• 제목/요약/키워드: Composite precast concrete

검색결과 203건 처리시간 0.024초

세그멘탈 합성보 접합부 전단 모델 시험 (Shear Modeling Tests for Post-Tensioned Composite Segmental Beams)

  • 설동재;김인규;유승룡
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.481-486
    • /
    • 2002
  • A precast concrete beam which is larger than the limits of domestic transportation regulation in weight, length, and volume is divided into three parts, transported separately, and erected with a composite beam by post-tensioning in site. Shear tests are performed on the post-tensioned composite segmental beam models with 1/2 scale. The jacking force and the ratio of area of shear key to beam section are major experimental variables. Nine shear strength are resulted from the tests with two variables. Rational equation for estimation of shear strength are obtained from the regression analysis on test results.

  • PDF

그린 프레임 합성 PC부재의 양중공정 분석 연구 (A Study on the Lifting Progress for Composite Precast Concrete Members of Green Frame)

  • 주진규;김신은;이군재;김선국;이성호
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.34-42
    • /
    • 2012
  • 국내 공동주택의 리모델링 수월성 및 이에 따른 장수명화를 위해 그린 프레임 공법이 개발되었다. 그린 프레임 공법은 합성 프리캐스트 콘크리트 부재를 이용한 라멘구조로 벽식 구조와는 달리 양중 및 설치가 골조공사의 주공정으로 작용한다. 따라서 그린 프레임에 의한 적정 골조공사 공기 산정을 위해서는 체계적인 양중계획이 필요하다. 그러나 양중계획은 그린 프레임을 구성하는 요소인 합성 PC 부재(기둥, 보)의 단위 양중공정에 대한 분석이 선행되어야 한다. 따라서 본 연구는 그린 프레임 합성 PC 부재의 양중공정을 분석하는 것을 목적으로 한다. 이를 위해 합성 PC 기둥과 보의 양중절차와 시간을 도출하고, 그 결과를 사례 프로젝트에 적용하여 기준층의 양중 사이클을 분석한다. 본 연구의 결과는 향후 그린 프레임에 의한 골조공사 양중계획 시 핵심자료로 사용된다.

Racking shear resistance of steel frames with corner connected precast concrete infill panels

  • Hoenderkamp, J.C.D.;Snijder, H.H.;Hofmeyer, H.
    • Steel and Composite Structures
    • /
    • 제19권6호
    • /
    • pp.1403-1419
    • /
    • 2015
  • When precast concrete infill panels are connected to steel frames at discrete locations, interaction at the structural interface is neither complete nor absent. The contribution of precast concrete infill panels to the lateral stiffness and strength of steel frames can be significant depending on the quality, quantity and location of the discrete interface connections. This paper presents preliminary experimental and finite element results of an investigation into the composite behaviour of a square steel frame with a precast concrete infill panel subject to lateral loading. The panel is connected at the corners to the ends of the top and bottom beams. The Frame-to-Panel-Connection, FPC4 between steel beam and concrete panel consists of two parts. A T-section with five achor bars welded to the top of the flange is cast in at the panel corner at a forty five degree angle. The triangularly shaped web of the T-section is reinforced against local buckling with a stiffener plate. The second part consists of a triangular gusset plate which is welded to the beam flange. Two bolts acting in shear connect the gusset plate to the web of the T-section. This way the connection can act in tension or compression. Experimental pull-out tests on individual connections allowed their load deflection characteristics to be established. A full scale experiment was performed on a one-storey one-bay 3 by 3 m infilled frame structure which was horizontally loaded at the top. With the characteristics of the frame-to-panel connections obtained from the experiments on individual connections, finite element analyses were performed on the infilled frame structures taking geometric and material non-linear behaviour of the structural components into account. The finite element model yields reasonably accurate results. This allows the model to be used for further parametric studies.

수직전단보강이 없는 PS 콘크리트와 현장타설 콘크리트 합성보의 전단강도 (Shear Strength of Prestressed PC-CIP Composite Beams without Vertical Shear Reinforcements)

  • 김철구;박홍근;홍건호;강수민;서정일
    • 콘크리트학회논문집
    • /
    • 제26권4호
    • /
    • pp.533-543
    • /
    • 2014
  • 최근 들어, 지하주차장과 같은 모듈화 건물에 프리캐스트 콘크리트와 현장타설 콘크리트가 함께 사용되는 복합공법의 사용이 증가하고 있다. 일반적으로 프리캐스트 콘크리트는 공장에서 선 제작되기 때문에 재료의 효율성을 극대화하기 위해 프리텐션을 도입하여 사용한다. 현행 구조기준이 긴장력이 가해진 단일 단면의 전단 강도식은 제시하지만 긴장력이 가해진 프리캐스트와 현장타설 콘크리트 합성단면의 전단강도식은 제시하지 못하고 있는 실정이다. 따라서 긴장력이 가해진 합성 부재의 전단강도 실험을 통해 긴장력이 전단강도에 미치는 영향과 합성부재의 전단강도 산정시 고려해야할 사항에 대해 알아보았다. 변수로는 콘크리트의 면적비, 긴장재의 긴장력, 전단 경간비, 그리고 전단철근비를 고려하였다. 실험 결과를 분석해보면, 전단강도는 긴장력 크기와 긴장력이 가해진 단면의 면적비가 커질수록 증가하였고 전단경간비가 증가할수록 감소하였다.

Experimental and numerical study on mechanical behavior of RC shear walls with precast steel-concrete composite module in nuclear power plant

  • Haitao Xu;Jinbin Xu;Zhanfa Dong;Zhixin Ding;Mingxin Bai;Xiaodong Du;Dayang Wang
    • Nuclear Engineering and Technology
    • /
    • 제56권6호
    • /
    • pp.2352-2366
    • /
    • 2024
  • Reinforced concrete (RC) shear walls with precast steel-concrete composite modular (PSCCM) are strongly recommended in the structural design of nuclear power plants due to the need for a large number of process pipeline crossings and industrial construction. However, the effect of the PSCCM on the mechanical behavior of the whole RC shear wall is still unknown and has received little attention. In this study, three 1:3 scaled specimens, one traditional shear wall specimen (TW) and two shear wall specimens with the PSCCM (PW1, PW2), were designed and investigated under cyclic loadings. The failure mode, hysteretic curve, energy dissipation, stiffness and strength degradations were then comparatively investigated to reveal the effect of the PSCCM. Furthermore, numerical models of the RC shear wall with different PSCCM distributions were analyzed. The results show that the shear wall with the PSCCM has comparable mechanical properties with the traditional shear wall, which can be further improved by adding reinforced concrete constraints on both sides of the shear wall. The accumulated energy dissipation of the PW2 is higher than that of the TW and PW1 by 98.7 % and 60.0 %. The failure of the shear wall with the PSCCM is mainly concentrated in the reinforced concrete wall below the PSCCM, while the PSCCM maintains an elastic working state as a whole. Shear walls with the PSCCM arranged in the high stress zone will have a higher load-bearing capacity and lateral stiffness, but will suffer a higher risk of failure. The PSCCM in the low stress zone is always in an elastic working state.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

루프 이음 프리캐스트 교량 바닥판의 균열 (Cracking of Precast Bridge Decks with Loop Joints)

  • 류형근;장승필;김영진;김병석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 춘계 학술발표회 제16권1호
    • /
    • pp.750-753
    • /
    • 2004
  • In this paper, experimental test on the full scale model of steel and concrete composite plate girder with prefabricated slabs under hogging moments was conducted cautiously and observed in order to study cracking in precast decks. Details of prefabricated slab transverse joints were determined from previous research. A test specimen was overhanging simple support beam, totally 28 meter length. Through the 4-point flexural test, the behaviour of the composite girder under hogging moments was observed. From the test results, crack development and crack widths were observed.

  • PDF

국내 최장 개구제형 합성형교 시공 (Construction of the longest open toped steel box girder composite bridge in the country)

  • 오현철;마향욱;김인규;김영진;장승균
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.165-166
    • /
    • 2009
  • 이 논문은 프리캐스트 콘크리트 바닥판을 적용한 국내 최장 개구제형 강박스 거더교 시공에 관한 연구이다. 개구제형 강박스 거더 교량은 기존 폐합형 강박스 교량에 비해 강재량을 절감하여 경제적인 설계가 가능하며, 프리캐스트 바닥판을 적용함으로서 교량의 공사기간을 6개월 이상 단축할 수 있다. 본고에서는 국내최장 개구제형 교량인 영덕-오산간 광역화 도로공사 구간의 서천교의 시공사례를 소개하고자 한다.

  • PDF

Experimental study on shear behaviors of Partial Precast Steel Reinforced Concrete beams

  • Yang, Yong;Li, Hui
    • Steel and Composite Structures
    • /
    • 제37권5호
    • /
    • pp.605-620
    • /
    • 2020
  • An innovative Partially Precast Steel Reinforced Concrete (PPSRC) beam is presented in this paper. To study the shear behavior of PPSRC beams, static loading experiments were conducted on 10 specimens, including 4 T-beam specimens and 4 PPSRC inverted T-beam specimens together with 2 PPSRC rectangular section beams. In the tests, the shear behaviors of the PPSRC beams were emphasized. On the basis of the experiments, the failure mode and ultimate bearing capacity were thoroughly examined. The calculation methods for shear capacity are also presented in this paper. The analysis of mechanical behavior and the calculation methods presented can be used as a reference to design these innovative composite PPSRC beams and provide a significant foundation for further research.

상판 조립식 교량 구조 개발에 관한 연구 (A Study on the Fabricated Concrete Deck Bridges)

  • 구민세;정란;김긍환;신동기
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1992년도 봄 학술발표회 논문집
    • /
    • pp.137-142
    • /
    • 1992
  • The purpose of this study is to develop a new structural system for precast deck plate bridge. In order to investigate load distribution and composite effects by connecting diaphragms and precast deck plate to main girder with shear keys, computer analysis with F.E.M S/W package program ADINA was carried out. As results of analysis, the following could be concluded : -The distance between diaphragms with6m is suficient for crossing load distribution effects. -The composite effects by connection deck plate to main girder with shear key is reasonable. -The gap between deck plate and main girder under given load is negligible.

  • PDF