• Title/Summary/Keyword: Communication Link Analysis

Search Result 396, Processing Time 0.03 seconds

A Study on the Implementation of the Independent Tactical Data Link System for ROK Army (한국형 육군 전술데이터 링크체계 구현 방향 연구)

  • Jung Jae-Hyun;Kwon Tae-Hwan
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.32-49
    • /
    • 2004
  • The Tactical Data Link System is a standardized communication link to exchange and interface positional, situational information, command and control in real time. It has been evaluated that this Link would play an important role for tactical interoperability, situation awareness, and execution of joint operations in the future war. But considering the rapidly changing war situations, even though being admitted the necessity of the Tactical Data Link System of Army helicopter, one of superpowers in the Army, substantially we don't still have any concrete concept to build it. Therefore, this work presents how to embody the Tactical Data Link System through computer-aided system engineering on the base of Tactical Data Link System operating concept analysis of helicopters-ground units.

Required Specification Analysis of Radio over Fiber system for LTE-Advanced Fronthaul link (LTE-Advanced 이동통신망 Fronthaul 구간을 위한 Radio over Fiber 시스템의 필요 전송용량 및 요구사항 분석)

  • Kim, Sung-Man
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.8
    • /
    • pp.915-919
    • /
    • 2014
  • Since smart phones are widely used globally, the demand for high-speed mobile communications are increasing. To accommodate the increased communication demand, the next-generation mobile communication services such as LTE-Advanced are deployed. In the LTE-Advanced base stations, the base station schemes of Digital Unit (DU) and Radio Unit (RU) are widely used. Here, the link between DU and RU is called fronthaul link. In the current fronthaul link, a digital optical communication interface is used, which is called Common Public Radio Interface (CPRI). However, the CPRI link cannot support the increased mobile traffic efficiently. Therefore, in this paper, we investigate an alternative technology based on the Radio over Fiber (RoF) to accommodate the increased mobile traffic economically.

A Proposal on Cryptographic Synchronization for T4 Link Encryption (T4급 링크 암호에 적합한 암호 동기방식 제안)

  • Lee, HoonJae;Kim, KiHwan;Kang, YongJin;Lee, Sang-Gon;Ryu, Young-Jae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.1
    • /
    • pp.202-210
    • /
    • 2018
  • The modern battlefield is being developed as a network-centric warfare where priority is given to rapid status grasp and power deployment through scientification and modernization. Therefore, tactical data link has been continuously improving the network speed, and recently, security technology is required for wireless communication with the UAV and various devices for reconnaissance. In addition, the future information warfare will utilize advanced IT technology positively. Efforts are needed to integrate various systems and networks. However, these efforts are meaningful only when they can assume sufficient security in a newly changing information and communication environment. In this paper, we propose a new cryptographic synchronization for link encryption suitable for tactical data links. The proposed cryptographic synchronization is useful for T4 UAV link encryption, and it is also adaptable for lower BER, then we analyze the performances analysis of that.

Link Budget Analysis of Communication System for Reliable WBAN (신뢰성있는 WBAN을 위한 통신 시스템의 링크 버짓 분석)

  • Roh, Jae-sung
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.6
    • /
    • pp.584-588
    • /
    • 2019
  • Wireless body area network (WBAN) is a networking technology that enables early detection of abnormal health conditions, real-time medical monitoring, and telemedicine support systems. The internet of things (IoT) for healthcare, which has become an issue recently, is one of the most promising areas for improving the quality of human life. It must meet the high QoS requirements of the medical communication system like any other communication system. Therefore, the bit error rate (BER) threshold was chosen to accommodate the QoS requirements of the WBAN communication system. In this paper, we calculated BER performance of WBAN channel using IR-UWB PPM modulation and analyzed link budget and system margin of WBAN according to various system parameters.

Performance Test for the SIGMA Communication System

  • Jeong, Seonyeong;Lee, Hyojeong;Lee, Seongwhan;Shin, Jehyuck;Lee, Jungkyu;Jin, Ho
    • Journal of Astronomy and Space Sciences
    • /
    • v.33 no.4
    • /
    • pp.335-344
    • /
    • 2016
  • Scientific CubeSat with Instruments for Global Magnetic Fields and Radiations (SIGMA) is a 3-U size CubeSat that will be operated in low earth orbit (LEO). The SIGMA communication system uses a very high frequency (VHF) band for uplink and an ultra high frequency (UHF) band for downlink. Both frequencies belong to an amateur band. The ground station that communicates with SIGMA is located at Kyung Hee Astronomical Observatory (KHAO). For reliable communication, we carried out a laboratory (LAB) test and far-field tests between the CubeSat and a ground station. In the field test, we considered test parameters such as attenuation, antenna deployment, CubeSat body attitude, and Doppler frequency shift in transmitting commands and receiving data. In this paper, we present a communication performance test of SIGMA, a link budget analysis, and a field test process. We also compare the link budget with the field test results of transmitting commands and receiving data.

An analysis of UAV line-of-sight according to mission environment (임무 환경에 따른 무인항공기 가시선 분석)

  • Choi, Jun-Su;Hur, Chang-Wu
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.6
    • /
    • pp.1414-1418
    • /
    • 2013
  • In this paper, analyzed of UAVs operation altitude and range from the point of view of the data link. UAVs operation altitude is determined by the specification of the mission equipment and operational purposes. The link-of-sight analysis of data link equipment before deciding the unmanned aircraft operation altitude conditions should be considered. If GDT=0m installation then 32dBi antenna apply 15,779 meter is operation altitude. 44dBi antenna 7,927 meters. Operating altitude perspective, high-gain antenna is recommended of the long range communication.

Performance Analysis of LTE-R Radio Communication Systems in High Speed Train Environment (열차 고속 주행환경에서 LTE-R 무선통신시스템 성능 분석)

  • Kwon, You-Chul;Choi, Jun-Sung;Oh, Hyun-Seo;Kim, Seong-Cheol
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.4
    • /
    • pp.587-594
    • /
    • 2022
  • This paper analyzed radio link throughput performance by applying radio link simulation and test equipment because there is limit in train filed test in 420 km/h high speed environment. According to the radio performance analysis, the throughput performance is slightly degraded in QPSK and 16QAM modulation schemes. But throughput performance is highly degraded in 64QAM modulation scheme.

Performance Analysis of an AF Dual-hop FSO Communication System with RF Backup Link

  • Alhamawi, Khaled A.;Altubaishi, Essam S.
    • Current Optics and Photonics
    • /
    • v.3 no.4
    • /
    • pp.311-319
    • /
    • 2019
  • A hybrid free-space-optical/radio-frequency (FSO/RF) communication system is considered, with the help of amplify-and-forward (AF) relaying. We consider various weather conditions to investigate their effects on the system's performance. We begin by obtaining the cumulative distribution function and probability density function of the end-to-end signal-to-noise ratio for the AF dual-hop FSO communication system with RF backup link. Then, these results are used to derive closed-form expressions for the outage probability, average bit-error rate, and average ergodic capacity. The results show that the considered system efficiently employs the complementary nature of FSO and RF links, resulting in impressive performance improvements compared to non-hybrid systems.

Performance Analysis of Monitoring Process using the Stochastic Model (추계적 모형을 이용한 모니터링 과정의 성능 분석)

  • 김제숭
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.145-154
    • /
    • 1994
  • In this paper, monitoring processor in a circuit switched network is considered. Monitoring processor monitors communication links, and offers a grade of service in each link to controller. Such an information is useful for an effective maintenance of system. Two links with nonsymmetric system Parameters are considered. each link is assumed independent M/M/1/1 type. The Markov process is introduced to compute busy and idle portions of monitoring processor and monitored rate of each link. Inter-idle times and inter-monitoring times of monitoring processor between two links are respectively computed. A recursive formula is introduced to make computational procedure rigorous.

  • PDF

OVERALL LINK ANALYSIS ON HRIT AND LRIT IN COMS

  • Park Durk-Jong;Hyun Dae-Wan;Kang Chi-Ho;Ahn Sang-Il;Kim Eun-Kyu
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.98-100
    • /
    • 2005
  • This paper describes link analysis on the processed data, HRIT (High Rate Information Transmission) and LRIT (Low Rate Information Transmission), for the preliminary design of interface between COMS (Communication, Ocean and Meteorological Satellite) and ground station. At the MODAC (MeteorologicaVOcean Data Application Center), the processed data are transmitted to user station via COMS with normalization and calibration by pre-processing of MI (Meteorological Imager) data. Due to consider satellite as radio relay, overall analysis containing uplink and downlink is needed. Specific link parameters can be obtained with using the outcomes of SRR (System Requirement Review) which was held on 13-14 June 2005, in Toulouse. From the relation between overall link margin and output power of HPA (High Power Amplifier) of MODAC, it is shown that even though the minimum power related with COMS receiving power range is transmitted at MODAC, the obtained link margin of HRIT could be above 3 dB at user station which antenna elevation angle is 10 degree.

  • PDF