• 제목/요약/키워드: Concrete Track

검색결과 393건 처리시간 0.029초

프리캐스트 콘크리트 슬래브궤도 기술현황 (Precast concrete slab track - state of the art)

  • 장승엽;양신추;김정일;김태욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.104-110
    • /
    • 2003
  • Precast concrete slab track has been already turned out to be more efficient than cast-in place concrete slab track in view of the easiness of construction and the quality control of concrete. Thus, there is a great need to bring in the precast slab track system. In order to develop the realistic precast slab track system that is well conformed to our circumstances, the performance criteria of slab track, and the state-of-the art of precast slab track systems that are used in other countries are briefly discussed here.

  • PDF

슬래브궤도의 구조안전성 평가 (Evaluating of Structural Safety of Slab Track)

  • 강윤석;양신추;이영제
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.431-438
    • /
    • 2000
  • In recent years. the destructive force acting on the ballasted track is on the increase with the speed-up of trains and the number of trains, requiring more labor and expenditure to maintain the track in goof condition. Slab track has been developed to decrease the track maintenance work on earthworks. One type of slab track Rheda has Prefabricated track grid, consisting of rails. Prestressed concrete sleepers and reinforcement rods are aligned into position. and then concrete is then placed to integrate the sleepers into a reinforced concrete track slab. In this paper, a new analysis model for the system analysis of the slab track is presented. Then the analysis results are compared with requirements for slab track.

  • PDF

Influence of shear bolt connections on modular precast steel-concrete composites for track support structures

  • Mirza, Olivia;Kaewunruen, Sakdirat
    • Steel and Composite Structures
    • /
    • 제27권5호
    • /
    • pp.647-659
    • /
    • 2018
  • Through extensive research, there exist a new type of connection between railway bridge girders and steel-concrete composite panels. In addition to conventional shear connectors, newly developed blind bolts have been recently adopted for retrofitting. However, the body of knowledge on their influence and application to railway structures has not been thoroughly investigated. This study has thus placed a particular emphasis on the application of blind bolts on the Sydney Harbour Bridge as a feasible alternative constituent of railway track upgrading. Finite element modeling has been used to simulate the behaviours of the precast steel-concrete panels with common types of bolt connection using commercially available package, ABAQUS. The steel-concrete composite track slabs have been designed in accordance with Australian Standards AS5100. These precast steel-concrete panels are then numerically retrofitted by three types of most practical bold connections: head studded shear connector, Ajax blind bolt and Lindapter hollow bolt. The influences of bolt connections on load and stress transfers and structural behaviour of the composite track slabs are highlighted in this paper. The numerical results exhibit that all three bolts can distribute stresses effectively and can be installed on the bridge girder. However, it is also found that Lindapter hollow bolts are superior in minimising structural responses of the composite track slabs to train loading.

Bond-slip constitutive model of concrete to cement-asphalt mortar interface for slab track structure

  • Su, Miao;Dai, Gonglian;Peng, Hui
    • Structural Engineering and Mechanics
    • /
    • 제74권5호
    • /
    • pp.589-600
    • /
    • 2020
  • The bonding interface of the concrete slab track and cement-asphalt mortar layer plays an important role in transferring load and restraining the track slab's deformation for slab track structures without concrete bollards in high-speed railway. However, the interfacial bond-slip behavior is seldom considered in the structural analysis; no credible constitutive model has been presented until now. Elaborating the field tests of concrete to cement-asphalt mortar interface subjected to longitudinal and transverse shear loads, this paper revealed its bond capacity and failure characteristics. Interfacial fractures all happen on the contact surface of the concrete track slab and mortar-layer in the experiments. Aiming at this failure mechanism, an interfacial mechanical model that employed the bilinear local bond-slip law was established. Then, the interfacial shear stresses of different loading stages and the load-displacement response were derived. By ensuring that the theoretical load-displacement curve is consistent with the experiment result, an interfacial bond-slip constitutive model including its the corresponding parameters was proposed in this paper. Additionally, a finite element model was used to validate this constitutive model further. The constitutive model presented in this paper can be used to describe the real interfacial bonding effect of slab track structures with similar materials under shear loads.

고속철도 콘크리트궤도-자갈도상궤도 완충구간의 뜬침목 발생 현상과 대책 (Unsupported Sleepers in Transition Zone between Concrete Slab Track and Ballasted Track : Phenomena and Its Countermeasures)

  • 장승엽;임오진;양신추
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1126-1131
    • /
    • 2007
  • In 1st Phase Kyeong-Bu High-Speed Line, to lessen the impact in the transition zone between concrete slab track(in tunnel) and ballasted track(on embankment), the ballast bonding method has been adopted. However, in this area, in the beginning of the operation, unsupported sleepers are found, and the track deterioration and damage of concrete sleepers have occurred. In this paper, the status and causes of unsupported sleepers are discussed and several repair measures are proposed.

  • PDF

콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구 (A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track)

  • 김민석;이상혁;권재욱;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF

피로효과를 고려한 레일패드 스프링계수 변화에 따른 콘크리트 슬래브 궤도의 거동분석 (A Behavior Analysis of HSR concrete slab track under Variety of Rail pad stiffness on fatigue effect)

  • 엄맥;최정열;천대성;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.340-350
    • /
    • 2007
  • The major objective of this study is to investigate the fatigue effects of rail pad on High Speed Railway with concrete slab track system. It analyzed the mechanical behaviors of HSR concrete slab track with applying rail pad stiffness based on fatigue effect(hardening and increasing stiffness) on the 3-dimensional FE analysis and laboratory test for static & dynamic characteristics. As a result, the hardening of rail pad due to fatigue loading condition are negative effect for the static & dynamic response of concrete slab track which is before act on fatigue effect. The analytical and experimental study are carried out to investigate rail pad on fatigue effected increase vertical acceleration and stress and decrease suitable deflection on slab track. And rail pad based on fatigue effect induced dynamic maximum stresses, the increase of damage of slab track is predicted by adopting fatigue effected rail pad. after due consideration The servicing HSR concrete slab track with resilient track system has need of the reasonable determination after due consideration fatigue effect of rail pad stiffness which could be reducing the effect of static and dynamic behavior that degradation phenomenon of structure by an unusual response characteristic and a drop durability.

  • PDF

Shear anchor behavior and design of an embedded concrete rack rail track for mountain trains

  • Hyeoung-Deok Lee;Jong-Keol Song;Tae Sup Yun;Seungjun Kim;Jiho Moon
    • Computers and Concrete
    • /
    • 제33권4호
    • /
    • pp.373-384
    • /
    • 2024
  • In this study, a novel mountain train system was developed that can run along a steep gradient of 180 ‰ and sharp curve with a minimum radius of 10 m. For this novel mountain train, an embedded precast concrete rack rail track was implemented to share the track with an automobile road and increase constructability in mountainous regions. The embedded rack rail track is connected to a hydraulically stabilized base (HSB) layer with shear anchors, which must have sufficient longitudinal resistance because they bear most of the traction forces originated from the rack rail and longitudinal loads owing to the steep gradient. In addition, the damage to the shear anchor parts, including the surrounding concrete, must be strictly limited under the service load because the maintenance of shear anchors inside the track is extremely difficult after installation. In this study, the focus was made on the shear anchor behavior and design an embedded rack rail track, considering the serviceability and ultimate limit states. Accordingly, the design loads for mountain trains were established, and the serviceability criteria of the anchor were proposed. Subsequently, the resistance and damage of the shear anchors were evaluated and analyzed based on the results of several finite element analyses. Finally, the design method of the shear anchors for the embedded rack rail track was established and verified.

고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구 (Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway)

  • 최찬용;정재현
    • 한국산학기술학회논문지
    • /
    • 제19권4호
    • /
    • pp.8-16
    • /
    • 2018
  • 본 논문의 목적은 고속철도 콘크리트 궤도 및 노반 측정 데이터(노반압력, 진동가속도, 탄성변위 등)를 이용하여 토공노반의 장기거동을 분석하고 궤도 노반의 장기성능을 평가하고자 하는데 있다. 최근 고속철도 궤도 형식이 콘크리트 슬래브로 채택되고 있다. 그러나 콘크리트 궤도는 노반 침하에 취약하다. 자갈궤도의 경우 노반이 침하되어도 유지보수로 원상복구가 용이하다. 반면에 콘크리트 궤도의 경우 노반의 과도한 침하가 발생하면 도상 및 침목에 균열이 지속적으로 발생되고 사용성이 크게 저하된다. 이와 같은 이유로 부분보수만으로 원상복구가 어렵다. 본 논문에서는 운영 중 콘크리트 궤도에 대하여 건설 초부터 매설된 센서의 측정 데이터를 개통 후 약 3년까지 모니터링하여 장기성능평가를 수행하였다. 성능평가 방법은 열차별 궤도 토공노반 및 장기 궤도 노반 성능평가, 장기침하에 따른 궤도 노반 성능 영향 분석 및 장기 침하 영향인자 분석 등이다. 열차별 궤도 노반 성능평가에서는 KTX-산천중련의 노반응답이 가장 컸다. 장기 궤도 노반 성능평가 결과는 측정항목이 기준치이내로 측정되었다. 장기침하에 따른 궤도 노반 성능영향 평가는 TCL처짐은 침하와 깊은 연관이 있는 것으로 분석되었다. 장기침하의 외부영향인자 분석을 통해 함수비와 지하수위의 영향성을 확인하였다. 이와같은 방법을 통해 궤도상 토공노반의 안정성을 확보할 수 있을 것으로 사료된다.

콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구 (The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track)

  • 성덕룡;김영하;박용걸;김성일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF