• Title/Summary/Keyword: Caissons

Search Result 52, Processing Time 0.024 seconds

Change of Water Discharge Capability of Sluice Caisson for Tidal Power Plant According to Installation of Rubble Mound (사석마운드 설치에 따른 조력발전용 수문의 통수성능 변화)

  • Lee, Dal-Soo;Oh, Sang-Ho;Yi, Jin-Hak;Park, Woo-Sun;Cho, Hyu-Sang;Kim, Duk-Gu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.266-269
    • /
    • 2008
  • In this study, the results of experimental investigation on the water discharge capability of sluice caisson for tidal power plant were presented. In particular, the focus of the study was placed on the examination of change in water discharge capability of a sluice caisson according to the installation of rubble mound. For this purpose, a hydraulic experiment was carried out in an open channel flume with a great care to the measurement of discharge and water level in the flume since they greatly affects the estimation of the discharge capability of each sluice caisson. In the analysis, the experimental data of four different sluice models were used, which showed that the installation of rubble mound affects in different manner depending on each sluice caisson model. When each of the four sluice models were placed on the rubble mound respectively, the water discharge increased for one sluice caisson, whereas decreased for other three sluice caissons. Further detailed analysis is needed to quantitatively estimate the influence of installation of rubble mound on the water discharge capability of a sluice caisson.

  • PDF

Unsteady Flow Analysis for the Design of Local Scour Protection by HEC-RAS(UNET) Model in the River Reach Affected by Tide (HEC-RAS 모형에 의한 감조하천구간 부정류 해석 및 세굴보호공 설계)

  • Namgung, Don;Cho, Doo-Chan;Yoon, Kwang-Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1138-1142
    • /
    • 2005
  • The tidal river is a river affected by tide, which causes the water level to rise and fall two times everyday periodically. The local velocity across the river could be very fast because of the cross-sectional characteristics of the river even though it's not a rainy season. Therefore extreme local scour could take place around hydraulic structures such as piers and caissons due to backward flow velocity. For the construction of pier foundation of Ilsan-bridge In the Han River, the field observations were performed to get the velocity and water level. The numerical analysis was performed by HEC-RAS(UNET). The relationship between measured maximum velocity and calculated mean velocity is achieved, which is used to estimate the velocity and water level as the construction is proceeding. Countermeasures for scour were designed with the results of the hydraulic analysis to avoid potential damage during construction work. According to the results of monitoring, the velocity increase after temporary road embankment was negligible, from which it is considered that the degradation of main channel compensated for the constriction of cross-section by embankment.

  • PDF

Case Study for Lateral Displacement of Caisson installed on Deep Soft Soils (대심도 연약지반상에 건설되는 케이슨의 측방변형 사례 연구)

  • Kim, Myung-Hak;Yoon, Min-Seung;Lee, Sang-Wook;Lee, Chea-Kyun;Han, Byoung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.940-950
    • /
    • 2010
  • In case of uneven surcharge like backfill or embankment after constructing caisson applied on the deep soft marine deposits, lateral deformation of soft soils would happen due to plastic deformation of soil particles by increase of excess pore water pressure. Lateral deformation of soil will result in the caisson displacement which affects soft soil-caisson structure safety. Soft soil was improved by soil compaction pile method, and then gravity caisson was installed. Soil deformations were monitored and analyzed with step by step backfill and embankment behind the caisson. Amount and speed of lateral deformation after the installation of caissons were closely related with the time of backfill and embankment. The relationship between maximum lateral displacement($\Delta_y$) in front of caisson and settlement($\Delta_s$) can be expressed as $\Delta_y=(0.0871)\Delta_s+122.95$. Soft soil depth did not affect the lateral displacement of caisson in this study, which can be explained the soft soil improvement under the caisson by S.C.P. method. Substantially the amount and speed of the lateral deformation of caisson were closely related with the uneven surcharging rate behind caisson.

  • PDF

Study on economic performances of multi-span suspension bridges part 1: simple estimation formulas

  • Zhang, Li-Wen;Xiao, Ru-Cheng;Sun, Bin;Jiang, Yang;Zhang, Xue-Yi;Zhuang, Dong-Li;Zhou, Yun-Gang;Tu, Xue
    • Structural Engineering and Mechanics
    • /
    • v.47 no.2
    • /
    • pp.265-286
    • /
    • 2013
  • A study on economic performances of consecutive multi-span suspension bridges is carried out. In this part of the study, material amount and structural cost estimation formulas of the bridges is derived based on the structural ultimate carrying capacity. The bridge cost includes the part of superstructure and the part of substructure. Three types of bridge foundations, bored piles, concrete caissons and floating foundations, are considered in substructure. These formulas are to be used for the parametric study of the bridge cost in order to define its more economical layout under different conditions in the part two of the study.

A Case Study on Caisson Foundation Grouting in Geo-Ga Bridge (거가대교 케이슨기초 그라우트 충전 사례연구)

  • Bae, Kyung-Tae;Cha, Kyung-Seob;Kim, Young-Jin;Park, Chung-Whan;Jeong, Gyeong-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1046-1050
    • /
    • 2010
  • During construction of a sea-crossing bridge grouting was used to fill densely the space between the bottom of caisson and the ground. This grout mixture was mixed with an anti-washout admixture after locating accurately the pre-cast caisson on three concrete landing pads. This method differs significantly from the costly conventional method, for bridge foundations offshore, where concrete is placed in situ after excavating inside of a temporary concrete coffering wall. To verify the grouting method in advance, the full-scale field tests were performed twice on land. After identifying the fluidity of the grout material to be filled, finding some possible problems with the main construction and revising the original design, the main construction has been continuing successfully with 20 caissons completed to date. The purpose of this paper is to introduce for the first time in Korea the grouting method including the automatic and the manual monitoring system based on the main construction of the caisson foundation.

  • PDF

Safety assessment of caisson transport on a floating dock by frequency- and time-domain calculations

  • Kang, H.Y.;Kim, M.H.
    • Ocean Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.99-115
    • /
    • 2014
  • When caissons are mounted on a floating transportation barge and towed by a tug boat in waves, motion of the floating dock creates inertia and gravity-induced slip forces on the caisson. If its magnitude exceeds the corresponding friction force between the two surfaces, a slip may occur, which can lead to an unwanted accident. In oblique waves, both pitch and roll motions occur simultaneously and their coupling effects for slip and friction forces become more complicated. With the presence of strong winds, the slip force can appreciably be increased to make the situation worse. In this regard, the safety of the transportation process of a caisson mounted on a floating dock for various wind-wave conditions is investigated. The analysis is done by both frequency-domain approach and time-domain approach, and their differences as well as pros and cons are discussed. It is seen that the time-domain approach is more direct and accurate and can include nonlinear contributions as well as viscous effects, which are typically neglected in the linear frequency-domain approach.

Design and construction of the GK immersed tunnel of Busan-Geoje Fixed Link Project (국내 최장 GK 침매터널의 설계 및 시공)

  • Kim, Yong-Il;Kim, Woong-Ku;Kim, Je-Chun;Lee, Jung-Sang;Kim, Kyoung-O
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.71-76
    • /
    • 2009
  • The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project.

Vibration-based damage monitoring of harbor caisson structure with damaged foundation-structure interface

  • Lee, So-Young;Nguyen, Khac-Duy;Huynh, Thanh-Canh;Kim, Jeong-Tae;Yi, Jin-Hak;Han, Sang-Hun
    • Smart Structures and Systems
    • /
    • v.10 no.6
    • /
    • pp.517-546
    • /
    • 2012
  • In this paper, vibration-based methods to monitor damage in foundation-structure interface of harbor caisson structure are presented. The following approaches are implemented to achieve the objective. Firstly, vibration-based damage monitoring methods utilizing a variety of vibration features are selected for harbor caisson structure. Autoregressive (AR) model for time-series analysis and power spectral density (PSD) for frequency-domain analysis are selected to detect the change in the caisson structure. Also, the changes in modal parameters such as natural frequency and mode shape are examined for damage monitoring in the structure. Secondly, the feasibility of damage monitoring methods is experimentally examined on an un-submerged lab-scaled mono-caisson. Finally, numerical analysis of un-submerged mono-caisson, submerged mono-caisson and un-submerged interlocked multiple-caissons are carried out to examine the effect of boundary-dependent parameters on the damage monitoring of harbor caisson structures.

Numerical and experimental study on evaluating the depth of caisson foundation with Sonic Echo method

  • Tong, Jian-Hua;Liao, Shu-Tao;Liu, Kang-You
    • Earthquakes and Structures
    • /
    • v.3 no.3_4
    • /
    • pp.519-532
    • /
    • 2012
  • Using nondestructive testing techniques to evaluate the length or depth of an existing foundation is an important issue with potential high application values. One of these is to evaluate whether the foundation is broken after severe earthquakes. In this aspect, academic research related to nondestructive evaluation for caisson foundations is rarely reported. The objective of this paper is to study the feasibility of using Sonic Echo method to evaluate the depth of caisson foundations. Two types of caissons, simple cylindrical caisson and compound caisson with chambers, were studied for their responses to the Sonic Echo tests. The study was carried out in numerical simulation with finite element method and experimental way with in-situ tests. A bridge system which spans over Sofong Brook in Taiwan was selected for the tests in situ. The bridge system is still under construction and therefore the effect of different construction stages on the testing results may be studied. In this paper, the parameters to be varied for the studies include the testing locations and the existence of chamber plates, the bottom plate and the top plate. Finally some preliminary conclusions can be reached for a successful test.

Comparison of Maximum Horizontal Wave Force Acting on Perforated Caisson Breakwater with Single and Double Chamber (단일 및 이중유수실 유공케이슨 방파제에 작용하는 최대 수평파력 비교)

  • Oh, Sang-Ho;Ji, Chang-Hwan;Oh, Young Min;Jang, Se-Chul;Lee, Dal Soo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.26 no.5
    • /
    • pp.335-341
    • /
    • 2014
  • Physical experiments were carried out to measure the wave force on the vertical walls of perforated breakwater considering several phases of a wave acting on the breakwater. The maximum horizontal wave force acting on each vertical wall was compared between single and double chamber caisson breakwater. The experimental data in this study showed that the total horizontal wave force for double chamber caisson was 9.6% smaller on average than that for single chamber caisson when the total chamber width was the same for both caissons. Such reduction of the wave force is due to the dissipation of wave energy at the porous middle wall, which is located between the porous front wall and non-porous rear wall.