• Title/Summary/Keyword: Collapse line

Search Result 111, Processing Time 0.026 seconds

A Study on Engineering Characteristics of Weak Rock Ground happened TBM Jaming accident in Tunnelling (TBM 터널 굴진시 Jamming이 발생되는 지반의 공학적 특성에 대한 연구)

  • Yu, Gil-Hwan
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.45
    • /
    • pp.60-70
    • /
    • 2008
  • Mechanized tunnelling by TBMs has been extensively adopted for last two decades. Nevertheless, only few case histories have been reported. Unlike NATM tunnels, the case histories of the weak zone have been seldom reported for the mechanized tunnelling, even in the other countries. In this study, a collapse of TBM tunnel occurred in the severely altered weak rock zones between volcaniclastic rocks and granitic rocks was briefly described. A systematic geotechnical investigation, which was performed to examine the cause of the collapse, was carried out at the site and then characteristics of the rocks in the zones were evaluated. Moreover, This study propose a guide line of estimateing the possibility of collapse in TBM tunnels through comparing experimental results with surveying results of general rocks.

  • PDF

Automated yield-line analysis of beam-slab systems

  • Johnson, David
    • Structural Engineering and Mechanics
    • /
    • v.3 no.6
    • /
    • pp.529-539
    • /
    • 1995
  • The rigid-plastic yield-line analysis of isotropically reinforced concrete slabs acting in conjunction with torsionally weak supporting beams is developed as the lower-bound form of a linear programming formulation. The analysis is extended to consider geometric variation of chosen yield-line patterns by the technique of sequential linear programming. A strategy is followed of using a fine potential yield-line mesh to identify possible collapse modes, followed by analysis using a coarser, simplified mesh to refine the investigation and for use in conjunction with geometric optimization of the yield-line system. The method is shown to be effective for the analysis of three slabs of varying complexity. The modes detected by the fine and simplified analyses are not always similar but close agreement in load factors has been consistently obtained.

Contingency Ranking Algorithm Using Voltage Stability (전압안정성를 고려한 전력계통의 상정사고 선택 앨고리즘)

  • Park, Kyu-Hong;Cho, Yang-Haeng;Jung, Leen-Hark
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.105-107
    • /
    • 2002
  • This paper presents a algorithm for contingency ranking using the real power ratio. The fundamemtal cause of voltage collapse is considered due to excessive power trnsfer through the line. To obtain contingency ranking, maximum real power tansferred to the load is obtained when load impedance $Z_r$ equal to line impedance $Z_s$. This algorithm is verified by simulation on a 6-bus test system.

  • PDF

Contingency Ranking Algorithm Using Voltage Stability (전압안정성를 고려한 전력계통의 상정사고 선택 엘고리즘)

  • Park, Kyu-Hong;Cho, Yang-Haeng;Jung, Ieen-Hark
    • Proceedings of the KIEE Conference
    • /
    • 2002.06a
    • /
    • pp.146-148
    • /
    • 2002
  • This paper presents a algorithm for contingency ranking using the real power ratio, The fundamemtal cause of voltage collapse is considered due to excessive power trnsfer through the line To obtain contingency ranking, maximum real power tansferred to the load is obtained when load $impedance^{Z_r}$ equal to line $impedance^{Z_s}$, This algorithm is verified by simulation on a 6-bus test system.

  • PDF

Proposed Landslide Warning System Based on Real-time Rainfall Data (급경사지 붕괴위험 판단을 위한 강우기반의 한계영역 설정 기법 연구)

  • Kim, Hong Gyun;Park, Sung Wook;Yeo, Kang Dong;Lee, Moon Se;Park, Hyuck Jin;Lee, Jung Hyun;Hong, Sung Jin
    • The Journal of Engineering Geology
    • /
    • v.26 no.2
    • /
    • pp.197-205
    • /
    • 2016
  • Rainfall-induced landslide disaster case histories are typically required to establish critical lines based on the decrease coefficient for judging the likelihood of slope collapse or failure; however, reliably setting critical lines is difficult because the number of nationwide disaster case histories is insufficient and not well distributed across the region. In this study, we propose a method for setting the critical area to judge the risk of slope collapse without disaster case history information. Past 10 years rainfall data based on decrease coefficient are plotted as points, and a reference line is established by connecting the outermost points. When realtime working rainfall cross the reference line, warning system is operating and this system can be utilized nationwide through setting of reference line for each AWS (Automatic Weather Station). Warnings were effectively predicted at 10 of the sites, and warnings could have been issued 30 min prior to the landslide movement at eight of the sites. These results indicate a reliability of about 67%. To more fully utilize this model, it is necessary to establish nationwide rainfall databases and conduct further studies to develop regional critical areas for landslide disaster prevention.

Load capacity of high-strength reinforced concrete slabs by yield line theory

  • Gorkem, Selcuk Emre;Husem, Metin
    • Computers and Concrete
    • /
    • v.12 no.6
    • /
    • pp.819-829
    • /
    • 2013
  • The objective of this study is to determine whether or not the yield line theory, an effective method widely used for slabs made of ordinary concrete, can be used also for the reinforced concrete slabs made of high-strength concrete. Flexural behavior of simply supported slabs in three different sizes were investigated under concentrated load at mid-span. Additionally, behavior of high strength reinforced concrete slabs with 50 mm and 150 mm reinforcement spacings also studied. Failure loads, deflections, experimental and theoretical failure mechanisms were evaluated. The difference between the moments based on yield line theory and experimental moments varied between 1% to 3%. Experimental and analysis results revealed that yield line analysis could conveniently be employed in the analysis of high strength reinforced concrete slabs.

A study of impedance relay operation and voltage instability caused by over load of neighborhood line at contingency of heavy load line (증조류 선로 고장시 인접선로 과부하에 의한 거리계전기 동작 및 전압불안정 현상 연구)

  • Yun, Ki-Seob;Lee, Hyoung-Han;Kim, Chang-Gon;Ahn, Bo-Soon
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.359-361
    • /
    • 2005
  • This paper presents the method of countermeasures before voltage collapse by load encroachment(impedance of load ability on R-X locus decrease toward zero point) and describes a study of impedance relay(zone-3) operation and voltage instability caused by over load of neighborhood line at contingency of heavy load line.

  • PDF

A Study on the Risk Reduction of Distribution Line through Analysis of Electric Shock Accident (감전재해 분석을 통한 배전선로의 위험성 저감에 관한 연구)

  • Byeon, Junghwan;Choi, Sang-won
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.14-20
    • /
    • 2018
  • In this study, we analyze the current status of major disasters in distribution works and propose safety measures through the distribution live-line work method and electric shock risk assessment. The result of analyzing the ratio of electric shocks to the occurrence of industrial accidents in the recent 13 years shows that the death rate is higher than other industries, especially the construction industry occupying most of the disaster, and it is higher than the collapse disaster. We analyze statistic data of 101 victims selected as core words of live work, distribution line, pole and 22.9 kV in the investigation report of major accident of electric shock fatal from 2001 to 2014. The safety measure was established through the risk assessment of the distribution method using the standard model of the risk assessment based on the results of electric shock analysis on the distribution line. In order to prevent the electric shock accident which is recently being discussed, the risk assessment procedure were carried out in the above-mentioned 22.9kV special high voltage live-line operation method. We derived the risk reduction plan for the distribution line from the results of the major accidents statistic and demonstration of the line works.

Study on Structural Behavior of Traditional Stone Bridges (전통석조아치교량의 구조적 거동에 대한 연구)

  • Kim, Nam-Hee;Koh, Hyn-Moo;Hong, Sung-Gul
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.78-83
    • /
    • 2008
  • There are many Korean traditional stone structures that have resisted successfully over more than several hundred years. However, their structural behavior is not investigated in engineering context yet. It is then difficult to predict how they behave against various loadings if they face. This paper is to investigate structural performance of the stone bridge structures based on the limit theorem. Structural performance of stone bridges are explained using possible collapse mechanisms with the corresponding thrusts whose values depend on the loads and the arch geometry.

  • PDF

The Ground Reinforcement on Daylight Collapsed Block in Driving Work at the National Road No. 3 Line (국도 3호선 터널건설 공사 중 붕락구간에 대한 지반보강)

  • 천병식;정덕교;이태우;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.02a
    • /
    • pp.14-22
    • /
    • 1999
  • Daylight collapse have been occurred by about 6.$^{0}$ m deep at ground surface which connected to the ground surface and excessive overbreak have been occurred by the space and height of 3.$^1$~6.$^2$m at crown head part of the tunnel during tunnelling of lower-half part after completing upper-half part on tunnelling of a phyllite mountain by NATM method at the construction work of two way-double track national road. This study is a successful illustration case of earth improvement by confirming structural safety of the tunnel in a whole through solving the cause of the tunnel collapse and the work have completed successfully through applying such earth strengthening method as cement mortarㆍcement milk injection, S.G.R, steel pipe reinforced multi-step grouting etc.

  • PDF