• Title/Summary/Keyword: Claims Analysis

Search Result 448, Processing Time 0.026 seconds

Sweden at the Innovation Frontier - Assessing Performance and Challenges in a Disruptive World

  • Deiaco, Enrico;Bager-Sjogren, Lars
    • STI Policy Review
    • /
    • v.3 no.2
    • /
    • pp.1-46
    • /
    • 2012
  • The paper assesses the innovative performance and challenges that a small innovative country like Sweden faces in an era of intense global competition. We contrast innovative performance with similar countries in Europe as well as discus the reliability and validity of indicators used to shape policy development. The conclusion from the analysis shows that available input-output indicators must be used with some caution. Even if the supply and quality of indicators has increased for policy analysis, they still lack precision and validity to make broad claims about the innovative performance of companies and nations. It is argued that understanding knowledge flows (rather than simple input-output metrics) are a key to understand innovation processes for small countries at the innovation frontier; subsequently, small countries will have to abandon failed policy orthodoxies in order to cope with future policy challenges.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Representing Topic-Comment Structures in Chinese

  • Pan, Haihua;Hu, Jianhua
    • Proceedings of the Korean Society for Language and Information Conference
    • /
    • 2002.02a
    • /
    • pp.382-390
    • /
    • 2002
  • Shi (2000) claims that topics must be related to a syntactic position in the comment, thus denying the existence of dangling topics in Chinese. Under Shi's analysis, the dangling topic sentences in Chinese are not topic-comment but subject-predicate sentences. However, Shi's arguments are not without problems. In this paper we argue that topics in Chinese can be licensed not only by a syntactic gap but also by a semantic gap/variable without syntactic realization. Under our analysis, all the dangling topics discussed in Shi (2000) are, in fact, not subjects but topics licensed by a semantic gap/variable that can turn the relevant comment into an open predicate, thus licensing dangling topics and deriving well-formed topic-comment constructions. Our analysis fares better than Shi's in not only unifying the licensing mechanism of a topic to an open predicate without considering how the open predicate is derived, but also unifying the treatment of normal and dangling topics in Chinese,

  • PDF

Scenarios for Manufacturing Process Data Analysis using Data Mining (데이터 마이닝을 이용한 생산공정 데이터 분석 시나리오)

  • Lee, Hyoung-wook;Bae, Sung-min
    • Journal of Institute of Convergence Technology
    • /
    • v.3 no.1
    • /
    • pp.41-44
    • /
    • 2013
  • Process and manufacturing data are numerously accumulated to the enterprise database in industries but little of those data are utilized. Data mining can support a decision to manager in process from the data. However, it is not easy to field managers because a proper adoption of various schemes is very difficult. In this paper, six scenarios are conducted using data mining schemes for the various situations of field claims such as yield problem, trend analysis and prediction of yield according to changes of operating conditions, etc. Scenarios, like templates, of various analysis situations are helpful to users.

  • PDF

The Development on the Estimate method for the Cost-Effect Analysis of the Electrical Safety Management (전기안전 업무의 비용효과 분석을 위한 전기화재 손실비용 추정방법 개발)

  • Yoo, Jae-Geun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.349-352
    • /
    • 2015
  • This paper estimates electrical fire damage cost-effect to analyze electrical safety efficiency by applying a cost-benefit analysis method for analyzing the efficiency of a business public interest. Electrical fire loss statistics data was presented as direct costs and casualties, including deaths due to an electrical fire, this paper adds overhead "Incidental Cost of Accidents to the Employer" by W. H. Heinrich was applied to estimate the cost of economic loss. Also wounded, including the loss of human deaths by referring to the car accident insurance claims costs and human development estimated the losses caused by an electrical fire. And to perform a cost-benefit analysis of the electrical safety as a result of future work. In this paper, the economic effect of the electric field of safety and public interest work to systematically presented.

ON FIXED POINT THEOREMS SATISFYING COMPATIBILITY PROPERTY IN MODULAR G-METRIC SPACES

  • Daniel Francis;Godwin Amechi Okeke;Ho Geun Hyun
    • Nonlinear Functional Analysis and Applications
    • /
    • v.29 no.2
    • /
    • pp.361-391
    • /
    • 2024
  • In this paper, a pair of ω-compatible self mappings in the setting of modular G-metric space is defined. We prove the existence and uniqueness of common fixed point of pairs of ω-compatible self mappings in a G-complete modular G-metric space. Furthermore, we give an example to justify our claims. The results established in this paper extend, improve, generalize and complement some existing results in literature.

Analysis of the annual changes in dental institutions that claimed dental sedatives in Korea and the types of sedatives using health care big data

  • Minjae Lee;Seong In Chi;Hyuk Kim;Kwang-Suk Seo
    • Journal of Dental Anesthesia and Pain Medicine
    • /
    • v.23 no.2
    • /
    • pp.101-110
    • /
    • 2023
  • Background: Dentists make various efforts to reduce patients' anxiety and fear associated with dental treatment. Dental sedation is an advanced method that dentists can perform to reduce patients' anxiety and fear and provide effective dental treatment. However, dental sedation is different from general dental treatment and requires separate learning, and if done incorrectly, can lead to serious complications. Therefore, sedation is performed by a limited number of dentists who have received specific training. This study aimed to investigate the proportion of dentists who practice sedation and the main sedatives they use in the context of the Republic of Korea. Methods: We used the customized health information data provided by the Korean National Health Insurance. We investigated the number of dental hospitals or clinics that claimed insurance for eight main sedatives commonly used in dental sedation from January, 2007 to September, 2019 at the Health Insurance Review and Assessment Service. We also identified the changes in the number of dental medical institutions by region and year and analyzed the number and proportion of dental medical institutions prescribing each sedative. Results: In 2007, 302 dental hospitals prescribed sedatives, and the number increased to 613 in 2019. In 2007, approximately 2.18% of the total 13,796 dental institutions prescribed sedatives, increasing to 3.31% in 2019. In 2007, 168 institutions (55.6%) prescribed N2O alone, and in 2019, 510 institutions (83.1%) made claims for it. In 2007, 76 (25.1%) hospitals made claims for chloral hydrate, but the number gradually decreased, with only 29 hospitals (4.7%) prescribing it in 2019. Hospitals that prescribed a combination of N2O, chloral hydrate, and hydroxyzine increased from 27 (8.9%) in 2007 to 51 (9%) in 2017 but decreased to 38 (6.1%) in 2019. The use of a combination of N2O and midazolam increased from 20 hospitals (6.6%) in 2007 to 51 hospitals (8.3%) in 2019. Conclusion: While there is a critical limitation to the investigation of dental hospitals performing sedation using insurance claims data, namely exclusion of dental clinics providing non-insured treatments, we found that in 2019, approximately 3.31% of the dental clinics were practicing sedation and that N2O was the most commonly prescribed sedative.

Association Rules Analysis Between the Types and Causes of Disputes in Construction Projects (연관규칙 분석을 통한 건설공사 분쟁유형과 분쟁원인의 연관성 분석에 관한 연구)

  • Jang, Se Rim;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.3-14
    • /
    • 2022
  • Construction projects have high potentials of claims among a variety of stakeholders. Claims on their own are not disputes but they have high potentials leading to disputes if agreements are not made between parties due to conflicting opinions. In the event of the construction disputes between clients and contractors, it could give negative impacts to both parties and, to minimize or pro-actively manage construction disputes, the role of clients is more significant. The objective of the study is to analyze a level of associations between the types of disputes and causes of construction projects based on the association rule analysis, and to identify and discuss key characteristics and implications from client's perspectives. The study analyzes associations between the types of disputes and causes, and also identifies those with a high level of associations. It also presents the outcomes of more systematic analysis compared to descriptive statistics just based on frequencies. Through the analysis of the data cases, the study proposes the directions to resolve the causes of disputes from client's perspectives. It can assist to improve understandings of the relationships between the types of disputes and causes and to pro-actively manage the disputes of construction projects.

A Study on the Risks Excluded of Marine Insurance Claims (해상보험 클레임의 면책위험에 관한 고찰)

  • Jung Sung-Hoon;Choi Hyuk-Jun
    • Journal of Arbitration Studies
    • /
    • v.15 no.2
    • /
    • pp.125-162
    • /
    • 2005
  • This paper examined excluded risks of insurer in marine insurance generally, and found out the existing studies on the excluded risks, which were accomplished partially and fragmentarily, to conduct a comparative analysis of marine insurance based on the general flow of claim adjustment. It arranges the existing studies to settle a dispute between the parties -insurer and assurer- and studies the excluded risk based on risk change of the insured by analyzing characteristic and class of security violation, and meaning, form, effect of risk change. it inquires into and analysis cases of the Korean Supreme Court related to the exclusion and illegal act of marine insurance to compare marine theorists' opinion with commercial law.

  • PDF

Economic Evaluation of Early Detection System for Warranty Issues (품질보증 이슈 조기감지 시스템의 경제성 평가)

  • Jung, Sung-Hwan
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • An early detection system for warranty issues periodically collects customers' claim data and automatically reports alarms about emerging issues based on statistical algorithms. It helps companies to reduce an issue definition time and save the handling cost of warranty claims. This paper provides an evaluation framework to validate the economic effect of an early detection system project. For this purpose, we present economical index of a project with explicit formulas such as ROI(return on investment), PP(payback period), NPV(net present value), PI(profitability index) and IRR(internal rate of return) and analyze the sensitivities of the index according to the variation of project input parameters. The proposed analysis framework is expected to be used for evaluating economic values of various system integration projects.