• 제목/요약/키워드: Condition of Contract

검색결과 143건 처리시간 0.032초

건설공사 현장 안전관리 인적 체계 효율성 개선에 관한 연구 (A Study on Efficiency Improvement of the Safety Management Personnel System in Construction Site)

  • 유희재
    • 대한안전경영과학회지
    • /
    • 제20권1호
    • /
    • pp.11-21
    • /
    • 2018
  • Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's worker due to vertical integration, which is characteristic of the construction industry, together to the contractor, the safety management system is based on a safety construction system in which a worker who has a certain qualification condition such as career experience of the work type, work understanding of the work type, and management experience of the work type among the subcontractor, when we manage based on mutual personality which is the personality of interpersonal relationship that can communicate with each other by work type, process and grouping, it is concluded that effective and practical safety management can be achieved to reduce the accident rate and loss cost.

CM기업 현장운영 리스크 관리 실태 분석을 통한 효율적 관리 방안 제시 (Assessment of Risk Management Practices of CM Enterprise: The Need for an Enterprise-level Risk Management Framework)

  • 박경모;이현우;김창덕
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.66-73
    • /
    • 2014
  • 2008년 세계경제 금융위기 발생 이후 건설 수주물량이 감소되었고, 건설사업관리 (Construction Management) 업체들의 무리한 저가 수주로 인해 업체 경쟁력은 저하되었다. 이로 인해 CM기업들은 리스크 관리 대처능력 저하 등 여러 가지 문제점들이 발생되었다. 시공학적인 측면에서는 리스크 관리에 대한 연구는 지속되고 있지만 CM분야에 대한 리스크 연구는 매우 드물다. 따라서 본 연구는 국내 CM기업들의 리스크 관리 실태를 조사하여 문제점들을 분석하였으며 분석된 문제점들에 대한 효율적 관리를 위한 리스크 인자 도출 방안 및 리스크 관리 시스템 개발방안에 대한 방향을 제시하였다. 또한 본 연구에서 제안에 대한 실무자들의 설문을 통해 개발방안에 대한 효율성을 검증하였다.

지하철건설에 따른 문화재 보호와 동대문역사시공 보고서(1) (Study on the measurement of blasting vibration response in construction a subway station at East gate of cultural treasure)

  • 최상열;이수복;허진;채수연
    • 기술사
    • /
    • 제17권3호
    • /
    • pp.32-49
    • /
    • 1984
  • The East gate station area is 205M long and 24m deep which is located 13 meter in front of cultural treasure east gate. The area to be excavated by blasting is composed of granite rocks from 10M depth to 25M. Surface earth extends to up 10M depth. This job site has in involves heavy traffic congestion such as over 10,000 cars passing in rush hour where clossing No 1 lint of subway running 3 minitues head way. This east gate station construction is to be executed for the provent of the setting down of underground level and blasting vibration effects to cultural treasure east gate. Therefore, the caltural treasure committee approved this execution subject to the following condition. 1. Subway gelogical foundation and measured natural frequency 2. Execution of water tight wall 3. Sellection and test of damping material for wall and under rail 4. Measurement of monitoring system during the execution 5. Measurement of histogram system The above two projects was carried out by Dr. Kwang team in KAIST and prof, Han in Hanyang University under accadamic study contract. In the blasting work, for the pourpose of reduced vibration and low explosion velocity such as CCR, Kovex slurry. The 2nd, used electrical caps shall be delay cap and M/S caps in multi delay. The 3rd, drilling pattern is bench cut in open cut and applied control blasting in tunnelling and also shall drill anti-vibration holes as line drilling.

  • PDF

철도차량 Software 지적 재산권 분쟁 해결을 위한 Escrow Account 적용 절차에 대한 연구 (Study on Procedure for Escrow Account to Resolve Controversy of Intellectual Property Right of Software for Rolling Stock)

  • 박준형;조치환;강찬용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1479-1485
    • /
    • 2008
  • 본 논문은 철도차량분야에 적용할 소프트웨어 Escrow의 상세 적용 절차에 대하여 논의하고자 한다. 철도차량 발주자는 차량의 소프트웨어 포함 장치에 대한 하자보증 기간(warranty period) 이후의 소프트웨어 변경 및 유지보수성 확보를 위하여 소스코드, 핵심적인 기술 원천정보 등을 요구하고 있다. 한편, 소프트웨어 개발 업체는 소스코드 등이 업체의 지적 재산권에 해당하는 사안이기 때문에 시행청의 요구사항을 만족하기 어려운 실정이다. 그러므로, 주 계약자인 철도차량 제작자는 소프트웨어 개발자와 사용자 간의 다른 입장을 조율하기 위하여, 소프트웨어 Escrow 서비스 제도를 도입해야 할 필요성이 있다. 소프트웨어 Escrow는 소프트웨어 Escrow 패키지(소프트웨어 소스코드, 소프트웨어 개발 툴, 빌드 프로세스, 독점권을 가진 정보, 저작권 등)의 거래 시, Escrow 계약 문서에 대한 서명을 통한 Escrow 계약 조건을 상호 합의한 후 신뢰성 있는 제3의 기관에 관련 기술 자료 등을 예치해 두는 양자 간 상생협력을 위한 제도이다. 본 논문에서는 다음의 Escrow 진행 절차에 대한 상세 내역을 연구하고, 향후 프로젝트 적용 방안을 제안하고자 한다.

  • PDF

축소 확대 노즐의 열전달 해석을 위한 열전달 계수 계산 및 검증 (Comparative Evaluation on the Deriving Method of the Heat Transfer Coefficient of the C-D Nozzle)

  • 노태원;노태성;이형진;이현섭;유필훈
    • 한국추진공학회지
    • /
    • 제26권2호
    • /
    • pp.1-11
    • /
    • 2022
  • 일반적인 축소 확대형 초음속 노즐에 대한 열해석에서 경계조건으로 사용되는 벽면의 열전달 계수는 노즐 전체의 열해석 정확도에 영향을 미친다. 이에 많은 열전달계수 도출 방법이 제안되어 왔으며, 본 연구에서는 각각의 기법들을 실제 실험 조건에서 열전달 계수를 계산하고 비교하고자 하였다. 이를 위해 기 수행된 벽면 등온 노즐의 열전달실험에 대해 이론 기반의 analogy 기법과 반경험식, 유체전산해석을 통해 열전달 계수를 도출하고 실험결과와 비교하였다. 해석 결과는 반경험식들은 전반적으로 다른 방법에 비해 대류 열전달 계수를 과도하게 예측하고, Prandtl-Taylor analogy 기법과 k-ω SST 모델을 적용한 전산해석 결과가 실험결과와 비교적 잘 일치하는 경향성을 보였다.

핵연료 시험용 노내조사시험설비의 설계 현황 (The Design Status of the Irradiation Facility for Fuel Test)

  • 박국남;심봉식;안성호;유성연
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.310-315
    • /
    • 2007
  • The FTL has been developed to be able to irradiate test fuels at the irradiation hole(IR1 hole) by considering its utility and user's irradiation requirements. FTL consists of In-Pile Test Section (IPS) and Out-of-Pile System (OPS). Test condition in IPS such as pressure, temperature and the water quality, can be controlled by OPS. For safety assurance IPS is designed to have dual stainless steel pressure vessel and OPS is composed of main cooling water system, emergency cooling water system, LMP(letdown, make-up, purification) system, etc. FTL Conceptual design was set up in 2001, basic design had completed including a design requirement, basic piping & instrument diagram (P&ID), and the detail design in 2004. In 2005, the development team carried out purchase and manufacture hardware and make a contract for construction work. FTL construction work began on August, 2006 and ended on March, 2007. After FTL development which is expected to be finished by 2008, FTL will be used for the irradiation test of the new PWR-type fuel and can maximize the usage of HANARO.

  • PDF

한국형 포장가속시험시설의 개발현황 (Development Status of Korea Accelerated Loading and Environment Simulator (KALES))

  • 양성철;유태석;엄주용
    • 한국도로학회논문집
    • /
    • 제2권2호
    • /
    • pp.139-148
    • /
    • 2000
  • 외국의 포장가속시험기는 대부분 아스팔트포장의 시험을 주된 목적으로 개발되었다. 그러나, 국내의 고속도로는 콘크리트포장과 아스팔트포장이 거의 같은 연장을 유지하고 있는 실정으로 콘크리트포장의 활용이 예상되어 콘크리트 포장의 시험을 위한 독자적인 포장가속시험시설의 개발이 요구되고 있다. 따라서 한국의 실정에 알맞은 콘크리트/아스팔트포장 '시험용 포장가속 시험시설'을 개발하기 위하여 1997년부터 1999년 동안의 3년간 연구를 수행하였다. 1차 연도에서는 포장가속시험시설을 제작하는데 필요한 기본적인 사양과 기본 시스템 설계에 관한 기초연구가 이루어 졌고, 2$\sim$3차 년도에는 KALES의 전체구조, 하중작용, 현가장치 및 구동장치 등에 대한 상세설계를 수행하였다. 실모델을 제작하기 전단계로 모형시험기를 만들어 시험을 수행하여 작동성 및 하중분배기구 등을 검토하였다. 피로해석 검토결과 제안된 KALES 시스템은 내구성이 있으며 실제차량을 잘 모사할 수 있는 시험기로 판명되었다.

  • PDF

학술지 빅딜판매의 문제점 및 개선 방안 (Analysis and Proposals Concerning Big Deals of Scholarly Journals)

  • 신은자
    • 한국문헌정보학회지
    • /
    • 제41권1호
    • /
    • pp.373-389
    • /
    • 2007
  • 빅딜은 각 출판사가 발행하는 학술지를 패키지로 묶어 일괄 판매하는 것으로 전자학술지 등장 이후 급격히 확산되었다. 이 연구는 국내의 대학 및 연구도서관에서 구독하고 있는 해외학술지 컨소시엄 조건에 관한 데이터를 수집하여 빅딜판매의 조건 및 상황을 분석하였다. 분석결과 과거에 비해 최근의 빅딜판매 조건은 보다 다양해졌고 선택의 폭도 다소 넓어진 것을 확인할 수 있었다. 그렇지만 주요 출판사의 경우에는 여전히 과거 구독분을 그대로 유지할 것을 요구하는 등 전형적인 빅딜판매 조건을 고수하고 있어 이에 대한 보완 및 대체 방안 수립이 시급한 것으로 드러났다. 전자출판물의 보급이 확산되면서 현재 학술출판물 시장도 급격하게 변하고 있는 만큼 향후에는 전통적인 출판방식과 오픈 액세스 출판방식을 결합한 새로운 출판방식이 호응을 얻을 것으로 기대되는 바이다.

IPD 도입을 위한 국내 건설기술자의 인식 분석 (An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD)

  • 송설민;김예상;진상윤;권순욱
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.72-80
    • /
    • 2011
  • 최근 건설 프로젝트의 원활하고 효과적인 사업관리를 위하여 발주방식의 효율화에 대한 관심이 증대하고 있으며, 방대한 양의 정보에 대하여 효과적으로 통합관리를 위한 건물의 생애주기를 고려한 통합적인 계획이 요구된다. 이를 위하여 프로젝트 초기부터 각 분야의 협업이 필수적이나 기존의 발주방식의 경우 설계업체와 시공업체가 분리되어 계약되는 한계가 있다. 최근 미국의 경우 사업관리의 효율성 증대를 위해 Integrated Project Delivery를 제시하였고 관련 프로젝트 수행 사례가 증가하고 있다. 이에 본 연구는 국내의 경우에도 통합적인 프로젝트 관리를 위한 IPD의 도입 필요성이 커짐에 따라 실질적 도입 이전에 IPD의 개념과 원칙을 바탕으로 하여 도출된 핵심가치를 중심으로 건설업종에 종사하는 실무자들의 건설환경에 대한 현황과 인식을 파악하여 IPD의 도입을 위한 제약요인들을 파악하는 것을 목적으로 향후 IPD 관련 연구의 기초자료로 활용될 것으로 기대된다.

병원의 비정규직 실태조사 (A Study on the Actual Condition of Temporary Workers in Hospital)

  • 문영전;안인환;이용균
    • 한국병원경영학회지
    • /
    • 제12권3호
    • /
    • pp.120-144
    • /
    • 2007
  • In 1997, in the course of overcoming economic crisis caused by the shortage of foreign currency there was a significant phenomenon, the irregularization of human labour resources. There was no exception in hospital, either. Most hospitals put a lot of thought to solve the problem about irregular workers. Between employee and employer the problem of irregular workers has been raised as a main topic of all. The objectives of this study were to inspect the actual state of irregular workers and to understand the positive effect of protecting irregular workers, recently established and revised, on the human resources management of hospitals. After enacting irregular labours protection acts there were many opinions that the labour rules of hospitals would be changed.(56.7%). The plan to solve irregular worker's wage issues would he carried out step by step, but some hospitals have not examined the plan yet,(81.9%). Many hospitals had a plan that irregular worker's wage would be actualized in two or three years.(78.3%) The method, to solve the problem of irregular workers arc as follows: 1) the introduction of functional wage system, 2) the convert from automatic rising wage system to annual wage system, 3) the incentive grade system according to management result, 4) lower functional group wage system, 5) non-term contract wage system. From the point of the opening medical market and securing competitive power of hospitals, it is prospected that irregular works would be increased also in future. So to manage irregular workers effectively would be essential in maintain hospital's competitive power and improve medical service. The result, of this study were a, follow: (1) In hospital, the ratio of irregular workers in hospitals was lower than that of all irregular workers in Korea. (2) In hospital, the wage level of irregular workers was higher than that of irregular workers in Korea. (3) In hospital, the social insurance application ratio of irregular workers was higher than that of all workers in Korea. (4) In hospital, there seems to be no appropriate and active measures to improve labour condition of irregular workers, yet. (5) In many hospitals, the policy of irregular workers would be expected to revised for the law standards. In this study the actual conditions and problems of irregular workers were proposed and it was expected to contribute decisions-making in hospital management, especially when using human resources.

  • PDF