• 제목/요약/키워드: Circuit Breaker failure

검색결과 46건 처리시간 0.022초

AT 급전계통 고장 모의시험장치를 활용한 임피던스 계전방식의 성능검증 (Performance verification on the Impedance Relay Method using Failure Simulator of AT Feeding System)

  • 김완일;이계승;정노건;김재문
    • 전기학회논문지
    • /
    • 제67권2호
    • /
    • pp.325-330
    • /
    • 2018
  • In this paper, we investigated the impedance method for searching fault detection point in case of an accident in the AC electric railway AT feeding system. For this purpose, simulation circuit modeling and prototype hardware are made based on the known numerical analysis. As a result of simulation modeling of the feeding system based on the numerical analysis of the impedance method confirmed that the modeling was properly implemented with an average error rate of 0.07%. Also, as a result of fault event by hardware simulator, it was confirmed that the breaker operation time is shortened and the fault current is decreased while the voltage is close to the supply voltage in the transient state as the point of the fault accident moves away from the substation(SS).

배전계통 기기 유지보수를 위한 RCM 모델 (Reliability-Centered Maintenance Model for Maintenance of Electric Power Distribution System Equipment)

  • 문종필;손진근
    • 전기학회논문지P
    • /
    • 제58권4호
    • /
    • pp.410-415
    • /
    • 2009
  • With the implementation of electric power industry reform, the utilities are looking for effective ways to improve the economic efficiency. One area in particular, the equipment maintenance, is being scrutinized for reducing costs while keeping a reasonable level of the reliability in the overall system. Here the conventional RCM requires the tradeoff between the upfront maintenance costs and the potential costs of losing loads. In this paper we describe the issues related to applying so-called the "Reliability-centered Maintenance" (RCM) method in managing electric power distribution equipment. The RCM method is especially useful as it explicitly incorporates the cost-tradeoff of interest, i.e. the upfront maintenance costs and the potential interruption costs, in determining which equipment to be maintained and how often. In comparison, the "Time-based Maintenance" (TBM) method, the traditional method widely used, only takes the lifetime of equipment into consideration. In this paper, the modified Markov model for maintenance is developed. First, the existing Markov model for maintenance is explained and analyzed about transformer and circuit breaker, so on. Second, developed model is introduced and described. This model has two different points compared with existing model: TVFR and nonlinear customer interruption cost (CIC). That is, normal stage at the middle of bathtub curve has not CFR but the gradual increasing failure rate and the unit cost of CIC is increasing as the interruption time is increasing. The results of case studies represent the optimal maintenance interval to maintain the equipment with minimum costs. A numerical example is presented for illustration purposes.

회생에너지 저장시스템이 제동 브랜딩 안정화에 미치는 영향 (The Effect of Regenerative Energy Storage System on Stabilization of Electro-Pneumatic Braking Blending)

  • 김규중;이근오
    • 한국안전학회지
    • /
    • 제25권5호
    • /
    • pp.15-21
    • /
    • 2010
  • Regenerative Energy Storage System(ESS) is a system that saves regenerative energy which generated instantly in the regenerative braking of Electric Multiple Unit(EMU) and disappear, and reuse the stored energy when EMU is in powering. Such system related to a research field of renewable energy which emerged concerning climate change and high oil prices. In the case of existing domestic rolling stock, about 25% to 30% of generated regenerative energy is restored to power source and is regarded as direct factor of raising catenary voltage. Such rapid change of catenary voltage is a cause of the failure of EMU's electronic equipment and lowering its reliability and is also a cause of train's fault occurred by tripping circuit breaker. In this paper, we intend to investigate the effect on blending characteristics of electric-braking and pneumatic-braking whether the regenerative energy storage system is used or not in urban transit DC 1,500V feeding system, while trains run. And we also intend to investigate its effect on stabilization of the blending, fluctuation of catenary voltage and various electric equipments.

수력발전소 자동제어설비의 현대화 (The Modernization of Automatic Control facilities of Hydro Power Plant)

  • 권오극;권영준;송영철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.69-70
    • /
    • 2008
  • Automatic control systems(AVR, Governor, Synchronizer) installed $1970{\sim}1980$ in K-water were considered to be rehabilitated around 2000. Moreover, Korea Power Exchange market system was changed from PPA (Power Purchase Agreement) to a bidding system. Therefore, depending on the power quality, the power provider could achieve additional profits. It is the excitation system and governor that have the functions of enhancing power necessities. During the 20 to 30 years of generator operation, there were many major and minor problems. Examples are SCR burnout (Andong: Excitation system), hunting (Imha: governor), field circuit breaker failure (Chungju 1st: excitation system), the rise of leakage current (Chungju 2nd: excitation system), power supply burnout (Chungju 2nd: governor). These are the typical examples of malfunction which hindered the generator operation and, consequently, diminished the profit of power business. In order to satisfy the needs of the power market and prevent malfunctions mentioned above, the rehabilitation of AVRs and governors were executed. A new system was made to have the flexibility of ancillary service (GF, AGC, etc.), PSS function. With user friendly HMI software, it is more convenient for the operator to fulfill suitable maintenance. It was possible to connect SCADA system by opening protocol of AVR, governor for the efficiency of operation and maintenance.

  • PDF

25.8kV급 GIS에 Matrix System을 적용한 전력설비 최적화 연구 (A Study on Optimization of Electric Power Facilities Applied Matrix System at 25.8kV GIS)

  • 이양미;남재우;김철환
    • 전기학회논문지
    • /
    • 제66권3호
    • /
    • pp.507-512
    • /
    • 2017
  • Recently, more electric power facilities have been miniaturized and it is noted that the facilities maintenance will be essential through operation optimization. In this paper we applied and examined the operation optimization of electric power facilities by applying Matrix system which can improve reliability to minimize outage and recover failure rapidly when blackouts happen at 25.8kV Gas Insulated Switchgear(GIS). The fundamental problem for facilities maintenance of GIS can happen due to indeterminable internal state in real time. Matrix optimization organizes action states in all containers which contain pressurized $SF_6$ Gas such as circuit breaker, disconnector switch, bus for utilizing them each area. Then, we connect it with power system to monitor and control internal state remotely in real time, and we can minimize blackout zone or outage. Considering above process, we improved stability of overall facilities.

HIL 기반 LNGC PMS 시뮬레이터의 성능 검증 (HIL based LNGC PMS Simulator's Performance Verification)

  • 이광국;박재문
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2016년도 추계학술대회
    • /
    • pp.219-220
    • /
    • 2016
  • 전력 관리 시스템인 PMS는 선박 통합 제어 시스템에서 중요한 역할을 한다. 본 연구에서는 액화 천연가스선의 PMS를 검증하기 위해서 실시간 HIL 시뮬레이션을 구현한다. 시뮬레이터는 터빈 발전기 디젤발전기, 차단기, 주요 3상 부하로 구성되고, 이들 모델은 MATLAB/Simulink로 구현한다. 더불어 FPGA 기반 제어 콘솔과 메인 스위치보드를 구축하여 선박에 탑재 되어 있는 LNGC PMS 제어 환경을 모사 한다. PMS 기능 검증을 위해 LNGC 내 주요 전력소모원 대비 두 가지 전력 분배 모드를 테스트 케이스로 수행한다. 그 결과 본 연구에서 제안한 시스템은 PMS 시뮬레이터로써 시운전 테스트뿐만 아니라 오류 주입 검증용으로 사용될 것이다.

  • PDF