• Title/Summary/Keyword: Comprehensive flood management

Search Result 37, Processing Time 0.022 seconds

Hydrological observation system deployment for water Water quantity, quality management (수자원 수량, 수질관리를 위한 수문관측시스템 구축방안)

  • Yu, Se-hwan;Jang, Dong-bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.10a
    • /
    • pp.882-885
    • /
    • 2014
  • The duration and frequency of flooding and not last long, by the time climate change drought. The increased accordingly by reducing stream flow and year variation. This trend is expected to continue, and change towards a comprehensive analysis of such quantity, quality and management of water resources are managed. Flood warning system is called to perform them electronically to the management of water resources such as these to be in the organic water-related basic data acquisition, storage, processing and utilization. Can be divided into hydrological observations and flood warning systems alert system broadcast system. Hydrological observation system is the measurement from the hydrological stations (water level, rainfall, water) that can be observed hydrological status of the dam basin hydrological observation data transmitted to the central office, located at the dam monitoring and control system through a variety of networks including satellite, and the collected defined as the system that sent the K-water head office in 1 minute increments hydrological observation data. Headquartered in support of this decision. Dimensions of the dam are provided in addition to inward. Channeled through various hydrologic analysis and leveraging the data transfer. This paper looks at ways to build out hydrological observation system.

  • PDF

A Study on the Activation·Specification of 119 Rescue & Care in JeJu (제주도 119구조·구급대의 활성화 및 전문화 방안)

  • Koh, Jae-Moon;Kim, Tae-Min;Kim, Hyo-Sik;Lee, Young-A
    • The Korean Journal of Emergency Medical Services
    • /
    • v.6 no.1
    • /
    • pp.153-168
    • /
    • 2002
  • Since 1992, conventional fire fighting businesses have been converted into a metropolitan autonomous fire fighting system to be ready for a variety of disasters. However, the corresponding investment has been overlapped due to the non-integration of businesses to prevent any potential disasters, and a series of collaborative systems have been not functioning so well. In the meantime, our fire fighting sector has been trying to set up its own clean and faithful position by abolishing any inconvenient system or outsourcing private sectors, and expanded its work scope from conventional fire fighting even to rescue and emergency works. While focusing on handling disaster, the fire fighting sector has been widely trusted and reliable throughtout our nation. Moreover, our fire fighting sector has secured nation wide mobile organizations, technical personnel by field, special equipments and independent communication network. In addition, the fire fighting sector has knowledges, expertise and capabilities required for managing disasters, while in charge of almost every disaster management works including fire, explosion, collapse, disaster and flood. It becomes an organization for comprehensive disaster management under an absolute national trust, which is based on the system for prevention, preparation and countermeasure against a variety of disasters. Thus, our fire fighting sector must make many efforts and try to modernize conventional education and training. The ways to facilitate rescue and emergency works may include the nurture of technical fire fighting personnel along with modernized equipments, the reinforcement of rescue and emergency education, the facilitation of operating civil defense corps, the facilitation of operating volunteer fire fighting corps, the better arrangement of 119 briefing room for public healthcare in provincial offices, the sterilization of rescue instruments and equipments the better repair education for emergency rescue member, the establishment of regional emergency assistant system and the expansion of fire fighting personnel and equipments. In terms of reinforcing the functions and services of rescue 119 and emergency corps, we must review the following considerations: Building up security system along with operational expansion, building up a system for emergency medical treatment, building up a comprehensive information management system for rescue and emergency, constructing a provincial safety museum and so forth. For the ways to better the works of rescue 119 we can review the following considerations : Improving the education for fire fighting training corps under Jeju Provincial Fire and Disaster Management Department, providing rescue members with more opportunities for clinical practices, enhancing the morale of rescue members, installing a comprehensive briefing room for emergency rescue members, building up medical networks along with reasonable policies for information service, operating the consulting system for rescue 119 and so on. If these requirements are met, it is expected that the fire fighting departments in Jeju province can cope with every accident and disaster a little more rapidly and quickly in compliance with local needs, so that they can keep their own position as a public fire fighting organization which may be trusted by the public.

  • PDF

EU Water Framework Directive-River Basin Management Planning in Ireland

  • Earle, R.;Almeida, G.
    • Environmental Engineering Research
    • /
    • v.15 no.2
    • /
    • pp.105-109
    • /
    • 2010
  • The European Union (EU) Water Framework Directive (WFD) (2000/60/EC) was transposed into Irish law by Statutory Instrument Nos. 722 of 2003, 413 of 2005 and 218 of 2009, which set out a new strategy and process to protect and enhance Ireland's water resources and water-dependent ecosystems. The Directive requires a novel, holistic, integrated, and iterative process to address Ireland's natural waters based on a series of six-year planning cycles. Key success factors in implementing the Directive include an in-depth and balanced treatment of the ecological, economic, institutional and cultural aspects of river basin management planning. Introducing this visionary discipline for the management of sustainable water resources requires a solemn commitment to a new mindset and an overarching monitoring and management regime which hitherto has never been attempted in Ireland. The WFD must be implemented in conjunction with a myriad of complimentary directives and associated legislation, addressing such key related topics as flood/drought management, biodiversity protection, land use planning, and water/wastewater and diffuse pollution engineering and regulation. The critical steps identified for river basin management planning under the WFD include: 1) characterization and classification of water bodies (i.e., how healthy are Irish waters?), 2) definition of significant water pressures (e.g., agriculture, forestry, septic tanks), 3) enhancement of measures for designated protected areas, 4) establishment of objectives for all surface and ground waters, and 5) integrating these critical steps into a comprehensive and coherent river basin management plan and associated programme of measures. A parallel WFD implementation programme critically depends on an effective environmental management system (EMS) approach with a plan-do-check-act cycle applied to each of the evolving six-year plans. The proactive involvement of stakeholders and the general public is a key element of this EMS approach.

Significance and Future Direction for Designation and Management of Landslide-Prone Zones (산사태 취약지역 지정·관리 제도의 의의와 향후 과제)

  • Kim, Suk Woo;Chun, Kun Woo;Kim, Kyoung Nam;Kim, Min Sik;Kim, Min Seok;Lee, Sang Ho;Seo, Jung Il
    • Journal of Forest and Environmental Science
    • /
    • v.29 no.3
    • /
    • pp.237-248
    • /
    • 2013
  • The legal basis for the systematic prevention and response to landslide hazards, and the rehabilitation of landslide-hit areas, was established through the amendment of the Forest Protection Act in August 2012. The most noticeable amendment to the Act is the inclusion of clauses associated with the designation and management of landslide-prone zones (including debris flow-prone zones). In this paper, we (1) introduce the clauses related to the designation and management of landslide-prone zones that were included in the amended Forest Protection Act, (2) examine their significance by reviewing the present status of related domestic laws and structural countermeasures such as sediment check dams for sediment-related disaster prevention, and (3) suggest the future directions of the procedure for the designation and cancellation of such zones, and their maintenance and institutional aspects. The establishment of an institutional device for the designation and management of landslide-prone zones has great significance in the aspect of (1) the establishment of a comprehensive management and prevention system for potential landslide-prone zones in forested areas where the hazard risk has been poorly recognized as compared with the flood risks in lowlands, and (2) the establishment of the basis for overcoming the limits of structural countermeasures according to limited budgets. To develop the designation and management system for landslide-prone zones, not only must present problems be addressed, but a cooperation system between the administration and local residents must also be established.

Comparing Water Management Categories of Green Building Rating Systems for Development of Evaluation Criteria of Watersheds (유역 평가 기준 개발을 위한 그린빌딩 평가 시스템의 물관리 관련 항목 비교 연구)

  • Idrees, Muhammad Bilal;Lee, Jin-Young;Ahn, Jae-Hyun;Kim, Tae-Woong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.1013-1020
    • /
    • 2018
  • With the rapid industrialization and increase in population, more and more people are moving to live in cities. This urbanization trend is resulting in increased construction and development activities which associates with escalation of impervious surface. This in turn causes problems like groundwater depletion, higher flood peaks, and increased rate of soil loss from the watershed. Watershed management projects are being implemented around the globe concerning with the application of soil and water resources conservation practices. It is desirable that an entire watershed be evaluated based on soil and water conservation practices applied. In this study, water management categories of green building rating systems (GBRS) of South Korea, Taiwan, and the Philippines were discussed. The water management practices rating criteria of G-SEED (South Korea), BERDE (Philippines), and EEWH (Taiwan) were explored and compared. The insights of this study are expected to be projected to establish a comprehensive rating system for the evaluation of watersheds. The quantification of watershed management practices will help future planners to identify areas of potential water-related risks and counter the hazards more effectively.

Evaluation of SWMM Snow-melt Module to Secure Bi-Modal Tram Operation (바이모달 트램 운행 안전성 확보를 위한 SWMM 융설 모듈 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.441-448
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the show pack melt/freezing due to unexpected snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snow-fall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for know removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system prediction.

Evaluation of hydropower dam water supply capacity (I): individual and integrated operation of hydropower dams in Bukhan river (발전용댐 이수능력 평가 연구(I): 북한강수계 개별 댐 및 댐군 용수공급능력 분석)

  • Jeong, Gimoon;Choi, Jeongwook;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.505-513
    • /
    • 2022
  • Recently, uncertainty in predicting available water resources is gradually increasing due to climate change and extreme weather conditions. Social interest in water management such as flood and drought prevention is also increasing, and after the unification of water management implemented in 2018, domestic water management is facing a major turning point. As part of such strengthening of water management capabilities, various studies are being conducted to utilize a hydropower dam for flood control and water supply purposes, which was mainly operated for hydroelectric power generation. However, since the dam evaluation methods developed based on a multi-purpose dam are being applied to hydropower dams, an additional evaluation approach that can consider the characteristics of hydropower dams is required. In this study, a new water supply capacity evaluation method is presented in consideration of the operational characteristics of hydropower dams in terms of water supply, and a connected reservoir simulation method is proposed to evaluate the comprehensive water supply capacity of a dam group operating in a river basin. The presented method was applied to the hydropower dams located in the Bukhan River basin, and the results of the water supply yield of individual dams and multi-reservoir systems were compared and analyzed. In the future, the role of hydropower dams for water supply during drought is expected to become more important, and this study can be used for sustainable domestic water management research using hydropower dams.

Data Quality Assessment and Improvement for Water Level Prediction of the Han River (한강 수위 예측을 위한 데이터 품질 진단 및 개선)

  • Ji-Hyun Choi;Jin-Yeop Kang;Hyun Ahn
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.1
    • /
    • pp.133-138
    • /
    • 2023
  • As a side effect of recent rapid climate change and global warming, the frequency and scale of flood disasters are increasing worldwide. In Korea, the water level of the Han River is a major management target for preventing flood disasters in Seoul, the capital of Korea. In this paper, to improve the water level prediction of the Han River based on machine learning, we perform a comprehensive assessment of the quality of related dataset and propose data preprocessing methods to improve it. Specifically, we improve the dataset in terms of completeness, validity, and accuracy through missing value processing and cross-correlation analysis. In addition, we conduct a performance evaluation using random forest and LightGBM to analyze the effect of the proposed data improvement method on the water level prediction performance of the Han River.

Development and assessment of water management resilience of mid-small scale tributaries (지류 중소하천의 물관리 탄력성 평가지수 개발 및 평가)

  • Park, Jung Eun;Lee, Eul Rae;Lim, Kwang Suop
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.2
    • /
    • pp.95-106
    • /
    • 2016
  • Water Management Resilience Index (WMRI) was developed as a policy measure of adaptability to withstand water stresses and to set up water management strategies mainly in mid-small scale tributaries, and then evaluated on 117 sub-basins in South Korea. The index consists of 3 sub-indices such as vulnerability, robustness and redundancy sub-indices, each including indicators of 3 sectors: water use, flood mitigation, and river environment. Total number of indicators selected for the index was 31. Taking into account the stream order and control capability of river flow discharge, sub-basins were categorized into 3: 1 for mainstreams of lower large dams, 2 and 3 for tributaries, respectively without and with flow discharge regulation. As a result of the evaluation, resilience index scores in Category 2 and 3 are much lower than that of Category 1, especially with very poor score of redundancy. Although there was no significant difference between mainstream and tributaries in vulnerability and robustness sub-indices, results of redundancy sub-index in tributaries were lower than those in mainstream. Thus, it is conceived that the variety of water management schemes should be considered to improve their resilience in the face of future uncertainty. Addressing comprehensive stability of river basin against internal and external impacts, WMRI in this study can also be used for the prioritization of water management plans.

Analysis of the Runoff Characteristics of Small Mountain Basins Using Rainfall-Runoff Model_Danyang1gyo in Chungbuk (강우-유출모형을 활용한 소규모 산지 유역의 유출특성 분석_충북 단양1교)

  • Hyungjoon Chang;Hojin Lee;Kisoon Park;Seonggoo Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.31-38
    • /
    • 2023
  • In this study, runoff characteristics analysis was conducted as a basic research to establish a forecasting and warning system for flood risk areas in small mountainous basins in South Korea. The Danyang 1 Bridge basin located in Danyang-gun, Chungcheongbuk-do was selected as the study basin, and the watershed characteristic factors were calculated using Q-GIS based on the digital elevation model (DEM) of the basin. In addition, nine heavy rainfall events were selected from 2020 to 2023 using hydrometeorological data provided by the National Water Resources Management Comprehensive Information System. HEC-HMS rainfall-runoff model was used to analyze the runoff characteristics of small mountainous basins, and rainfall-runoff model simulation was performed by reflecting 9 heavy rainfall events and calculated basin characteristic factors. Based on the rainfall-runoff model, parameter optimization was performed for six heavy rain events with large error rates among the simulated events, and the appropriate parameter range for the Danyang 1 Bridge basin, a small mountainous basin, was calculated to be 0.8 to 3.4. The results of this study will be utilized as foundational data for establishing flood forecasting and warning systems in small mountainous basin, and further research will be conducted to derive the range of parameters according to basin characteristics.