• Title/Summary/Keyword: Combined Cycle Plant

Search Result 225, Processing Time 0.026 seconds

Performance Evaluation of IGCC Plants with Variation in Coal Rank and Coal Feeding System (탄종 및 석탄공급방식 변화에 따른 석탄가스화 복합발전 플랜트의 성능 평가)

  • 이승종;이진욱;윤용승
    • Journal of Energy Engineering
    • /
    • v.6 no.2
    • /
    • pp.176-187
    • /
    • 1997
  • As a way to evaluate the performance of IGCC (Integrated Gasification Combined Cycle) processes, heating values of coal gas as well as plant efficiency were compared for different rank coals and coal feeding methods by employing the static process simulation technique. Performance of the process was compared with coal rank that was varied by three assorted bituminous coals and also by three subbituminous coals, in addition to the two types of feeding techniques, i.e., dry-feeding and slurry-feeding, that are utilized in entrained-bed coal gasifiers. For the verification of the simulation technique, simulated results were compared first with the actual pilot plant data published from Shell and Texaco. The simulation technique was, then, applied to other coals. Result from tests varying coal rank exhibits the trend of improving both heating content of the product gas and plant efficiency with increasing carbon content in coal. The effect of coal rank is more sensitive in slurry-feeding cases compared to the dry-feeding cases. In particular, considering notably lower values in gas heating value and plant efficiency calculated in the slurry-feeding case that uses a subbituminous coal, limited utilization of the slurry-feeding method for subbituminous coals can be expected. From the plant efficiency point of view, dry-feeding method resulted in higher simulated efficiency values by maximum 3% for subbituminous coals and ca. l% for bituminous coals.

  • PDF

Optimization Process Models of CHP and Renewable Energy Hybrid Systems in CES (구역전기 사업시 CHP와 신재생에너지 하이브리드 시스템의 최적공정 모델)

  • Lee, Seung Jun;Kim, Lae Hyun
    • Journal of Energy Engineering
    • /
    • v.26 no.2
    • /
    • pp.99-120
    • /
    • 2017
  • In SS branch of Korea District Heating Corporation, Combined Heat & Power power plant with 99MW capacity and 98Gcal / h capacity is operated as a district electricity business. In this region, it is difficult to operate the generator due to the problem of surplus heat treatment between June and September due to the economic recession and the decrease in demand, so it is urgent to develop an economical energy new business model. In this study, we will develop an optimized operation model by introducing a renewable energy hybrid system based on actual operation data of this site. In particular, among renewable energy sources, fuel cell (Fuel Cell) power generation which can generate heat and electricity at the same time with limited location constraints, photovoltaic power generation which is representative renewable energy, ESS (Energy Storage System). HOMER (Hybrid Optimization of Multiple Energy Resources) program was used to select the optimal model. As a result of the economic analysis, 99MW CHP combined cycle power generation is the most economical in terms of net present cost (NPC), but 99MW CHP in terms of carbon emission trading and renewable energy certificate And 5MW fuel cells, and 521kW of solar power to supply electricity and heat than the supply of electricity and heat by 99MW CHP cogeneration power, it was shown that it is economically up to 247.5 billion won. we confirmed the results of the improvement of the zone electricity business condition by introducing the fuel cell and the renewable energy hybrid system as the optimization process model.

Potential of Coal Gasification Slag as an Alkali-activated Cement (석탄가스화 복합발전 슬래그의 알칼리 활성 시멘트로서의 가능성)

  • Kim, Byoungkwan;Lee, Sujeong;Chon, Chul-Min;Choi, Hong-Shik
    • Resources Recycling
    • /
    • v.27 no.2
    • /
    • pp.38-47
    • /
    • 2018
  • Integrated gasification combined cycle (IGCC) is a next generation energy production technology that converts coal into syngas with enhanced power generation efficiency and environmental performance. IGCC produces almost coal gasification slag as the solid by-product. IGCC slag is generated about 140,000 tons for a year although recycling of it is still in the early stages. We evaluated the potential of IGCC slag which is generated from a pilot plant in South Korea as an alkali-activated cement. Samples which were activated with the combined activator of sodium silicate solution and caustic soda had an average compressive strength of 4.5 MPa, showing expansion. Expansion of the alkali-activated slag was presumed to be caused by free CaO in the slag, although it was not detected by the ethylene glycol method. Samples that were activated with the combined activator of sodium aluminate and caustic soda had an average compressive strength of 10 MPa. Hydroxy sodalite and $C_3AH_6$ were found to be the new crystalline phases. IGCC slag can be used as an alkali-activated material, but the strength performance should be improved with proper mix design approach to calculate optimum proportions which can alleviate the expansion issue at the same time.

Linear Model Predictive Control of an Entrained-flow Gasifier for an IGCC Power Plant (석탄 가스화 복합 발전 플랜트의 분류층 가스화기 제어를 위한 선형 모델 예측 제어 기법)

  • Lee, Hyojin;Lee, Jay H.
    • Korean Chemical Engineering Research
    • /
    • v.52 no.5
    • /
    • pp.592-602
    • /
    • 2014
  • In the Integrated Gasification Combined Cycle (IGCC), the stability of the gasifier has strong influences on the rest of the plant as it supplies the feed to the rest of the power generation system. In order to ensure a safe and stable operation of the entrained-flow gasifier and for protection of the gasifier wall from the high internal temperature, the solid slag layer thickness should be regulated tightly but its control is hampered by the lack of on-line measurement for it. In this study, a previously published dynamic simulation model of a Shell-type gasifier is reproduced and two different linear model predictive control strategies are simulated and compared for multivariable control of the entrained-flow gasifier. The first approach is to control a measured secondary variable as a surrogate to the unmeasured slag thickness. The control results of this approach depended strongly on the unmeasured disturbance type. In other words, the slag thickness could not be controlled tightly for a certain type of unmeasured disturbance. The second approach is to estimate the unmeasured slag thickness through the Kalman filter and to use the estimate to predict and control the slag thickness directly. Using the second approach, the slag thickness could be controlled well regardless of the type of unmeasured disturbances.

A study on the engineering optimization for the commercial scale coal gasification plant (상용급 석탄가스화플랜트 최적설계에 관한 연구)

  • Kim, Byeong-Hyeon;Min, Jong-Sun;Kim, Jae-Hwan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.131.1-131.1
    • /
    • 2010
  • This study was conducted for engineering optimization for the gasification process which is the key factor for success of Taean IGCC gasification plant which has been driven forward under the government support in order to expand to supply new and renewable energy and diminish the burden of the responsibility for the reduction of the green house gas emission. The gasification process consists of coal milling and drying, pressurization and feeding, gasification, quenching and HP syngas cooling, slag removal system, dry flyash removal system, wet scrubbing system, and primary water treatment system. The configuration optimization is essential for the high efficiency and the cost saving. For this purpose, it was designed to have syngas cooler to recover the sensible heat as much as possible from the hot syngas produced from the gasifier which is the dry-feeding and entrained bed slagging type and also applied with the oxygen combustion and the first stage cylindrical upward gas flow. The pressure condition inside of the gasifier is around 40~45Mpg and the temperature condition is up to $1500{\sim}1700^{\circ}C$. It was designed for about 70% out of fly ash to be drained out throughout the quenching water in the bottom part of the gasifier as a type of molten slag flowing down on the membrane wall and finally become a byproduct over the slag removal system. The flyash removal system to capture solid particulates is applied with HPHT ceramic candle filter to stand up against the high pressure and temperature. When it comes to the residual tiny particles after the flyash removal system, wet scurbbing system is applied to finally clean up the solids. The washed-up syngas through the wet scrubber will keep around $130{\sim}135^{\circ}C$, 40~42Mpg and 250 ppmv of hydrochloric acid(HCl) and hydrofluoric acid(HF) at maximum and it is turned over to the gas treatment system for removing toxic gases out of the syngas to comply with the conditions requested from the gas turbine. The result of this study will be utilized to the detailed engineering, procurement and manufacturing of equipments, and construction for the Taean IGCC plant and furthermore it is the baseline technology applicable for the poly-generation such as coal gasification(SNG) and liquefaction(CTL) to reinforce national energy security and create new business models.

  • PDF

Investigation of the Coil Deforamtion of the Gas Turbine Generator Rotor Using Finite Element Analysis (유한요소해석을 이용한 가스터빈 발전기 로터의 계자권선 변형 해석)

  • Yun, W.N.;Park, H.K.;Kang, M.S.;Kim, J.S.
    • Journal of Power System Engineering
    • /
    • v.13 no.6
    • /
    • pp.95-101
    • /
    • 2009
  • The generator for gas turbine power generation consists of the rotor which generates magnetic field, the winding coil which is the path for the field current and the wedge and retaining ring which prevents the radial movement of the coil. Relatively severe deformation was observed at the coil end section during the inspection of the generator for peaking-load operation, and the thermal-electricity and the centrifugal force were evaluated by the simple modeling of the windings to find the cause. But the simulation stress was not sufficient to induce the coil plastic deformation. The analysis result seems to be applicable to the base-load generators which runs continuously without shut down up to a year, but there had been more deformation than simulated for the generator which is started up and shut down frequently. The cause of the coil deformation was the restriction of the expansion and shrinkage. The restriction occurs when the winding coil shrinks, and the stress overwhelms the yield stress and cause the plastic deformation. The deformation is accumulated during the start-ups and shut-downs and the thermal growth occurs. The factors which induce the coil restriction during the expansion and shrinkage should be reduced to prevent the unallowable deformation. The resolutions are cutting off the field current earlier during the generator shut-down, modifying the coil end section to remove the stress concentration and making the insulation plate inserted between the coil end section and the retaining ring have the constant thickness.

  • PDF

Development of Inter-Turn Short Circuits Sensor for Field Winding of Synchronous Generator

  • Nam J-H;Jeon Y-S;Choe G-H;Lee S-H;Jeong S-Y;Yoo B-Y;Ju Y-H;Lee Y-J;Shin W-S
    • Proceedings of the KIPE Conference
    • /
    • 2001.10a
    • /
    • pp.56-59
    • /
    • 2001
  • An effective method of detecting inter-turn short circuits on round rotor windings is described. Shorted-turns can have significant effects on a generator and its performance. A method of detecting inter-turn short circuits on rotor windings is described. The approach used is to measure the rate of change of the air-gap flux density wave when the rotor is at operating speed and excitation is applied to the field winding. The inter-turn short circuits sensor for synchronous generator's field winding has been developed. The sensor, installed in the generator air-gap, senses the slot leakage flux of field winding and produces a voltage waveform proportional to the rate of change of the flux. For identification of reliability for sensor, a inter-turn short circuits test was performed at the West-Inchon combined cycle power plant on gas turbine generator and steam turbine generator. This sensor will be used as a detecting of shorted-turn for field winding of synchronous generator. The purpose of this paper is to describe the design and operation of a sensitive inter-turn short circuits detector. In this paper, development of inter-turn short circuits sensor for field winding of synchronous generator and application in a field.

  • PDF

An Experimental Study on the Ambient and High Pressure Combustion Characteristics of Gas Turbine for IGCC (석탄가스화 복합발전용 가스터빈의 상압 및 고압연소특성에 관한 실험적 연구)

  • Lee, Min-Chul;Seo, Seok-Bin;Yoon, Young-Bin
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.685-693
    • /
    • 2011
  • In the era of energy climate, IGCC technology is one of the powerful solutions for the demands of new energy with low carbon green growth. The present study is conducted to investigate the combustion characteristics of syngas from the coal gasifier to predict problems when it is fed to the gas turbine. Through high and low combustion tests, we understood that hydrogen is the main reason of NOx emission but easily controled by injecting the dilution of nitrogen. CO emission of syngas was comparable with that of methane and pressure fluctuation of syngas was not significant. The data from this study will be used for the optimization of combustion in the Korea first IGCC plant in 2015.

  • PDF

Study on the Design and Operation Characteristics of Ejector System (이젝터 시스템의 설계 및 작동 특성에 관한 연구)

  • NamKoung, Hyuck-Joon;Han, Poong-Gyoo;Kim, Young-Soo
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.627-630
    • /
    • 2009
  • Ejector system can induce the secondary flow or affect the secondary chamber pressure by both shear stress and pressure drop which are generated in the primary jet boundary. Ejectors are widely used in a range of applications such as a turbine-based combined-cycle propulsion system and a high altitude test facility for rocket engine, pressure recovery system, desalination plant and ejector ramjet etc. The primary interest of this study is to set up an configuration and operating conditions for an ejector in the condition of sonic and subsonic. Experimental and theoretical investigation on the sonic and subsonic ejectors with a converging-diverging diffuser was carried out. Numerical simulation was adopted for an optimal geometry design and satisfying the required performance. Also, some ejectors with a various of nozzle throat and mixing chamber diameter were manufactured precisely and tested for the comparison with the calculation results.

  • PDF

An Experimental Investigation of Combustion Characteristics in a Model Combustor by Reproduction of GE 7FA+e DLN-2.6 Gas Turbine (GE 7FA+e DLN-2.6 연소기를 모사한 모형 가스터빈 연소기의 연소불안정 특성에 대한 실험적 연구)

  • Kim, Min-Ki;Lee, Jang-Su;Park, Seong-Soon;Yoon, Young-Bin
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.231-235
    • /
    • 2009
  • The mainly objectives of this study was a combustion dynamics and instability characteristics in a model dump type combustor which is scale down of GE 7FA+e DLN 2.6 gas turbine combustor with running at Seo-Inchon combined cycle power plant. Model gas turbine injector has 2-stage swirl vane and it's reduced 1/3 size of the original one. The shape of plenum and combustor were designed for similar acoustic characteristics. As the result, this research have been shows the peak frequency of model combustor was changed quarter-wave mode to Helmholtz resonator mode in plenum and longitudinal mode in dump combustor at unstable flame conditions caused by the different of combustor temperature and fuel-air mixture distributions.

  • PDF