벽체와 비교하여 부재간의 일체성 확보가 우수하다. PC Double Wall 제작 및 현장 콘크리트 타설, 구조적 안전성을 고려하여 PC 벽체 단면과 철근 배근 상세를 제안하였다. 제안 상세를 바탕으로 얇은 PC벽체와 중공부를 효과적으로 형성하기 위한 세움 타설 방식의 거푸집 시스템을 개발하였다. PC Double Wall을 이용하여 계단실 Mock-up test를 통하여 부재 간 일체성과 시공성을 검증하였으며, 부재 간 접합부의 변형 및 균열이 발생하지 않고 시공성이 우수한 것으로 나타났다.