• Title/Summary/Keyword: Composite Slab

Search Result 472, Processing Time 0.019 seconds

On-Site Construction Method for U-Girder with Pre-tension and Verification of Analytical Performance of Anchoring Block (프리텐션 U형 거더 현장 제작 방법 및 정착 블록 해석적 성능 검증)

  • Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.67-77
    • /
    • 2022
  • In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.

Experiments on Flow Characteristics of Asphalt Seal Composite Waterproofing Method for Underground Concrete Structure Exterior Wall Waterproofing (지하 콘크리트 구조물 외벽 방수용 아스팔트 씰재 복합방수 공법의 흘러내림 특성에 관한 실험)

  • Ko, Sang-Ung;Kim, Kyoung-Hoon;Kim, Young-Sam;Shin, Hong-Chul;Kim, Jin-Man
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.4
    • /
    • pp.297-303
    • /
    • 2018
  • With the changing trend of the building construction to high rising and large scaling, the underground structure has been increased, and its usage also increased and variety. Hence, to protect the underground structure against underground water, various water proofing methods has been developed. Among the many water proofing methods, the combined water proofing method using both asphalt seal and sheet has been widely used to secure the sufficient performance and decrease the construction failure. However, during the summer period of extremely high temperature conditions, the asphalt sealing materials were separated and leaked into the structure. Therefore, the aim of the research is to provide the quality standard of asphalt sealing material based on the various temperature changes depending on seasons. According to the experimental results, the temperature of the sealing materials applied on the slab was increased up to $54^{\circ}C$ which was $3^{\circ}C$ higher than the structure temperature of $51^{\circ}C$. Based on the melting test for asphalt sealing materials applied on the outside wall of the structure, in the case of water-dispersing typed materials showed significant melting down due to its slow evaporation and low viscosity. Furthermore, from the accelerated test conducted indoor conditions, a solvent-type and water-dispersing typed materials showed significant melting down due to their low viscosity and melting point in ambient conditions. Based on these results, viscosity and melting point are found as the important factors on asphalt sealing materials' quality, and it is necessary to designate the quantitative level of the viscosity and melting point for quality control.