Drilled Shaft Designs and Constructions using Pile Load Tests at the Government-Financed Section of Incheon Bridge (재하시험을 활용한 인천대교 국고구간 현장타설말뚝의 설계와 시공)
-
- Proceedings of the Korean Geotechical Society Conference
- /
- 2006.10a
- /
- pp.562-573
- /
- 2006