• Title/Summary/Keyword: Concurrent operation

Search Result 129, Processing Time 0.04 seconds

Development of a Remotely Operated Vehicle for Investigation the Coastal Sea (근해 조사용 무인잠수정의 개발)

  • Kim, Kyeong-Ki;Choi, Hyeung-Sik;Kang, Hyung-Suk;Jeong, Gu-Rak;Gwon, Kyeong-Yeop
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.32 no.11
    • /
    • pp.997-1002
    • /
    • 2008
  • This paper is mainly concerned with the development of a remotely operated vehicle for investigation of the coastal sea. For this, we have designed and constructed a vehicle entitled KMU-ROV(Korea Maritime University Remotely Operated Vehicle), for purpose of investigation mission under 50(m) of the sea surface. We have designed six independent waterproof actuators and the housing of the controller for underwater operation. For six degree-of-freedom motion, we have analyzed the dynamics of the KMU-ROV and have designed a new composition of six actuators including the driving system. For motion control, we have composed a concurrent velocity control algorithm for controlling the speed of all the actuating motors. The control system for the KMU-ROV is composed of a master DSP controller, DSP controller for the motor control and various sensors. We composed the PID control algorithm and a network system for controlling motors using the CAN communication. The performance of the KMU-ROV was presented by testing the developed control algorithm and control system under the water.

Beacon Color Code Scheduling for the Localization of Multiple Robots (다 개체 로봇의 위치인식을 위한 비컨 컬러 코드 스케줄링)

  • Park, Jae-Hyun;Lee, Jang-Myung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.16 no.5
    • /
    • pp.433-439
    • /
    • 2010
  • This paper proposes a beacon color code scheduling algorithm for the localization of multiple robots in a multi-block workspace. With the developments of intelligent robotics and ubiquitous technology, service robots are applicable for the wide area such as airports and train stations where multiple indoor GPS systems are required for the localization of the mobile robots. Indoor localization schemes using ultrasonic sensors have been widely studied due to its cheap price and high accuracy. However, ultrasonic sensors have some shortages of short transmission range and interferences with other ultrasonic signals. In order to use multiple robots in wide workspace concurrently, it is necessary to resolve the interference problem among the multiple robots in the localization process. This paper proposes an indoor localization system for concurrent multiple robots localization in a wide service area which is divided into multi-block for the reliable sensor operation. The beacon color code scheduling algorithm is developed to avoid the signal interferences and to achieve efficient localization with high accuracy and short sampling time. The performance of the proposed localization system is verified through the simulations and the real experiments.

Stepwise test case generation for embedded s/w (임베디드 소프트웨어 테스트 케이스 단계적 생성)

  • Jang, S.H.;Jang, J.S.;Lee, S.Y.;Ko, B.G.;Choi, K.H.;Park, S.K.;Jung, K.H.;Lee, M.H.
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.603-606
    • /
    • 2004
  • Automatic test case generation for testing an embedded software is considered. Existing tools for test case generation such as finite state machine or mutant test usually adopt top down approach and depend upon graphical transition and decision table, which makes it difficult to find out where the bugs exist. Also it is hard to describe the special features of embedded systems such as concurrent execution of individual components. Most of embedded systems interacts with the real world, receiving signals through sensors or switches and sending output signals to actuators that somehow manipulate the environment. Embedded software controls the entire system based on the logics such as interpreting the sensor inputs and making the actuators to start or stop their intended operation. This study proposes an automatic test case generation procedure that tests the system starting from the control logics of sensors, switches and actuators and then their concurrent execution controls, and finally the entire system operation. Such a stepwise approach makes it easy to generate test cases to tell where the bugs of embedded software exist.

  • PDF

The Impact of the ERP Go-Live Issues on User Satisfaction (ERP 프로젝트에서 사용자만족도에 영향을 미치는 가동(Go-Live)시점 활동특성)

  • Chun, Hong-Mal;Bang, Myung-Ha
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.139-160
    • /
    • 2007
  • Our study focuses on empirical findings of the critical factors which influence the performance of ERP system in business. The study is mainly interested in examining the influence of the characteristics of late process of adopting ERP called "Go-Live" phase with the critical issues like customizing, transformational process of standardization, phased implementation, concurrent operation and use with the current systems on users' ERP satisfaction. The analyses of the data conducted thru moderated regression analysis and subgroup analysis. Using moderated regression analysis, we first examined the effect of moderator variables like customizing, process standardization, sequential use, concurrent use with the current systems. And then, using subgroup analysis is to verify directions of the moderator effects. Having knowledge on the characteristics of ERP Go-Live process can lead to success of ERP system in business. Our results can be beneficial to those organizations who want to adopt and maintain ERP system effectively.

Integrated Structural Design Operation by Process Decomposition and Parallelization (프로세스 분할 병행에 의한 통합 구조설계 운용)

  • Hwang, Jin-Ha;Park, Jong-Hoi
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.1
    • /
    • pp.113-124
    • /
    • 2008
  • Distributed operation of overall structural design process, by which product optimization and process parallelization are simultaneously implemented, is presented in this paper. The database-interacted hybrid method, which selectively takes the accustomed procedure of the conventional method in the framework of the optimal design, is utilized here. The staged application of design constraints reduces the computational burden for large complex optimization problems. Two kinds of numeric and graphic processes are simultaneously implemented by concurrent engineering approach in the distributed environment of PC networks. The former is based on finite element optimization method and the latter is represented by AutoCAD using AutoLISP programming language. Numerical computation and database interaction on servers and graphic works on independent clients are communicated through message passing. The numerical experiments for some steel truss models show the validity and usability of the method. This study has sufficient adaptability and expandability, in that it is based on general methodologies and industry standard platforms.

Optimization for Concurrent Spare Part with Simulation and Multiple Regression (시뮬레이션과 다중 회귀모형을 이용한 동시조달수리부속 최적화)

  • Kim, Kyung-Rok;Yong, Hwa-Young;Kwon, Ki-Sang
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.3
    • /
    • pp.79-88
    • /
    • 2012
  • Recently, the study in efficient operation, maintenance, and equipment-design have been growing rapidly in military industry to meet the required missions. Through out these studies, the importance of Concurrent Spare Parts(CSP) are emphasized. The CSP, which is critical to the operation and maintenance to enhance the availability, is offered together when a equipment is delivered. Despite its significance, th responsibility for determining the range and depth of CSP are done from administrative decision rather than engineering analysis. The purpose of the paper is to optimize the number of CSP per item using simulation and multiple regression. First, the result, as the change of operational availability, was gained from changing the number of change in simulation model. Second, mathematical regression was computed from the input and output data, and the number of CSP was optimized by multiple regression and linear programming; the constraint condition is the cost for optimization. The advantage of this study is to respond with the transition of constraint condition quickly. The cost per item is consistently altered in the development state of equipment. The speed of analysis, that simulation method is continuously performed whenever constraint condition is repeatedly altered, would be down. Therefore, this study is suitable for real development environment. In the future, the study based on the above concept improves the accuracy of optimization by the technical progress of multiple regression.

Additional CSP calculation method considering Human Error (휴먼에러를 고려한 추가 CSP 산정 방안)

  • Baek, Sung-Il;Ha, Yun-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.759-767
    • /
    • 2021
  • Most weapons systems that are Force Integration are expensive equipment that reflects the latest technology, and the operation and maintenance cost is increasing continuously. Factors that efficiently operate and maintain these weapon systems include maintenance plans, economic costs, and repair part requirements. Among them, predicting the repair parts requirements during the life cycle in advance is an important way to increase operation and maintenance cost efficiency and operating availability. The start of requirement analysis for repair parts is a calculation of the CSP (CSP: Concurrent Spare parts, CSP hereafter) that is distributed when the weapon system is deployed. The CSP is an essential component of achieving the operating availability during this period because the weapon system aims to successfully perform a given operation mission without resupply for an initial set period. In the present study, the CSP calculation method was analyzed, reflecting the failure rate and operating time of items, but the analyzed CSP was aimed at preparing for technical failure, but in the initial operating environment, it is limited in coping with unexpected failures caused by human error. The failure is not included in the scope of free maintenance and is a serious factor in making the weapon system inoperable during the initial operation period. To prevent the inoperable status of a weapon system, CSP that considers human error is required in the initial operating environment, and the calculation criteria and measures are proposed.

Distributed Operation of Structural Design Process (구조 설계 프로세스의 분산운용)

  • Hwang Jin-Ha;Park Jong-Hoi;Kim Kyung-Ill
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.663-671
    • /
    • 2005
  • Distributed operation of overall structural design process, by which product and process optimization are implemented, is presented in this paper. The database-interconnected multilevel hybrid method, in which the conventional design method and the optimal design approach are combined, is utilized there. The method selectively takes the accustomed procedure of the conventional method in the conceptional framework of the optimal design. Design conditions are divided into primary and secondary criteria This staged application of design conditions reduces the computational burden for large complex optimization problems. Two kinds of numeric and graphic processes, are simultaneously implemented on the basis of concurrent engineering concepts in the distributed environment of PC networks. Numerical computation on server and graphic works on independent client are communicated through message passing. Numerical design is based on the optimization methodology and the drawing process is carried out by AutoCAD using the AutoLISP programming language. The prototype design experimentation for some steel trusses shows the validity and usability of the method. This study has sufficient adaptability and expandability in methodology, in that it is based on general theory and industry standard systems.

  • PDF

Evaluation of Rapid filtration System with Particle Size Distribution and Turbidity in Different Effective Sizes

  • Park, J.A.;Eo, S.M.;Shin, J.S.;Kim, M.H.;Yu, M.J.;Chung, S.H.
    • Proceedings of the Korean Environmental Health Society Conference
    • /
    • 2005.06a
    • /
    • pp.381-385
    • /
    • 2005
  • Characterization of particle behavior is becoming more important in performance evaluation of water treatment system as well as in operation of the system because conventional parameter, turbidity has lack of explaining ability on small sized microorganisms such like Cryptosporidium etc. Accordingly, particle counter has been introduced in evaluation and operation of the treatment system. However researches on the relationship between turbidity, particle count and/or different sand/anthracite sizes have not been concurrent. Therefore in this study, the relationship was investigated to improve performance evaluation of sand filter so as to help choosing sand/anthracite effective size as a design parameter of water treatment facility. According to the results, too small or too large effective size media filter reached to turbidity limit(0.1 NTU)earlier. However, because shallow sand layer may cause early breakthrough, the depth of sand layer should be provided enough in order to compromise water quality and productivity.

  • PDF

Double Square Patch Antenna with Inductive Bridges for WLAN Dual-Band (인덕티브 브릿지를 가진 WLAN 이중 대역 이중 사각 패치 안테나)

  • Yang, Chan-Woo;Jung, Chang-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2615-2618
    • /
    • 2009
  • Double rectangular patch with 4-bridges is investigated for solution of IEEE 802.11b/g (2.4 GHz) and 802.11a (5.5 GHz). Rectangular patch for 5.5 GHz frequency band is printed on the PCB substrate and connected to another rectangular patch for 2.4 GHz frequency band with 4-bridges to obtain dual band operation in an antenna element. 4-bridges can modify the desired frequency band from its original frequency band by changing its width. Gain of 2.4 GHz patch is 5 dBi and 5.5 GHz patch is 3.7 dBi at ${\theta}=0^{\circ}$.