Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

A STUDY ON THE LIFE-CYCLE FOR SELECTING A GRATING

  • Yun-Sik Kim;Dong-Wan Kang;Taehoon Hong;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1189-1194
    • /
    • 2009
  • A gutter-shaped U grating is a facility that is installed at the sides of a road to provide pedestrians with a rainwater-free road. The previous studies on this facility focused mainly on the progress of the efforts that are being made to improve its performance and interception efficiency so as to prevent damages in regional areas due to the heavy rains caused by climate change. The studies on its maintenance, however, are still inadequate. Therefore, this study was conducted to analyze and compare the life cycle costs and performance evaluations of the steel and magic gratings, which are installed in apartments. The results of the study show that the replacement period and rate of gratings differ depending on where they are installed. The initial capital investment cost of a magic grating installed at a road where many vehicles pass is quite high, but in terms of its maintenance and entire-life-cycle costs, its total expenses are lower than those of a steel grating. The results of this study are expected to serve as preliminary data for the selection of an adequate grating that is suitable for particular places in the design phase of construction projects.

  • PDF

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.

Development of System Dynamics model for Electric Power Plant Construction in a Competitive Market (경쟁체제 하에서의 발전소 건설 시스템 다이내믹스 모델 개발)

  • 안남성
    • Korean System Dynamics Review
    • /
    • v.2 no.2
    • /
    • pp.25-40
    • /
    • 2001
  • This paper describes the forecast of power plant construction in a competitive korean electricity market. In Korea, KEPCO (Korea Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company in Korea at present time. Fossil power companies are scheduled to be sold to private companies including foreign investors. Nuclear power company is owned and controlled by government. The competition in generation market will start from 2003. ISO (Independence System Operator will purchase the electricity from the power exchange market. The market price is determined by the SMP(System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners such as government are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies such as nuclear and coal plants. Large unclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT(Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investors behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investors behavior can be applied to the new investments for the power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate production. A computer model was developed to sturdy the possibility that construction will appear in waves of boom and bust in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester(MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford(Energy Policy, 1999). This model was designed based on the Energy Policy results(Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach. Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as unclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investment by investors in the market. This model may be used to learn if government investment in new unclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of unclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market.

  • PDF

DECISION SUPPORT SYSTEM FOR SUBURBAN STATION REHABILITATION

  • TaeHoon Hong;Sangyoub Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.855-861
    • /
    • 2005
  • Every public agency governing infrastructure has to plan effectively for rehabilitation of existing facilities within the constraints of the capital program. Numerous technical, social, political, financial, and management constraints govern the decision to rehabilitate a facility. However, without a systematic procedure for selecting facilities for rehabilitation, within the prevailing constraints, it is possible that the funds available for rehabilitation might be suboptimized. Therefore, a decision support system that assists the user in selecting facilities for rehabilitation while considering the technical, social, financial, and political and management constraints will be useful in the decision-making process. This paper compares the Analytical Hierarchy Process (AHP) with the Swing Weight method used to prioritize functional criteria for suburban station rehabilitation. This paper also contains a brief discussion about the relevance of the Multi Attribute utility theory in developing a decision model for the problem at hand. The results of this paper provides the user with a decision support system that would prioritize the stations in order of their weights obtained by a systematic evaluation of various criteria and sub-criteria involved in the decision making process

  • PDF

Management performance analysis using the DEA model of the food waste recycling facility (음식물류 폐기물 자원화 시설 DEA모형을 활용한 경영성과 분석)

  • Jeoung, IlSeon;Kim, Youngkyun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.27 no.4
    • /
    • pp.105-114
    • /
    • 2022
  • As the national income level is improving, housing urbanization and economic speed are progressing rapidly, household waste and food waste are rapidly increasing. The "Waste Management Act" (founded in 1991) introduced the volume-based household waste system in 1995, and even after implementation, the odor of food waste and the prompt disposal process continue to be a social problem.For this reason, the food waste recycling business is attracting attention. In this paper, regarding the role of resource recycling such as feed, compost, and other resources of food waste, this thesis aims to reduce the inefficiency of the recycling process. Data Envelopment Analysis (DEA) of the relationship between inputs and outputs of 33 facilities nationwide, excluding facility data (insufficient) among 394, (238 public, and 156 private ones), as of the end of 2020, which is running a domestic resource recycling project This study was conducted to investigate the important role in the relative management performance of food waste recycling facilities.It was hypothesized that the influence of business history, facility capacity, capital, and machinery of a company running a food waste recycling business on sales was tested.

An Improvement Method through Build-Transfer-Lease (BTL) Problem Analysis from the Special Purpose Company (SPC) Perspective (SPC 관점에서의 BTL사업 문제점 분석을 통한 개선방법)

  • Kim, Soo-Yong;Son, Myung-Chan;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.167-175
    • /
    • 2013
  • In 2005, the government introduced BTL(Build-Transfer-Lease) projects as one of the methods of private investment in infrastructure. In a BTL project, a private company builds a public facility and leases it to the government to withdraw its invested capital. But there appear several problems with it due to a short period of preparation and lack of experiences. Specifically, private companies that plan to participate in this project have to take a risk since serious problems are likely to take place because of unrealistic estimation of construction costs, etc., and they finally avoid participating in this project. A case study was made over advanced countries, Japan and the United Kingdom, to find out how to resolve the problems, and rational 7 improvement method were presented from a perspective of Special Purpose Company (SPC), which could be accepted by both of SPC and government agencies. The findings of the study are expected to provide workable solutions to BTL projects from a standpoint of private companies to facilitate the rational improvement of BTL projects, and this study is ultimately expected to stimulate the active participation of SPC to make a contribution to the vitalization of domestic BTL projects.

Minimization of Pump Running Cost in the Large-scale Water Supply System (광역상수도 계통의 Pump 운전비용 최소화)

  • Lee, Gwang-Man;Kang, Shin-Uk;Kim, Soo-Myung
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.9
    • /
    • pp.759-771
    • /
    • 2009
  • The electricity cost of pumping system accounts for a large part of the total operating cost for long distance water supply networks. This study presents a method based on dynamic programming for establishing an joint optimal operation of pumps and storages system on a hourly basis. Analysis is taken of the relative efficiencies of the available pumps, the structure of the electricity tariff, the consumer-demand pattern, and the storage characteristics and operational constraints of the pipe. The possible system objectives and constraints are described. An application of the method to the existing Yangju Water Supply System consisted of two pump station and 5 storage pools under the condition of expanding pumping facility in the part of the Capital Area Water Supply System is presented, showing that considerable electricity cost savings are remarkable. The approach was found to be implementable in real system operation and large-scale water supply system design in respect of minimizing life-cycle total cost.

Development of Road Tunnel Ventilation System with Electrostatic Precipitator (도로터널용 전기집진시스템 개발)

  • Kim, Jong-Ryul;Weon, Jong-Oung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.80-83
    • /
    • 2008
  • As SOC (Social Overhead Capital) has been expanded, the highway road construction has been accelerated and city road system has been more complicated. So, long road tunnels have been increased and traffic flow rate also has been raised. Accordingly, the exhausting gas of vehicle cars seriously deteriorates the tunnel inside air quality and driving view. In order to improve tunnel inside air quality, we may need to introduce a compulsory ventilation system as well as natural ventilation mechanism. The natural ventilation mechanism is enough for short tunnels, meanwhile longer tunnels require a specific compulsory ventilation facility. Many foreign countries already have been devoting on development of effective tunnel ventilation system and especially, some European nations and Japan have already applied their developed tunnel ventilation system for longer road tunnels. More recently, as the quality of life improved, our concerns about safety of driving and better driving environment have been increased. In order to obtain clearer and longer driving view, we are more interested in EP tunnel ventilation system in order to remove floating contaminants and automobile exhaust gas. Evan though it's been a long time since many European countries and Japan applied more economical and environment-friendly tunnel ventilation system with their self-developed Electrostatic Precipitator, we are still dependant on imported system from foreign nations. Therefore, we need to develop our unique technical know-how for optimum design tools through validity investigation and continuous possibility examination, eventually in order to localize the tunnel ventilation system technology. In this project, we will manufacture test-run products to examine the performance of system in order to develop main parts of tunnel ventilation system such as electrostatic precipitator, high voltage power generator, water treatment system, etc.

  • PDF

How to Improve R&D Pre-Feasibility Study System (연구개발 분야 예비타당성 제도의 개선방향)

  • Choi, Seok-Joon;Kahn, Hyung-Sik
    • Journal of Korea Technology Innovation Society
    • /
    • v.11 no.2
    • /
    • pp.287-313
    • /
    • 2008
  • Even though the pre-feasibility study was introduced in 1998, it mainly has focused on transportation social overhead capital(SOC) such as road and railroad. Last year, however, the government newly launched R&D project area for the pre-feasibility study. This paper tries to analyze the pre-feasibility study methodology and system that applied to R&D facility, cluster, and sized R&D infrastructure projects. In depth study of economic, policy, and AHP analysis, this paper shows that the preliminary feasibility study have some caveats and suggests a way of improvement for making up for limitation. Main suggestions are as follows; First, to improve the fit in R&D sector analysis, using consistent method is important. Second, technology analysis is essential for R&D evaluation. Third, technology experts should take part in AHP analysis.