• Title/Summary/Keyword: Cilium media

Search Result 6, Processing Time 0.016 seconds

Proposed Operating Parameters for Advanced Treatment Process using a Cilium Media BNR Process (섬모상담체를 이용한 고도처리공정의 운전인자 도출)

  • Ahn, Yoon Hee;Park, Chan Gyu;Ko, Kwang Baik;Lee, Kang Soo
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.761-765
    • /
    • 2007
  • The study were conducted in order to investigate the effect of operating parameters including the internal recycle (nitrification return) rates, hydraulic retention times (HRTs) and temperature when using a cilium media method. The first experiment was for evaluating the effect of HRT (12 hr, 10 hr, 8 hr, 6 hr, 4 hr). The second experiment was for analyzing effect of internal recycle rate (100%, 200%, 300%, 400%). As a result of the first experiment, BOD was removed to 97~98% for 6~8 hr HRT. Effluent water quality was not significantly influenced with HRT within that range. However the nitrogen removal was sensitive to HRT. T-P removal efficiency was invariable at various HRTs. The average BOD removal efficiency was about 97% in spite of change of internal recycle rate while T-N removal efficiency was increased at the internal recycle rate of 100~200%, but invariable at the internal recycle rate of 200~300%.

The Nitrogen Removal of Municipal Wastewater with HRT using CNR Process (CNR공법의 체류시간에 따른 도시하수의 질소제거)

  • 김영규;양익배;김인배
    • Journal of Environmental Health Sciences
    • /
    • v.26 no.3
    • /
    • pp.98-102
    • /
    • 2000
  • The aim of this study was to evaluate on the removal effect of total nitrogen in municipal wastewater by decreasing hydraulic retention time(HRT) from 6 hour to 4 hour on CNR process. CNR-A(Cilia Nutrient Removal) is the process combining A2/O process with cilium media of H2L corporation. The removal efficiencies for T-N were 63.1% in A-1 reactor, and 73.5% in A-2 reactor and 77.0% in A-3 reactor. The specific nitrification(g-NH3-N/g-MLVSS.d) of Oxic in CNR-A process was 0.07-0.32. The specific denitrification in Anoxic and the specific nitrification inOxic was higher in HRT 4 hour because of optimum F/M ratio.

  • PDF

The Nitrogen and Phosphorus Removal of Municipal Wastewater with CNR Process using Influent as a Carbon Source (유입수를 탄소원으로 이용한 CNR공법의 질소, 인의 제거특성)

  • 김영규;김인배;이영준
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.3
    • /
    • pp.81-85
    • /
    • 2001
  • The aim of this study was to evaluate on the removal effect of total nitrogen and posphorus in municipal wastewater by decreasing hydraulic retention time(HRT) from 6 hour to 4 hour on CNR process using influent as a Carbon Source. CNR(Cilium Nutrient Romoval) is the process combining $A^2$/O process with cilium media of H2L corporation. The removal efficiencies for BOD$_{5}$, T-N and T-P were 81.1%, 61.4%, 61.4%, respectively. The removal efficiency of nitrogen and posphorus were low by decreasing hydraulic retention time(HRT) from 6 hour to 4 hour on CNR process.s.

  • PDF

Development of Nitrogen and Phosphorus Removal Technology using Cilium Media for Municipal Wastewater (CNR공법을 이용한 하수처리장의 질소, 인제거를 위한 상용화 기술개발 - 기존 활성슬러지 공법으로 운영중인 하수처리장의 탈질, 탈인 제거기술개발)

  • 김영규;정문식;장덕진;서정범;김현용;김민호;김인배;김영주;차지영;장성환;양익배;김대명;김수복
    • Environmental engineer
    • /
    • s.169
    • /
    • pp.65-73
    • /
    • 2000
  • 1999년 G-7 환경공학기술개발사업의 일환으로 CNR공법을 이용한 하수처리장의 탈질, 탈인을 위한 상용화기술개발연구의 결과를 요약하면 다음과 같다. 1999년 3월부터 1999년 12월 16일까지의 실험기간 중 1톤 PILOT 반응조와 2000년 1월 18일부터 2000년 4월 30일까지의 실험기간 중 구리하수처리장에 설치한 50톤 PILOT의 운전결과는 다음과 같다. CNR공법은 우리나라의 일반적인 하수성상에서 운전관리가 원활하면 동절기와 유기물 부

  • PDF

Nitrogen and Phosphorus Removal of Municipal Wastewater with Temperature in CNR Process (섬모상담체를 이용한 혐기, 무산소, 호기공정(CNR공법)의 온도변화에 따른 하수의 질소, 인의 제거특성)

  • 김영규;양익배;김인배;이영준
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.1
    • /
    • pp.112-118
    • /
    • 2001
  • The aim of this study was to evaluate on the removal effect of total nitrogen and phosphorus in municipal wastewater with temperature change from 1$0^{\circ}C$ to 24$^{\circ}C$ in CNR(Cilia Nutrient Removal) process. CNR process is the process combining $A^2$/O process with cilium media of H2L company. The removal efficiencies for T-N were found to be 57.9% at 1$0^{\circ}C$ below, 53.7% at 10-2$0^{\circ}C$, 52.2%at 20-24$^{\circ}C$ and 44.4% over 24$^{\circ}C$ respectively. The removal efficiencies for T-P were 53.3% at 1$0^{\circ}C$ below, 59.1% at 10-2$0^{\circ}C$, 72.4% at 20-24$^{\circ}C$ and 50.0% over 24$^{\circ}C$ respectively. The specific nitrification rate (kg NH$_3$-N/kg MLSS.d) of Oxic basin was 0.088 and 0.053 at 1$0^{\circ}C$ below, 0.077 at 10-2$0^{\circ}C$, 0.097 at 20-24$^{\circ}C$ and 0.088 over 24$^{\circ}C$ respectively. The specific denitrification rate (kg NH$_3$-N/kg MLSS.d) in anaerobic and anoxic was 0.013, 0.008 respectively.

  • PDF

Operation Parameters on Biological Advanced Treatment of Phenolic High-Strength Wastewater (페놀계 고농도 유기성 폐수의 생물학적 고도처리 운전인자)

  • Hong, Sung-Dong;Park, Chul-Hwi
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.4
    • /
    • pp.797-806
    • /
    • 2000
  • The objectives were to compare the biodegradable threshold concentrations of phenol with the different composition of the influent carbon source and examine the SMA (Specific Methanogenic Activity)and the possibility of simultaneous removal of high-strength organics and nitrogen compounds in UASB(Upflow Anaerobic Sludge Blanket) - PBR(Packed Bed Reactor) process. The results showed that UASB reactors were efficient to remove phenol and phenol + glucose from synthetic wastewater. At phenol conc, of 600 mg/L and SCOD conc. of 2100 mg/L in UASB reactor(with only phenol as substrate), the removal efficiencies of phenol and SCOD were over 99% and 93% respectively, under MLVSS of 20 g. The activity of microorganism was $0.112g\;phenol/g\;VSS{\cdot}d$, $0.351g\;SCOD/g\;VSS{\cdot}d$. The gas production rate was $0.115L/g\;VSS{\cdot}d$ and $CH_4$ content in gas was about 70%. At phenol conc. of 760 mg/L and SCOD conc. of 4300 mg/L in UASB reactor( with phenol + glucose as substrates), the removal efficiencies of phenol and of SCOD were over 99% and 90% respectively, under MLVSS of 20 g. The activity of microoganism was $0.135g\;phenol/g\;VSS{\cdot}d$, $0.696g\;SCOD/g\;VSS{\cdot}d$. The gas production rate was $0.257L/g\;VSS{\cdot}d$ and $CH_4$ content in gas was about 70%. Serum bottle test showed that the activity of granule was inhibited over 1600 mg/L phenol conc, and denitrification and methanogenesis simultaneously took place in UASB granules under co-substrates conditions. PBR reactor packed with cilium type media, was efficient in nitrification. In condition of $0.038kg\;NH_4-N/m^3-media{\cdot}d$. 10~12 mg/L phenol conc. and 200~500 mg/L SCOD conc., nitrification efficiency was over 90% and phenol removal efficiency was over 98%.

  • PDF