BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Verification of the Entire Process Model through Green Remodeling Pilot Project (그린리모델링 실증 시범사업을 통한 프로세스의 전 과정에 대한 검토)

  • Jeong, Jin-Woo;Ju, Jung-Hoon;Lee, Keon-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.3
    • /
    • pp.37-45
    • /
    • 2018
  • The purpose of this study is to review all phases of the pilot project through the implementation of the Green Remodeling process. The Green Remodeling process was developed to facilitate anyone's ease of use. The Green Remodeling process consists of five phases : project, plan, design, construction, operation and maintenance. Each stage simulation was performed and the energy saving was predicted. Architects can easily obtain energy information of a building. In this study, we propose a green remodeling proposal plan through pilot project. Ultimately, the spread of green remodeling will greatly contribute to achieving the goal of reducing greenhouse gas emissions.

Improving the Contractor-subcontractor Relationship Through Partnering on Construction Projects in Zambia

  • Mudzvokorwa, Tafadzwa;Mwiya, Balimu;Mwanaumo, Erastus M.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2020
  • With the increased dependence on subcontracting in the construction industry, the operational relationship between main contractors and subcontractor plays an imperative role in successful project delivery. Consequently, improving this relationship increases the probability of project success and enhancing project performance. A wide range of research has confirmed that partnering improves the main contractor-subcontractor relationship. Though the positive impact of partnering on project performance is supported by a plethora of evidence, the guiding theory on practical partnering process steps is limited. The study aimed at improving subcontracting in the construction industry through a partnering process relevant to Zambia guided by factors obtained from industry expects. Questionnaire surveys and Semi-structured interview were adopted to investigate the perception of construction industry professionals and academics towards the main contractor-subcontractor relationship along with improvement factors. The findings showed that the relationship between main contractors and subcontractors on most projects in Zambia is unsatisfactory therefore justifying attention. Top factors that can enhance the main contractor-subcontractor relationship were identified. From the factors deduced and guidelines on partnering best practices, a project partnering model was developed.

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF