• Title/Summary/Keyword: Components of Locational Marginal Price

Search Result 4, Processing Time 0.017 seconds

A New Approach to Calculation of the Components of Locational Marginal Price (모선별 한계가격의 구성요소 산정 기법)

  • Lee Ki-Song;Jeong Yun-Won;Shin Joong-Rin;Kim Jin-Ho;Park Jong-Bae
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.8
    • /
    • pp.341-350
    • /
    • 2006
  • This paper presents a new methodology to draw the components of locational marginal price (LMP) in electricity market. Recently, the changing environments surrounding electricity industries resulted in the unbundled services provided by electricity market players, which may require the new pricing mechanisms based on the LMP. The changed pricing mechanisms will provide the price signals of time and location to the market participants. Most of the existing studies of LMP are based on the Lagrangian multipliers as shadow prices to evaluate the equivalent values of constraints or factors for security, reliability and quality. However, the shadow prices cannot provide enough information for components of LMP. In this paper, therefore, we proposed a new approach that LMP is divided into three components. To do this, we first present the method for shadow prices calculation and then break down LMP into a variety of parts corresponding to the concerned factors. The proposed approach is applied to 5-bus and modified IEEE 14-bus sample system in order to verify its validity.

An Analysis of Location Marginal Prices Considering Demand Response Resources (수요반응자원을 고려한 지역별 한계가격 해석기법 연구)

  • Kim, Hyun-Houng;Kim, Jin-Ho;Kim, Hyeong-Jung;Shin, Joong-Rin;Park, Jong-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.25-33
    • /
    • 2008
  • This paper presents a new approach of a evaluation of location marginal prices(LMPs) considering demand response resources in the competitive electricity market. The stabilization of the electric power supply and demand balance has been one of the major important activities in electric power industry. Recently, much attention is paid to the demand-side resources which are responsive to incentives or time-varying prices and existing power system planning and operation activities are incorporated with the so-called demand response resources. In this paper, we first present an analytical method for calculation of LMPs considering demand response resources and then break down the LMPs into three components. In this study, we assume that Korean power system consists of two major regions, one which is the metropolitan and the other is non-metropolitan region. In the case study, we have considered several LMPs cases with different use of locational demand response resource and we can obtain a locational signal to demand response resources. Also, the economics of demand response resources are evaluated, compared with the increase of transmission line capacity and of generation capacity.

Calculation for Components of Locational Marginal Price considering Demand-Side Bidding in a Competitive Electricity Market (경쟁시장내의 수요자원입찰을 고려한 모선별 한계가격의 구성요소산정 기법)

  • Kim, Hyun-Houng;Kim, Jin-Ho;Park, Jong-Bae;Shin, Joong-Rin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.7
    • /
    • pp.1157-1166
    • /
    • 2008
  • This paper presents a new approach for the evaluation of location marginal prices (LMPs) considering demand-side bidding (DSB) in a competitive electricity market. The stabilization of the electric power supply and demand balance is one of the major important activities in electric power industry. In this paper, we present an analytical method for calculation of LMPs considering DSB, which has opportunity to compete with generating units, as England & Wales Pool's DSB scheme[1]. Also, we propose a new approach that LMP considering DSB is divided into three components. The proposed approach can be used for the evaluation of demand-side bidding into the electricity market and the assessment of the influence of DSB on total production costs and LMPs as well as three components.

LMP Calculation with Consideration of Transaction Strategy and Quadratic Congestion Cost Function (거래전략 및 Quadratic 혼잡비용을 고려한 LMP산정에 대한 연구)

  • Kim, Jae-Wook;Jung, Sung-Hun;Min, Kyung-Il;Moon, Young-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.2
    • /
    • pp.257-265
    • /
    • 2011
  • As the competitive market system has been introduced to the electrical power trade, the priority concern would be that the price of electrical power should be reasonable. It is because, when this rule is solid, we can avoid the distortion of competition and assure the greater efficiency in management. LMP(Locational Marginal Price) means marginal price at each bus. This components consist of energy, loss and congestion cost. At this point, the LMP result that is calculated by traditional model is changeable by the location of the slack and can not be used in bilateral Transaction. This paper proposed algorithm is proved its rationality and credibility by comparing the result of the simulation of virtual 6_bus system that is calculated by traditional method, and showed that the LMP components are changed according to the Transaction Strategy. Furthermore, It shows the effect of additional congestion cost on the transmission line that has bottle neck frequently by simulation.