• Title/Summary/Keyword: Compensation calculation standard

Search Result 14, Processing Time 0.018 seconds

A study on the dose distribution for total-body & hemibody irradiation using clinical photon beams (광자선을 이용한 전신 및 반신조사의 선량분포에 관한 고찰)

  • 김진기;권형철;김정수;오영기;김기환;신교철;김정홍;박충기;정동혁
    • Progress in Medical Physics
    • /
    • v.12 no.2
    • /
    • pp.147-153
    • /
    • 2001
  • We have discussed that the total body irradiation(TBI) dose distribution of 6 and 10 MV photon beams, also differences between calculation dose use of compensator sheet and measurements in humanoid phantom. Total body irradiation and hemi-body irradiation(HBI) can be effectively performed when uniformity of dose distribution is estabilished. The method of TBI and HBI dosimatry requires special considerations related to technique, long distance and very large field, machine parameter, patient positioning. TBI and HBI with megavoltage photon beams requires basic dosimatric data which have to be measured directly or derived from the standard beam data. The semiconductor detector and ion chamber were positioned at a dmax depth, mid depth, and its specific ratio was determined using a scanning data by RFA-7 3-dimensional water phantom and solid phantom. The effective source axis distance 380 cm, the field size from 120 cm to 152 cm, isodose distributions were analyzed as a function of the thickness in phantom. Also, have discussed that the measurement of basic data for clinical photon beams for dosage calculations, data calculation sheet and the use of tissue compensation to improve dose uniformity. We have improved a dose uniformity in the TBI and HBI method.

  • PDF

A Study on the Way to Reduce Cadastral Renovation Business Period through Compensation System Improvement - Centered around the Namwon-si Cadastral Research Area - (지적재조사 조정금 산정 및 부과 방식의 개선 연구 - 남원시 지적재조사사업지구를 중심으로 -)

  • Kim, Hong-Ryeol;Min, Woong-kie
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.2
    • /
    • pp.53-68
    • /
    • 2020
  • The Cadastral Renovation is a National project to investigate and survey the registration of Cadastral Record and replace the existing Cadastral Record with a new Cadastral Record by digital, and to correct the registration of Cadastral Record if the registration of Cadastral Record does not match the actual status of the land. The Business Period generally takes about one year and six months to two years. The time required is getting longer due to problems that occur in the course of the Adjustment amount after the cadastral resurvey survey due to complex structure and internal conflict due to the interest between landowners. After Boundary Decision of the real boundary, the land area is confirmed by the landowners, and the cadastral office is to settle the Cadastral Renovation by calculating the Adjustment amount according to the confirmed area and the increase and decrease of the cadastral area. Therefore, the solution plan was suggested so that reasonable Adjustment amount can be applied through empirical research applied to the time of calculation of Adjustment amount and the method of calculation of Adjustment amount. The improvement method showed the expected effect that can lead the agreement with the landowner to the shortest period, and it was also possible to set the real boundary that meets the purpose of the Cadastral Renovation. This study suggests improvements in the method of calculating standard Adjustment amount, the method of imposing Adjustment amount, and the method of boundary adjustment that does not impose adjustment amount through the cadastral Renovation and parallel studies, and it is expected that the Cadastral Renovation will be completed by 2030.

Development of mcyB-specific Ultra-Rapid Real-time PCR for Quantitative Detection of Microcystis aeruginosa (Microcystis aeruginosa의 정량을 위한 mcyB 특이 초고속 실시간 유전자 증폭법의 개발)

  • Jung, Hyunchul;Yim, Byoungcheol;Lim, Sujin;Kim, Byounghee;Yoon, Byoungsu;Lee, Okmin
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.1
    • /
    • pp.46-56
    • /
    • 2018
  • A mcyB-specific Ultra-Rapid quantitative PCR was developed for the quantitative detection of Microcystis aeruginosa, which is often a dominant species in green tide. McyB-specific UR-qPCR was optimized under extremely short times of each step in thermal cycles, based on the specific primers deduced from the mcyB in microcystin synthetase of M. aeruginosa. The M. aeruginosa strain KG07 was used as a standard for quantification, after the microscopic counting and calculation by mcyB-specific UR-qPCR. The water samples from the river water with the Microcystis outbreak were also measured by using both methods. The $1.0{\times}10^8$ molecules of mcyB-specific DNA was recognized inner 4 minutes after beginning of UR-qPCR, while $1.0{\times}10^4$ molecules of mcyB-specific templates was detected inner 7 minutes with quantitative manner. From the range of $1.0{\times}10^2$ to $1.0{\times}10^8$ initial molecules, quantification was well established based on $C_T$ using mcyB-specific UR-qPCR (Regression coefficiency, $R^2=0.9977$). Between the numbers of M. aeruginosa cell counting under microscope and calculated numbers using mcyB-specific UR-qPCR, some differences were often found. The reasons for these differences were discussed; therefore, easy compensation method was proposed that was dependent on the numbers of the cell counting. Additionally, to easily extract the genomic DNA (gDNA) from the samples, a freeze-fracturing of water-sample using liquid nitrogen was tested, by excluding the conventional gDNA extraction method. It was also verified that there were no significant differences using the UR-qPCR with both gDNAs. In conclusion, the mcyB-specific UR-qPCR that we proposed would be expected to be a useful tool for rapid quantification and easy monitoring of M. aeruginosa in environmental water.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.