A study on the Highspeed Railway Route Selection -Focusing on 4 design tools- (수도권 고속철도 노선선정 연구 -설계4공구를 중심으로-)

  • Kim, Jong-Seok;Kim, Woo-Je
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.200-207
    • /
    • 2011
  • The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.

  • PDF

Present Status and Prospect of Transmission Line Constructions (송전선로 시공기술의 현황과 전망)

  • Lee, H.K;Jang, H.C.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1388-1390
    • /
    • 1999
  • Environments of electric power industries are fastly changing due to the WTO, opening of the capital market and free trade. Accordingly, it is very important to invest in technical developments for securing international competitive power. But our construction techniques in T/L are insufficient in comparing with the advanced countries. This paper suggests the status and prospect of construction techniques of domestic and foreign countries in T/L, including developing prospects of T/L constriction.

  • PDF

A Study on the Construction and Application of Social Capital Scale in Social Welfare Organizations (사회복지조직의 사회적 자본 척도 구성과 그 적용에 관한 연구)

  • Moon, Young-Joo
    • Korean Journal of Social Welfare Studies
    • /
    • v.42 no.3
    • /
    • pp.381-407
    • /
    • 2011
  • This study set out to construct an social capital scale that could be commonly used by social welfare organizations and to apply it to examine any differences in social capital among social welfare organizations. For those purposes, the study distributed a questionnaire by mail to social welfare organizations in 15 cities and provinces across the nation and conducted latent means analysis. The major research findings were as follows. First, as a result of exploratory factor analysis and confirmatory factor analysis, the validity and reliability in measurement indicators of social capital were proved to be satisfactory level. Secondly, social capital were found to be interpreted at the organizational level through the review of levels of analysis. Meanwhile, the configural, metric, and scalar invariance of social capital scale were confirmed, which indicates that the social capital scale can be commonly applied to social welfare organizations. Finally, latent means analysis was carried out to examine differences among social welfare organizations in the subindexes of social capital including network connectivity, setting and sharing of vision, reciprocal norm, trust and cooperation, and group participation. As a result, there were significant differences among social welfare organizations in network connectivity, reciprocal norm, trust and cooperation and group participation but no statistically significant differences among them in sharing of vision, goal and core value. Those findings led to implications needed to manage of social welfare organizations.

Development of Competency Evaluation Model for Public Private Partnership to Establish Strategies for Overseas Expansion (해외진출 전략 수립을 위한 민관합작투자사업의 역량평가모델 개발)

  • Park, Hwan Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.391-402
    • /
    • 2022
  • With the number of social overhead capital(SOC) projects that introduce private capital on the rise, overseas construction global companies today need to establish and advance their overseas order strategies. In this context, the purpose of this study is to develop the public private partnership(PPP) capacity evaluation model for developing countries and use it for domestic overseas construction companies to establish strategies for overseas expansion. The PPP competency evaluation model analyzes the importance of PPP competency evaluation items and infrastructure environment competency evaluation items through a review of previous studies and an interview survey with overseas construction experts. Through the above analysis results and expert surveys, problems that may occur when overseas construction companies enter the PPP market were derived, and improvement measures were proposed. Countries with a high probability of overseas construction companies entering the PPP market were determined to be those that have a mature PPP system, low risk in construction, and a good entry environment with a high infrastructure market size and growth rate. In addition, a lack of PPP investment experience, the absence of information on the infrastructure environment, and a shortage of PPP experts were identified as problems when entering the overseas construction PPP market. As an improvement measure, it was suggested to enter in cooperation with domestic and foreign companies. In addition, a plan was proposed to develop a curriculum to secure experts in areas such as PPP finance and contracts and to provide PPP information for each country. These findings are expected to contribute to overseas construction companies proposing strategies for entering the overseas construction market and using them for overseas expansion strategies and policy establishment.

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

A Study on the Forecast of Construction Business Failure according to Financial Ratio (재무비율을 이용한 건설기업의 도산 예측)

  • Heo, Woo-Young;Suk, Chang-Mok;Kim, Wha-Jung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.137-142
    • /
    • 2004
  • There was the time of IMF(1998) that management condition of construction business had been the worst. After that time, structural regulation was completed and financial structure was returned to normalcy(2001). At that time, the aim of this paper is that fifteen construction business are researched for process of management condition and capital structure after they is selected as samples for three years, also failure of two-groups is predicted as statistics analysis and multiple discriminant analysis for them. In this paper, It is researched financial statement of business by the forecast experiment of failure and analyzed statistically possibility of failure and success for financial ratio. For them, the fifteen companies of failure and the fifteen companies what were not the failure, for listed company, and the fourteen variables are selected and they are analyzed statistically according to Logit Analysis.

A Railway Construction Efficiency Plan by Using Project Management Information System (프로젝트정보관리시스템을 활용한 철도공사 효율화 방안)

  • Lee, Tai-Sik;Park, Jang-Hee;Kim, Young-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1532-1537
    • /
    • 2004
  • Downtown traffic culture of the car focus of our country have developed. But, it was been interested in railroad to saturation of situation, environmental problem. Also, it is getting interest which is international by departure point of network connecting from Europe to Northeast Asia. Private capital project of railroad is activated but Construction companies payability is real that is worsen day by day. Therefore, Construction companies is destroying element enterprise's inefficiency and the waste, be interested in Project Management Information System as part of information. I wish to approach in efficiency of railway construction by presenting professional construction company's Project Management Information System.

  • PDF

CASE STUDY: CONSTRUCTION LITIGATION FOR THE U.S. NAVAL FACILITIES ENGINEERING COMMAND, 1995-2004

  • Lilin Liang;G. Edward Gibson Jr.
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.693-698
    • /
    • 2005
  • Evaluation of construction claims history can provide insights to improvement opportunities in a capital project portfolio. This study analyzed construction litigation claims extracted from the U.S. Court of Federal Claims (COFC) history involving the U.S. Naval Facilities Engineering Command (NAVFAC) from 1995-2004. Twenty-four total cases were examined over this period. Both "primary" causes and "root" causes were identified and compared to 666 litigation cases reviewed by the Armed Services Board of Contract Appeals (ASBCA). Based on the analysis, strategies for resolving future disputes are recommend using a 'hybrid' process prior to litigation.

  • PDF

The Role of Housing Cooperatives in the Process of Neighborhood Regeneration (도시 빈민 주거지 재생에서 주택협동조합의 역할에 관한 연구)

  • Kim, Ran-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.6
    • /
    • pp.417-427
    • /
    • 2014
  • This study was investigated on the basis of the role of housing cooperatives in sustainable regional business networks(SLEN) in regeneration of residential aged area where the urban poor live. For the analysis, input elements of human capital, social capital, financial capital and ecological capital were examine. For the process, the organization's structure, sustainable business and social networks, and for the result, the stability and community characteristics of the living and the payment possibility of housing construction cost were examined. Through this study, what kinds of issues can be from the housing coop's project in terms of sustainability, and what is the most important factor in order to overcome former mentioned issues were intended to find. For analysis literatures were reviewed and the in-depth interviews and survey were conducted with site visits. The result of this study finds that housing coop have community characteristics through active participation of residents during the regeneration process but the land, as financial and ecological capitals, and housing construction funds were poor. This was investigated that it makes groundless the sustainability of the project and the possibility of the payment. In order to overcome, land concession, inexpensive lental and active funning for housing construction to housing coop is required because housing coop is aiming to supply of social housing for low-income and vulnerable groups.

Stakeholders' Perception of the Causes and Effect of Construction Delays on Project Delivery-A Review

  • Gandhak, Prajyot;Sabihuddin, Syed
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.41-46
    • /
    • 2014
  • Indian Construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved. A unique element of risk in the industry is the manner in which disputes and claims are woven through the fibre of the construction process. Delay is generally acknowledged as the most common, costly, complex and risky problem encountered in construction projects. Because of the overriding importance of time for both the Owner and the Contractor, it is the source of frequent disputes and claims leading to lawsuits. The growing rate of delays is adversely affecting the timely delivery of construction projects. Presently construction industries are facing a lot of problems, considering that a paper assess construction stakeholder's perception to the causes of delays and its effects on project delivery. And also one case study is considered in this paper to elicit responses from construction stakeholders. The primary aim of this paper is to identify the perceptions of the different parties regarding causes of delays, the allocation of responsibilities and the types of delays, and method of minimizing the construction delays.