• Title/Summary/Keyword: Clash

Search Result 106, Processing Time 0.02 seconds

Study on Fun factor in Smartphone Convergence Game - Focusing on the Defense and Plunder (스마트폰 융복합 게임의 재미요인 분석 - 수성과 약탈을 중심으로)

  • Kim, In-Su;Jung, Hyung-Won;Kim, Tae-Gyu
    • Journal of Digital Convergence
    • /
    • v.13 no.7
    • /
    • pp.367-372
    • /
    • 2015
  • Smartphone game market, smart phone appeared on the market and soon developed rapidly, generation change is happening. Generally, Smartphone games are only short-lived super cell's Clash of Clans is gaining popularity for over two years. So Clash of Clans this game with hold most characteristic elements of the defense and plunder on the subject analyzed the fun factor. In order to analyze the defense and plunder elements were prepared Clash of Clans and Kings of Thieves in cases. Two of the cases, depending on the fun theory Preparation, A sense of space, A solid core machanic, A range of challenge, A range of abilities required to solve the encounter and Skill required in using the abilities were evaluated in the fun factor analysis of defense and plunder elements.

ACCIDENTS & INJURIES IN INTERNATIONAL AIR LAW : THE CLASH OF THE TITANS

  • Dempsey, Paul Stephen
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.24 no.2
    • /
    • pp.235-270
    • /
    • 2009
  • This Article examines what is contemplated by the term "accident," what is meant by "bodily injury," and what damages are recoverable under Article 17 of both the Warsaw Convention of 1929 and the Montreal Convention of 1999. It examines differences in the jurisprudence of the US Supreme Court, the UK House of Lords, and the Australian High Court in interpreting these terms, and the problems posed by these different interpretations in achieving the uniformity of international aviation liability law contemplated by the Warsaw and Montreal Conventions.

  • PDF

VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.12-16
    • /
    • 2011
  • Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

  • PDF

A Study on Mobile Game Security Threats by Analyzing Malicious Behavior of Auto Program of Clash of Clans (클래시 오브 클랜 오토 프로그램의 악성 행위 분석을 통한 모바일 게임 보안 위협에 관한 연구)

  • Heo, Geon Il;Heo, Cheong Il;Kim, Huy Kang
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.25 no.6
    • /
    • pp.1361-1376
    • /
    • 2015
  • Recently, the size of the mobile game market and the number of mobile game users are growing. Also, as the mobile game's life cycle is increasing at the same time, auto program issue reappears which has been appeared in PC online games. Gamers usually tend to ignore warning messages from antivirus programs and even worse they delete antivirus program to execute auto programs. Therefore, mobile game users are easily compromised if the auto program performs malicious behaviors not only for the original features. In this paper, we analyze whether seven auto programs of "clash of clans" which has a lot more users for a long time perform malicious behaviors or not. We forecast the possible security threats in near future and proposed countermeasures based on this analysis. By analyzing auto programs of highly popular mobile game of today, we can acquire the knowledge on auto program's recent trend such as their development platform, operating mode, etc. This analysis will help security analysts predict auto program's evolving trends and block potential threats in advance.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Estimate of Wave Overtopping Rate on Armoured Slope Structures Using FUNWAVE-TVD Model (FUNWAVE-TVD 모델을 이용한 경사구조물의 월파량 산정)

  • Moon Su Kwak
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.36 no.1
    • /
    • pp.11-19
    • /
    • 2024
  • In this study, the program was modified by adding the empirical formula of EurOtop (2018) to enable calculation of wave overtopping on armoured slope structures in the FUNWAVE-TVD model using the fully nonlinear Boussinesq equation. The validity of the modified numerical model was verified by comparing it with CLASH data and experiment data for the rubble mound structure. This model accurately reproduced the change in wave overtopping rate according to the difference in the roughness factor of the armoured block, and well reproduced the rate of decrease in wave overtopping rate due to the increase in relative freeboard. The overtopping rate of the armoured slope structures showed significant differences depending on the positioning condition of the armoured blocks. When Tetrapods were placed with regular positioning, the overtopping rate increased significantly compared to when they were placed with random positioning, and it was consistent with when they were placed with Rocks. Meanwhile, when rocks were placed in one row, the wave overtopping rate was greater than when rocks were placed in two rows, which is believed to be due to the influence of the roughness and permeability of the structure's surface.

Speaking of Religion

  • Pecora, Vincent P.
    • Lingua Humanitatis
    • /
    • v.2 no.2
    • /
    • pp.183-201
    • /
    • 2002
  • Since the end of the Cold War, debate about the grand struggle between capitalism and communism has been largely replaced by debate about religious sectarianism. Some have even referred to a "clash of civilizations" in the wake of the spread of Islamic fundamentalism. This is in fact an old debate, but it has been given new life by arguments about globalization and economic development as envisioned by the West, and especially by the terrorist attacks in New York on September 11, 2001. While the political right has had little difficulty treating religious belief as a fundamental human and social interest, much of the political left has remained committed to secular Enlightenment, even when it criticizes the hegemony of the West. The dispute depends upon competing notions of history, secularism, and progress, and ultimately on the possibility or desirability of universal solidarity. While for many a world unified by one religion may no longer make sense, the old Enlightenment dream that a single version of secular and universal reason will eventually prevail over religious difference may also need to be reconsidered. The process that we call secularization is neither as singular, nor as transparent, as we might think.

  • PDF

Information Modeling for BIM Based Design of Precast Concrete Platform (BIM 기반의 설계를 위한 프리캐스트 콘크리트 승강장의 정보모델링)

  • Jeong, Ji-Sook;Lee, Kwang-Myong;Park, Ki-Hyun;Park, Young-Shik
    • Journal of KIBIM
    • /
    • v.4 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • The construction method using PC(Precast Concrete) has been widely used because the method can shorten the construction period and improve construction quality. In this paper, through the analysis of present design process for PC railway platform, design parameters on the geometry and properties were extracted and 3D information models for PC railway platform were constructed by the parametric modeling technique. Furthermore, the interface module was developed to link 3D models to the structural analysis/design sheet and database program using VBA(Visual Basic Application). This information model could be used in various areas including structural analysis and design, 2D drawing, quantity estimation and 4D simulation including clash detection.

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

Legal Culture and Commercial Arbitration in the United States and Japan

  • Kim, Chin-Hyon;Chung, Yong-Kyun
    • Journal of Arbitration Studies
    • /
    • v.23 no.3
    • /
    • pp.185-212
    • /
    • 2013
  • In this paper, a conceptual model of legal culture based on Ehrlich's "living law" theory and Cole's social-cultural explanation can explain the low utilization rates of arbitration of Japan and the high utilization rates of arbitration in the United States, simultaneously. This model highlights the clash between social norms and legal provisions in Japan. Japan has developed a two-tiered system of dispute resolution. At the official level, Japanese people accept the legal system imposed by the outside world. But, at a deeper level, they utilize diverse forms of informal dispute resolution mechanisms, such as reconcilement and conciliation, reflecting their own social norms. In contrast, there is no conflict between social norms and legal provisions in United States. This study may show that there are distinctions between American-style arbitration and Japanese-style arbitration, reflecting their own respective social norms. The question of reconciliation between the American style of arbitration and the Japanese style of arbitration can be resolved by an international arbitrator.

  • PDF