• Title/Summary/Keyword: Catenary System

Search Result 411, Processing Time 0.029 seconds

The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System (400km/h급 전차선로 시스템의 시범적용 구간선정 연구)

  • Ryoo, Hyang-Bok;Jang, Sa-Sool;Park, Jae-Woong;Lee, Hae-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

Study on the current collection & vibration characteristics of the KHST's pantograph through trial running test up to 350km/h (한국형 고속열차의 350km/h 본선 주행시험을 통해 본 고속열차용 팬터그래프의 이선 특성과 동적 특성 고찰)

  • Mok, Jin-Yong;Park, Chan-Kyoung;Park, Choon-Soo;Kim, Ki-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.459-462
    • /
    • 2005
  • The KHST(Korean High Speed Train) which had been developed by through 'G7-R&D project' has succeeded trial running test up to 350km/h on the Kyoung-Bu High Speed Track in December 16th, 2004. In order to evaluate the function and characteristics of KHST, various experimental conditions have been considered and conducted. In this paper, measured current collection characteristics and dynamic behaviors of KHST's pantograph are analysed over 300 to 350km/h in running speed of KHST. A measuring system developed and installed on the KHST for measuring the performance and mechanical characteristics of the KHST's pantograph was used for this trial running test and eventually, we proofed that KHST has a remarkable and stable current collection characteristics as it had been designed.

  • PDF

A Study on Peak Power Reduction using Regenerative Energy in Railway Systems through DC Subsystem Interconnection

  • Jung, Seungmin;Lee, Hansang;Kim, Kisuk;Jung, Hosung;Kim, Hyungchul;Jang, Gilsoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.1070-1077
    • /
    • 2013
  • Owing to the consistent increase in energy efficiency issues, studies for improving regenerative energy utilization have been receiving attention in the Urban DC railway systems, where currently, the utilization of regenerative energy is low due to the lack of a specific plan for using this energy. The regenerative energy in railway systems has a low efficiency problem which results in the increase of the catenary voltage and a possibility to create problems to the electrical devices connected to the system. This paper deals with the power integration of large urban railway subsystems to improve regenerative energy utilization where the railway subsystems are integrated with other railway subsystems to improve the energy efficiency. Through the case studies, to find the realistic effect of integrated operation, the Seoul Metro subsystems, namely Line 5 and Line 7, has been applied. Also, evaluation for the electricity cost saving has been performed by using KEPCO electricity cost table.

Monotonic Loading Tests of RC Beam-Column Subassemblage Strengthened to Prevent Progressive Collapse

  • Kim, Jinkoo;Choi, Hyunhoon
    • International Journal of Concrete Structures and Materials
    • /
    • v.9 no.4
    • /
    • pp.401-413
    • /
    • 2015
  • In this study the progressive collapse resisting capacity of a RC beam-column subassemblage with and without strengthening was investigated. Total of five specimens were tested; two unreinforced specimens, the one designed as gravity load-resisting system and the other as seismic load-resisting system, and three specimens reinforced with: (i) bonded strand, (ii) unbonded strand, and (iii) side steel plates with stud bolts. The two-span subassemblages were designed as part of an eight-story RC building. Monotonically increasing load was applied at the middle column of the specimens and the force-displacement relationships were plotted. It was observed that the gravity load-resisting specimen failed by fractures of re-bars in the beams. In the other specimens no failure was observed until the maximum displacement capacity of the actuator was reached. Highest strength was observed in the structure with unbonded strand. The test result of the specimen with side steel plates in beam-column joints showed that the force-displacement curve increased without fracture of re-bars. Based on the test results it was concluded that the progressive collapse resisting capacity of a RC frame could be significantly enhanced using unbonded strands or side plates with stud bolts.

Basic analysis of suitability for Toughened Glass Stem Insulator applied in the high speed catenary system (고속전차선로 유리애자 현장 적합성 기초연구)

  • Jeon, Yong-Joo;Ryu, Yong-Tae;Lee, Gi-Chun;Lee, Yoo-Kyung
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1067-1068
    • /
    • 2008
  • The Operation of high speed train in year 2004 bring about a great change in railroad industry. Especially in railroad construction field we have acquired great Know-how. And up to now we are building up operation skills. But the high speed train system are totally imported, so it is necessary to investigate some of the equipment based on our own environment. In case of Toughened Glass Stem Insulator, we don't have any application case in domestic and limited in abroad. So there must be some characteristic estimation. The estimation was made in three different ways. First electrical field cause, Second physical field cause and finally in circumstance cause. In Electrical field cause, amplitude and number of time for abnormal peak voltage data are collected. And in physical field cause, amplitude and trend of vibration in to the insulator are examined. And I circumstance cause, possibility of flying gravel and ice clod are investigated. Through this basic data suitability for Toughened Glass Stem Insulator using in domestic will be accumulated.

  • PDF

Basic analysis of suitability for Toughened Glass Stem Insulator applied in the high speed catenary system (고속전차선로 유리애자 현장 적합성 기초연구)

  • Jeon, Yong-Joo;Ryu, Young-Tae;Lee, Gi-Chun;Lee, Yoo-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.423-427
    • /
    • 2008
  • The Operation of high speed train in year 2004 bring about a great change in railroad industry. Especially in railroad construction field we have acquired great Know-how. And up to now we are building up operation skills. But the high speed train system are totally imported, so it is necessary to investigate some of the equipment based on our own environment. In case of Toughened Glass Stem Insulator, we don't have any application case in domestic and limited in abroad. So there must be some characteristic estimation. The estimation was made in three different ways. First electrical field cause, Second physical field cause and finally in circumstance cause. In Electrical field cause, amplitude and number of time for abnormal peak voltage data are collected. And in physical field cause, amplitude and trend of vibration in to the insulator are examined. And I circumstance cause, possibility of flying gravel and ice clod are investigated. Through this basic data suitability for Toughened Glass Stem Insulator using in domestic will be accumulated.

  • PDF

Characteristics of Track Behaviors according to Accelerated Tilting Train Speed (틸팅차량 증속에 따른 기존선 궤도의 거동 특성)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1653-1661
    • /
    • 2008
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.

  • PDF

A Study on the Rail Pone of Transition Curve Track to Speed Up of Tilting train (틸팅차량 완화곡선 증속 주행시 궤도작용력 검토)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.529-538
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.

  • PDF

Nonlinear Motion Analysis of FPSO with Turret Mooring System (터렛계류된 FPSO의 비선형 운동 해석)

  • Lim, Choon-Gyu;Lee, Ho-Young
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.161-166
    • /
    • 2002
  • As offshore oil fields move towards the deep ocean, the oil production systems such as FPSO are being built these days. Generally, the FPSO is moored by turret mooring lines to keep the position of FPSO. Thus nonlinear motion analysis of moored FPSO must be carried out in the initial design stage because sea environments affect motion of it. In this paper the mathematical model is based on the slow motion maneuvering equations in the horizontal plane considering wave, current and wind forces. The direct integration method is employed to estimate wave loads. The current forces are calculated by using mathematical model of MMG. The turret mooring forces are quasi-statically evaluated by using the catenary equation. The coefficients of a model for wind forces are calculated from Isherwood's experimental data and the variation of wind speed is estimated by wind spectrum according to the guidelines of API-RP2A. The nonlinear motions of FPSO are simulated under external forces due to wave, current, wind including mooring forces in time domain.

  • PDF

The development of wheel-rail contact module for the next generation express train (차세대 고속철 해석을 위한 훨레일 모듈 개발)

  • Yoon, Ji-Won;Park, Tae-Won;Lee, Soo-Ho;Cho, Jae-Ik
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.225-230
    • /
    • 2009
  • From the view point of railway vehicle dynamics, the interaction between wheel and rail have an huge effect on the behavior of the vehicle. This phenomenon is an unique motion, only for railway vehicles. Furthermore, close investigation of the backgrounds of the interaction is the key to estimate the dynamic behavior of the vehicle, successfully. To evaluate the model including flexible bodies such as car body and catenary system of the next generation express train, it is necessary to develop proper dynamic solver including a wheel rail contact module. In this study, wheel-rail contact module is developed using the general purpose dynamic solver. First of all, the procedure for calculation of the wheel-rail contact force has been established. Generally, yaw angle of the wheelset is ignored. Sets of information are summarized as tables and splined for further uses. With this information, normal force and creep coefficient can be extracted and used for FASTSIM algorithm, which has been shown good reliability over years. Normal force and longitudinal, lateral force at the contact surface are also calculated. Those data are verified by commercial railway simulation program 'VAMPIRE'. This procedure and program can offer a basic process for estimation of the dynamic behavior and wear of the wheel-rail system, even while running on the curved rail. Finally, multi-dimensional inspection tool will be developed including the prediction of the derailment.

  • PDF